C--Manchester Pier Shimming Project
Awarded on June 26, 2026. Full description on SAM.gov.
Overview
- Posted
- June 26, 2026
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
Notice details
- Office
- DEPT OF COMMERCE NOAA
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 26, 2026
- Award amount (SAM.gov award notice)
- $367.4K
Identifiers
- Solicitation number
- 1305M326Q0067
- Notice ID
- 7564970870f64ae6ba40d64bcd93853b
- Award number (PIID)
- 1305M326P0155
Description
Award Overview
Award Number
1305M326P0155
Award Amount (SAM.gov award notice)
$367.4K
Award Date
Jun 26, 2026
Awardee
Awardee UEI
GGJ2KJ2GDDA1
Awardee CAGE Code
80DY1
Original Solicitation
Notice ID: 7564970870f64ae6ba40d64bcd93853b
Posted Date: Jun 26, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (10)
- Download
Sol_1305M326Q0067_Amd_0002.pdf
234 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
image_(9)_0002.png
3.8 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Sol_1305M326Q0067_Amd_0001.pdf
341 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
1305M326Q0067_SOW_A5_Storage_and_Laydown_Area_0001.jpg
666 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
2026_04_30_-_Contractor_Site_Visit_Sign-In_Sheet_0001.pdf
1.6 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Sol_1305M326Q0067.pdf
473 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
1305M326Q0067_SOW_A2_2025_Manchester_Pier_Load_Rating_Analysis_Report.pdf
11 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
1305M326Q0067_SOW_A1_2024_Manchester_Pier_Inspection_Report.pdf
9.8 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
1305M326Q0067_SOW_A1_Appendix_A.pdf
377 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
1305M326Q0067_SOW_A4_SAM_WD_Davis-Bacon_WA20260126.pdf
274 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 2Version 2Combined Synopsis/SolicitationArchived
C--Manchester Pier Shimming Project
- 5Version 5Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
C--Manchester Pier Shimming Project
Other notices for this solicitation
- Market ResearchRelated noticeFeb 11, 2026
C--Manchester Pier Shimming Project
- Market ResearchRelated noticeFeb 11, 2026
C--Manchester Pier Shimming Project
- Combined SynopsisRelated noticeApr 16, 2026
Manchester Pier Shimming Project
- Combined SynopsisRelated noticeMay 14, 2026
C--Manchester Pier Shimming Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
NOTE: This is a DRAFT Request for Proposals (RFP) The Government will hold virtual 1-on-1 sessions with interested offerors to discuss the DRAFT Design-Build Repair and Renovation of the Gulf Marine Service Facility (GMSF) & Wharf Repairs in Pascagoula, Mississippi. The objective of these sessions is to obtain industry feedback, clarify draft requirements, and gain insight into market capabilities before the final solicitation release. Participation is strictly voluntary and will not impact any offeror’s evaluation under the final solicitation. Registration Guidelines & Requirements First-Come, First-Served: Participation is strictly limited to the first five (5) companies that submit a complete registration request. Company Representation: To maximize participation opportunities across the vendor community, attendance is limited to one (1) session per company/joint venture. Each organization may bring up to four (4) attendees. Session Logistics: Sessions will be conducted virtually via Google Meet and will last a maximum of 60 minutes. Important: To request a session, please complete and submit the Google Form listed in Section J.6 of the DRAFT RFP. Please note that firms are not required to attend one-on-one session in order to submit questions or clarifications to the DRAFT RFP. All interested offerors are encouraged to submit questions and clarifications for the Government's consideration even if they are not attending the one-on-one sessions. Any and all questions shall be submitted no later than November 13, 2026 at 12:00 PM EST. DRAFT Request for Proposals (RFP) No.1305M4-26-R-0034 Project Title: Design-Build Repair and Renovation of the Gulf Marine Service Facility (GMSF) & Wharf Repairs in Pascagoula, Mississippi Location: National Oceanic and Atmospheric Administration (NOAA) Gulf Marine Service Facility (GMSF) 151 Watts Ave, Pascagoula, MS 39567 Classification and General Information: This requirement will be issued as a Total Small Business Set-Aside. The North American Industry Classification System (NAICS) code associated with this procurement is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Administration standard of $45.0 million dollars in annual receipts averaged over a business’s latest three (3) complete fiscal years or (except in the Business Loan, Disaster Loan Programs, Surety Bond Guarantee, and SBIC Programs) five (5) complete fiscal years to determine the average annual receipts. If a business hasn’t been in business for five (5) years, multiply its average weekly revenue by 52 to determine its average annual receipts. This requirement will be a Total Small Business Set-Aside, and the contractor shall be selected using Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 36.101-2 Use of Two-Phase Design-Build Selection Procedures and RFO Part 15.1 Presolicitation and Solicitation procedures. This procurement will be competitive, utilizing the Highest-Technically Rated with a Fair and Reasonable Process approach based on the solicitations’s stated budgetary constraints (affordability) under the Best Value (RFO Part 15.103). The approach prioritizes the best possible performance, provided the price is determined to be fair and reasonable and within the guidelines of the Government’s stated budget. During each phase, all proposals are initially evaluated based solely on the non-price factors specified in the solicitation. Only the price of the highest-ranked technical proposal is then evaluated to ensure it is fair, reasonable and does not exceed our stated budget. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price. This requirement will result in a Firm-Fixed-Price contract for design and construction services. | 41% | Market Research | 11/13/2026 |
EVENT DETAILS: Date: 3 December 2026 Time: 0930-1430 PT Format: Presentation & Site walk Registration Due Date: 23 November 2026, 1200 PT; Please register by returning completed Request for Visit Authority (RVA) by email to: Sarah Malowicki, Project Manager, at sarah.m.malowicki@usace.army.mil, AND Londres Medranda, Contract Specialist, at londres.medranda@usace.army.mil. Confirmation email will be sent upon receipt of completed RVA. Who Should Attend: Interested vendors, including small businesses, large businesses, and other industry partners. Attendance is limited to 2 personnel per company. Attendance is limited to United States Citizens. Attendance at this event is not mandatory. Pre-registration is required. DESCRIPTION: In accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(a) Early exchanges with industry, the United States Army Corps of Engineers (USACE), Seattle District (NWS) is hosting an Industry Day on 3 December 2026 at Chief Joseph Dam in Bridgeport, Washington. This Industry Day provides an opportunity for interested parties to inspect the existing 15.5KV Main Unit XJ Breaker disconnects first-hand. By hosting this first-hand inspection, the government aims to gather technical feedback and explore industry alternatives for modernizing this equipment. We are seeking input from qualified, experienced sources, capable of performing this modernization work. PROJECT BACKGROUND: At Chief Joseph Dam the current Unit 1-16 XJ Breaker disconnects are original BBC (Brown Boveri Corporation) equipment and rated 6000A according to the BBC shop drawings. The switch operators are pneumatically driven, and are actuated by operation of a complex key interlocking scheme with the circuit breaker. The load side and source side disconnects are mechanically linked and simultaneously operated by a single shared pneumatic actuating system. The current Units 17-27 breaker disconnects are original GE equipment. The load side and source side disconnects are mechanically linked and simultaneously controlled by mechanically operated hand crank. USACE is evaluating options to improve reliability, maintainability, remote-operating capability, and overall generating-unit availability. • Option 1: Refurbish and restore existing disconnect switches to an approved condition equivalent to original design intent, as technically feasible. Integrate motorized mechanisms on the switch arms to enable remote operation, and comprehensively overhaul and test the existing main unit breakers to ensure optimal system protection. • Option 2: Replace the disconnect switches with new electrically operated units and refurbish the existing breakers. • Option 3: Replace both the disconnect switches (with new electrically operated units) and the main unit circuit breakers. • Option 4: Replace the entire switchgear assembly with new enclosures, modern electrically operated disconnect switches, and new circuit breakers (includes associated controls, protection, buswork and new enclosure). Chief Joseph Dam has several critical limitations that affect this project, primarily related to space constraints. This Industry day will present the options under consideration, obtain industry feedback on technical feasibility and constructability, and identify potential risks, constraints and cost drivers. USACE is requesting feedback on the following questions and relevant, non-binding information: Does your company have the ability, capacity, interest and willingness to perform the proposed options? Does your company have experience with comparable medium-voltage/high-current generation-station disconnect and breaker modernization projects? We are not currently requiring quotes or bids, however rough estimates would be greatly appreciated. Recommended technical approaches or alternatives Major schedule outage, access, safety, supply-chain or constructability risks. Do you believe all aspects of this requirement could be successfully performed by the small business sector under NAICS 237990 (Size standard $45M)? (Yes/No). If No, what estimated percentage do you think can be subcontracted out to small business? Small Business (SB) ______% Small Disadvantaged Business (SDB) ________% Woman-Owned SB (WOSB) _______% Veteran Owned SB (VOSB) _______% Service Disabled VOSB (SDVOSB) _______% Historically Underutilized Business Zone (HUBZone) _______% Important Notice: Attendance and participation is not required for consideration on future contracts related to this work. The U.S. Government is not obligated to pay for any information, documentation, demonstrations, or data provided, nor will it reimburse any costs incurred by your organization in preparing responses, traveling to, or participating in this Industry Day and physical equipment inspection. All costs associated with attending this event and participating in this information exchange are solely at the responding party’s expense. Small Business Program Inquiries: Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project. | 35% | Special Notice | 11/23/2026 |
Northwest Division Powerhouse Life Safety Upgrades Stage 1 The U.S. Army Corps of Engineers (USACE), Walla Walla District, intends to issue a single-phase solicitation on or about 30 November 2026 for a Construction Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple-Award Task Order Contract (MATOC). The anticipated MATOC will provide construction services for renovation and upgrade projects at hydroelectric powerhouses located at large, remote civil works projects within the Northwestern Division. The primary area of performance is anticipated to include USACE Walla Walla District projects at McNary, Ice Harbor, Lower Monumental, Little Goose, Lower Granite, and Dworshak. Task orders may also include work at other USACE projects within the Pacific Northwest, including locations within the Seattle and Portland Districts in Washington, Oregon, Idaho, and Montana. The U.S. Army Corps of Engineers, Walla Walla District, anticipates awarding up to four (4) IDIQ MATOCs. At least one, and up to two, MATOCs will be reserved for award to qualified small business concerns. Task orders issued under the MATOCs will be firm-fixed-price. The aggregate shared contract capacity for all awarded MATOCs is anticipated to be $99 million. Each contract is anticipated to include a 36-month base period and two (2) 24-month option periods, exercisable at the Governments discretion. The Government may issue individual task orders with values up to $25,000,000. The Government reserves the right to issue additional solicitations and award additional contracts for the same or similar work within the geographic area covered by the MATOCs. The applicable North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction. This notice is for informational purposes only and is not a solicitation. The solicitation is anticipated to be issued on or about 30 November 2026. Summary Scope of Work: The purpose of this IDIQ MATOC is to provide construction services to renovate and upgrade life-safety systems at large hydroelectric powerhouses located at large, remote civil works projects. These powerhouses may range in size from 75,000 square feet to 420,000 square feet and from 5 stories to 11 stories. The work may consist of the following major industrial construction elements for installation and/or modification: 1. Fire detection and mass notification alarm systems 2. Wet pipe, fine water mist, and clean agent sprinkler fire suppression system(s) 3. Smoke control system, including stair pressurization fans, smoke exhaust fans, motorized fire-smoke dampers, and complex logic and programming matrix digital controls 4. HVAC direct digital controls 5. HVAC ventilation and conditioning equipment, dampers, and ductwork 6. Fabricated steel stairs and guardrails 7. Architectural fire barrier walls, fire doors, safety glazing and finishes 8. Firestopping 9. Emergency and exit lighting systems 10. Electrical power supply and distribution 11. Precast concrete 12. Low-slope roofing 13. Specific aspects of this project that may be especially challenging include: a. Robust industrial safety protocols with rigorous lockout tagout procedures b. Construction in a continuously operating industrial environment c. Proximity to high voltage equipment and transmission lines d. Multiple underground levels with limited access e. Fire alarm designers and installers must be NICET Level III or IV certified f. Work in ceilings up to 60 feet high The project will involve the development and management of Contractor furnished submittals for items such as shop drawings, product data, commissioning plans, and contract close-out documentation as required by technical specifications of the task orders. Miscellaneous work within the project includes the delivery of Record Drawings. Placement of Task Orders. The actual amount of work to be performed and the time of such performance will be determined by a Contracting Officer who will issue written task orders. Prices will be requested and evaluated for each task order in accordance with FAR 16.505. The Government will evaluate price and past performance at a minimum but may include additional non-price factors. Each RFP will state the method of selection and any additional non-price factors. Whenever possible, award will be made without discussions. If discussions are required, each contractor included in the competitive range will be requested to provide a final proposal revision, unless eliminated from discussions. Important Note: The sam.gov response date listed elsewhere in this synopsis is for the sam.gov archive purposes only. It has no relationship to the actual proposal submission date. The proposal submission date will be contained in the solicitation and any solicitation amendments that are issued. When issued, the solicitation documents for this project will be available via sam.gov. No CDs OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking the reference page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to sam.gov and add the solicitation to your watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation on sam.gov. | 35% | Pre-Solicitation | 01/08/2027 |
CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep. Amend 0001 - 1. Update the solicitation number from W912DW26RA053 to W912DW27RA020 on Chief Joseph 480V SQ1 - SQ3, DSQ1 - DSQ2 Replacement Drawings and Chief Joseph 480V SQ1 - SQ3, DSQ1 - DSQ2 Replacement Specs. 2. Add Request for Visitation Authority (RVA). | 35% | Solicitation | 12/18/2026 |
Title: SIOP MMDD MACC. The Naval Facilities Engineering Systems Command (NAVFAC) has a requirement to provide predominantly construction services (design build (DB) and design-bid-build (DBB)) for heavy and civil engineering waterfront facilities as well as commercial and institutional facilities primarily in support of the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), located at Naval Base Kitsap (NBK) Bremerton, Washington and other areas under the cognizance of NAVFAC Pacific. This solicitation will result in the award of Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contracts (MACC). The period of performance will be a base period of 5-years and one (1) 5-year option period for a maximum possible duration of 10-years; or an aggregate maximum estimated value of $15,000,000,000 for all task orders, whichever occurs first. The typical size of major construction task orders will range from $2,000,000,000 to $6,000,000,000; however, smaller task orders may be issued to support smaller efforts such as Early Contractor Involvement (ECI) and/or Alternative Technical Concepts (ATC). Task orders may be above this limit; however, contractors are not obligated to accept such task orders under the general terms of the contract. Each MACC holder will receive a minimum guarantee in the amount of $1,000,000. This solicitation is unrestricted allowing for full and open competition. Large businesses are advised that an acceptable small business subcontracting plan is required. Primary North American Industrial Classification System (NAICS) code 237990 - Other Heavy and Civil Engineering Construction; Small Business Size Standard: $45M.Secondary NAICS code 236220 - Commercial and Institutional Building Construction; Small Business Size Standard: $45M. Amendment 0001- Issued 21 October 2026. Amendment 0002- Issued 28 October 2026. Amendment 0003- Issued 05 November 2026. Refer to the link to the PIEE Solicitation Module for all solicitation documents, attachments, amendments, and related details. | 35% | Solicitation | 12/01/2026 |
Additional Details
Solicitation Number
1305M326Q0067
Archive Date
Jul 11, 2026
Office Address
SEATTLE, WA, 98115