GovChime
Notice ID: a6e4f14149a84577ad749027accbd4f3Combined Synopsis/SolicitationArchived

SCHOFIELD BARRACKS BLDG 582 TR REMEDIATION

Archived on June 20, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
9:00 AM HST
Posted
May 30, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541519: Other Computer Related Services
Agency
Department of WarDepartment of the Army

Notice details

Office
0413 AQ HQ RCO-HI
Place of performance
Schofield Barracks, 96857
Last updated
Nov 13, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912CN25Q0019
Notice ID
a6e4f14149a84577ad749027accbd4f3

Description

TR REMEDIATION FOR BLDG 582 ON SCHOFIELD BARRACKS, HAWAII. SEE ATTACHED PWS FOR DETAILS. SITE VISIT SCHEDULED FOR 30 MAY 2025 @ 10AM BLDG 582, SCHOFIELD BARRACKS, HAWAII. FAR 52.237-1 SITE VISIT - Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. FAR 52.212-1, INSTRUCTIONS TO OFFERORS Commercial Items: 1.1. INSTALLATION 1.2. The contractor will complete the following requirement(s) as stated below: 1. The existing backboard shall be removed and a NEW 4 x8 fire-rated backboard shall be installed in its place. 2. The existing wall-mounted rack shall be removed and replaced with a NEW wall-mounted network cabinet; any existing network equipment on the legacy rack shall be removed prior to removal of the legacy rack. 3. Equipment removed from the legacy rack shall be re-installed in the new enclosed network cabinet; the existing Cisco switch shall be bonded to the Rear Bonding Busbar (RBB); and all cables shall be reconnected to their respective positions prior to disconnection. 4. A NEW L5-20R PDU shall be installed in the enclosed network cabinet with the appropriate accessories/adapters. 5. The electrical outlet shall be converted to support the newly installed L5-20R Power Distribution Unit (PDU). 6. A NEW 2-hole, copper Primary Bonding Busbar (PBB) shall be installed and bonded to the appropriate power panel and shall use #2 AWG grounding cable enclosed in a 1 Electrical Metallic Tubing (EMT). 7. A NEW 2-hole lug, copper Rear Bonding Busbar (RBB) shall be installed in the cabinet and bonded to the PBB; a #6 AWG grounding cable shall be used for this bonding. 8. Ten (10) NIPR drops shall be installed and labeled in multiple locations and shall utilize a 2-port and 4-port faceplate configuration where specified. 9. Category 6 (CAT6) cabling shall be used, and its color will be GREEN to adhere to the Network Enterprise Center (NEC) s standard for data cabling. 10. Cabling Pathways should utilize the appropriate materials (i.e. j-hooks, EMT, cable trays, etc.) for traversing the building infrastructure from the cabinet to termination points. EVALUATION FACTORS FOR AWARD: The provision at FAR 52.212-2 Evaluation Commercial Products and Commercial Services (NOV 2021) applies to this acquisition. Addendum to FAR 52.212-2, Evaluation Commercial Products and Commercial Services (NOV 2021) Pursuant to FAR 12.302(d), the provision at FAR 52.212-2 is augmented as follows: Basis for Award: Procedures in FAR 13.106 are applicable to this procurement. The Government will award a firm-fixed-price (FFP) contract resulting from this solicitation to the responsible Quoter (as determined within the meaning of FAR Part 9, paragraph 9.104), whose quote conforming to the solicitation is the best value considering price and other factors. The following factors shall be used to evaluate quotes: The specific evaluation criteria for these factors is defined below: 1. Technical Capability Factor (Services): The Government will evaluate the quote to see if the quote and supporting documentation meet the technical requirements identified in paragraph (v) of this solicitation and Performance Work Statement. 2. Minimum Requirement: All proposals will be evaluated on the following criteria for technical acceptance: Detailed Scope of Work (SOW) of their proposed solution Engineered Drawing of their proposed solution (conduit, j-hook, TR location, drop location, etc.) Bill of materials (BOM) breakdown (manufacturer, part #, quantity, price) Labor breakdown (title, work hours, hourly rate, cost) Total cost (shipping, rental cost if any, misc., etc.) PDF or Auto Cad is acceptable for soft copies for review prior to final walkthrough. Final deliverables (post award) must have 2 sets of hard copies to include cds of as-builts, test results, rack elevation drawing. 2. Price Factor: The Government will evaluate the total overall price for completeness and to determine if it is fair and reasonable IAW FAR13.106-3(a). If competitive quotes are not received, the Government reserves the right to utilize other methods identified in the FAR to determine price reasonableness. Award will be to the lowest priced technically acceptable offeror. Clause 52.212-3 Offeror Representation and Certifications Commercial Items (if not entered into System for Award Management (SAM). If any representation or certification cannot be completed in SAM, fill in the provision provided in the RFP and submit with the proposal. Responsibility Determination Narrative. For purposes of conducting responsibility determination, submit a 1-page narrative addressing the following. The responsibility determination will only be conducted on the apparent successful contractor. a. Adequacy of financial resources to perform the contract, or the ability to obtain them; b. Ability to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments; c. Adequacy of the company/firms performance record. d. Description of how the company/firm maintains integrity and business ethics. e. Adequacy of the company/firms organization, experience, and technical skills, or the ability to obtain them (including, as appropriate, such elements as quality assurance measures and safety programs applicable to materials to be delivered and services to be performed by the prospective contractor and subcontractors). PURPOSE of this AMENDMENT is to: 1) added an informational drawing (2025-MAY-30-SCFD-schofield-barracks-military-reservation-582-01) to the solicitation for Bldg 582 TR remediation. Any questions should be addressed to POC Maletta Chan 808-787-8873.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (4)

  • 2025-MAY-30-SCFD-schofield-barracks-military-reservation-582-01.pdf

    89 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Directions to SB582 From Lyman Gate.png

    1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SB B582 NIPR Drops Drawing.pdf

    114 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SB582 GYM PWS Final.pdf

    108 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    SCHOFIELD BARRACKS BLDG 582 TR REMEDIATION

    Notice e7f599c3aa244f95add1eba222c18ed1 on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    SCHOFIELD BARRACKS BLDG 582 TR REMEDIATION

    Notice a6e4f14149a84577ad749027accbd4f3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912CN25Q0019

Archive Date

Jun 20, 2025