Disaster Recovery Limepoint Fire Trails Stabilization Payette National Forest
Archived on March 21, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MST
- Posted
- February 25, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH
- Place of performance
- Council, Idaho, 83612
- PSC
- Z1PA: MAINTENANCE OF RECREATION FACILITIES (NON-BUILDING)
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 12363N26Q0005
- Notice ID
- 0b5664757534472181d671f819c14efe
Description
Date for quotes extended to 06MAR2026 and Completion Date extended to 15NOV2027. See Q&A attached.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.
Solicitation number 12363N26Q0005 is issued as a Request for Quotation (RFQ) for Trails Stabilization on the Payette National Forest.
This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Construction The small business size standard is $45 Million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Statement of Requirement
Background The 2024 Limepoint Fire affected nearly the entirety of the 12.2 mile long trail system accessed from the Kinney Creek, Allsion Creek, and Eckels Creek Trailheads along Hells Canyon Reservoir on Payette National Forest.
Description of Project Work must be performed to restore sustainable trail tread to portions of the trail where this has been affected by loss of anchoring vegetation and post fire run-off, as well as to make the trail system more resistant to future runoff due to long-term fire effects. As such, the overall goal is to restore a full trail bench (see Plans) to the entirety of the trail system or, as much as possible with the funding available, as well as adding drainage features where necessary to withstand erosion. Install signs at junctions of 222 and 221, 514 and 223, 223 and 225; Install Kinney Creek Trailhead sign the beginning of the 221 and Hells Canyon Road junction.
Location All work will be performed on the sections of National Forest System (NFS) Trails no. 221 (Kinney Cr.), 222 (Kinney Cr.-Eckels Cr.), 223 (Eckels Cr.), and 514 (Allison Cr.) shown on the attached map. These trailheads are in the general vicinity of the Big Bar Recreation Area along Hells Canyon Road. All are located on the Council Ranger District of Payette National Forest. This is located approximately 54 road miles north of Cambridge, ID, accessed via State Hwy 71 to Hells Canyon Road.
Period of Performance The period of performance for the base and optional items begins on the effective date of the Notice to Proceed (NTP) and runs through November 15, 2026. The end date may be extended depending on the availability of funds.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (7)
- Download
12363N26Q0005 0001 Payette Limepoint Fire Trails Stabilization.pdf
434 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
12363N26Q0005 Payette Limepoint Fire Trails Stabilization.docx
71 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATT 1 Statement of Work.docx
21 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATT 2 Limepoint Fire Trail Stabilization Specifications.doc
183 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATT 3 Limepoint Fire Trail Stablization Plans_FINAL.pdf
3.3 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATT 4 Select Pictures.pdf
31 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
ATT 5 Wage Determinations ID0036 and 95-0228.pdf
124 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Disaster Recovery Limepoint Fire Trails Stabilization Payette National Forest
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
Disaster Recovery Limepoint Fire Trails Stabilization Payette National Forest
- 6Version 6Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Disaster Recovery Limepoint Fire Trails Stabilization Payette National Forest
Similar Opportunities
Additional Details
Solicitation Number
12363N26Q0005
Archive Date
Mar 21, 2026
Office Address
Washington, DC, 202501138