Holden Beach Removal and Replacement of Mooring Clusters
Archived on February 10, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EST
- Posted
- January 15, 2026
- Notice type
- Solicitation
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST WILMINGTON.W074 ENDIST WILMINGTON
- Place of performance
- North Carolina, 28462
- PSC
- F021: NATURAL RESOURCES/CONSERVATION- SITE PREPARATION
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912PM26QA013
- Notice ID
- 58818b411c674ae1b52688a9d278407d
Description
PROJECT TITLE: HOLDEN BEACH: REMOVAL AND REPLACEMENT OF MOORING CLUSTERS PROJECT LOCATION: HOLDEN BEACH, NC
THIS SOLICITATION IS A REQUEST FOR QUOTE UNDER FAR PART 13 - SIMPLIFIED ACQUISITION PROCEDURES. THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000.00 AND $250,000.00
------------------- 100% SMALL BUSINESS SET-ASIDE ------------------------
AWARD WILL BE MADE TO THE LOWEST PRICED, TECHNICALLY ACCEPTABLE QUOTE.
NOTICE: SECTION 00 45 00 - PROVISION 52.204-8, ANNUAL REPRESENTATIONS AND CERTIFICATIONS TO BE SUBMITTED VIA EMAIL WITH QUOTE.
REQUESTS FOR INFORMATION OR ANY QUESTIONS, MUST BE SUBMITTED BY 14 JANUARY 2026, 2:00 PM EST. REQUESTS FOR INFORMATION OR QUESTIONS WILL NOT BE ACCEPTED AFTER 2:00 PM, EST. ALL REQUESTS, QUESTIONS, AND QUOTE SUBMISSIONS SHALL BE VIA EMAIL DIRECTED TO DIANA.D.CURL@USACE. ARMY.MIL AND JENIFER.M.GARLAND@USACE.ARMY.MIL. INQUIRIES AND REQUESTS THAT ARE DIRECTED TO ANY OTHER PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND, THEREFORE, MAY NOT BE ANSWERED.
QUOTES ARE DUE BY 2:00 PM, EST, JANUARY 26, 2026. SUBMIT YOUR QUOTES ELECTRONICALLY TO DIANA.D.CURL@USACE.ARMY.MIL AND JENIFER.M. GARLAND@USACE.ARMY.MIL
Site Visit: A site visit has been scheduled for:
Tuesday, January 13, 2026 at 9:00 AM E.T.
Location: Holden Beach Pavilion Area
Address: 131 Jordan Blvd, Holden Beach, NC 28462
Point of Contact for the site visit, is the Contracting Officer's Representative, Donald Wiggins: donald.o. wiggins@usace.army.mil, Phone: 910-600-2056.
RSVP for the site visit to diana.d.curl@usace.army.mil, jenifer.m.garland@usace.army.mil, and donald.o. wiggins@usace.army.mil NLT Friday, January 9, 2026 4:00 P.M. ET.
INSTRUCTIONS TO OFFERRORS
NOTE 1: AWARD WILL BE MADE TO THE LOWEST PRICED, TECHNICALLY ACCEPTABLE OFFER.
NOTE 2: IN ORDER TO BE CONSIDERED TECHNICALLY ACCEPTABLE, THE CONTRACTOR MUST
SUBMIT THE FOLLOWING WITH THEIR QUOTE:
- The offeror is registered and has no active or inactive exclusions listed in their Entity Record on the System for Award Management (SAM).
- Offerors are required to submit prior experience of recent and relevant contracts/projects. Contracts/Projects can be performed with Federal, State, local or private companies. Government contracts are preferred but not required.
- Contracts/Projects that are relevant are defined as those that are similar to the requirements of the Statement of Work (SOW). Contracts/Projects that are recent are defined as those that have been completed within the last five (5) years.
- A minimum of two (2) contracts/projects shall be provided to include: contract number, title of project, detailed description of work performed, and Point of Contact. Please do not submit more than five (5) contracts/projects.
- In order for an Offeror to be determined technically acceptable, the offeror must show previous experience with the type of work described in the SOW. Offerors must show previous experience on a minimum of two (2) contracts/projects.
- The Offeror must provide a technical proposal that explains how the requirements in the SOW will be carried out.
- The Offeror must submit a valid North Carolina Marine or Building contractors Licensing.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (6)
- Download
A21 - Fender pic.jpg
887 KBAdded in Solicitation version 4Posted - Download
A23 - Site Visit Sign In Sheet.pdf
908 KBAdded in Solicitation version 4Posted - Download
A21 - W912PM26QA013 - Holden Beach- Questions and Responses -01-15-2026.xlsx
23 KBAdded in Solicitation version 4Posted - Download
A21 - WD NC20260078 dtd 01-02-2026.pdf
1.4 MBAdded in Solicitation version 1Posted - Download
A21 - SOW_Holden-Beach-Piling-Clusters__Final.pdf
756 KBAdded in Solicitation version 1Posted - Download
A21 - Solicitation - W912PM26QA013_Final.pdf
554 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Holden Beach Removal and Replacement of Mooring Clusters
- 4Version 4SolicitationArchivedCurrent
Holden Beach Removal and Replacement of Mooring Clusters
- 6Version 6Award NoticeArchived
Type changed from Solicitation to Award Notice
Holden Beach Removal and Replacement of Mooring Clusters
Similar Opportunities
Additional Details
Solicitation Number
W912PM26QA013
Archive Date
Feb 10, 2026
Office Address
WILMINGTON, NC, 28403-1343