GovChime
Notice ID: bc1edfd11f2243afb16ee05156fff750SolicitationArchived

Transition Power Supply Installation IDIQ with the Radar Operations Center

Archived on August 5, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
July 13, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
Agency
Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Notice details

Office
DEPT OF COMMERCE NOAA
Place of performance
Norman, Oklahoma
PSC
6150: MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1305M226Q0038
Notice ID
bc1edfd11f2243afb16ee05156fff750

Description

The Government is seeking a 5-year IDIQ for the following: 

Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing).

Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing).

and; 

Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION)
 

Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive. 

Amendment 1: posted 7/1/26; includes questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document. 

Amendment 2: posted 7/6/26; no additional documents are included. This amendment only extends the response due date one week to 7/14/26 1:00pm ET. 

Amendment 3: posted 7/13/26; no additional documents are included. This amendment only extends the response due date one additional week to 7/21/26 1:00pm ET. 

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (10)

  • Amendment 1.docx.pdf

    198 KBAdded in Solicitation version 2Posted
    Download
  • Site IP addresses for TPS-UPS (1).xlsx

    15 KBAdded in Solicitation version 2Posted
    Download
  • Sol_1305M226Q0038 (1).pdf

    392 KBAdded in Solicitation version 1Posted
    Download
  • JOFOC for combined synopsis (1)_Redacted (3).pdf

    433 KBAdded in Solicitation version 1Posted
    Download
  • SON Final.docx (5).pdf

    433 KBAdded in Solicitation version 1Posted
    Download
  • Pricing_Schedule (4).xlsx

    59 KBAdded in Solicitation version 1Posted
    Download
  • Past Performance Information Form (5).pdf

    349 KBAdded in Solicitation version 1Posted
    Download
  • Past Performance Questionnaire (5).pdf

    259 KBAdded in Solicitation version 1Posted
    Download
  • TPS Effectivity_All Sites (with SON) (2).pdf

    115 KBAdded in Solicitation version 1Posted
    Download
  • PROCUREMENT MEMORANDUM 2023-12 (5).docx

    14 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Transition Power Supply Installation IDIQ with the Radar Operations Center

    Notice eeed674b550d47fa91486a54fc16b8df on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Transition Power Supply Installation IDIQ with the Radar Operations Center

    Notice dbbec1ac934e4d8ebf13c38086c42ef6 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Transition Power Supply Installation IDIQ with the Radar Operations Center

    Notice d7a6c307770c487abf2ae96b1232f7ab on SAM.gov

  4. 5
    Version 5SolicitationArchivedCurrent

    Transition Power Supply Installation IDIQ with the Radar Operations Center

    Notice bc1edfd11f2243afb16ee05156fff750 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJun 17, 2026

    TPS Installation IDIQ Presolictation Notice

    Notice 6751d4e6b395455db8424faac7ca8d36 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

1305M226Q0038

Archive Date

Aug 5, 2026

Office Address

NORFOLK, VA, 23510