Notice ID: 9d7794619b004d34bd73f371ca0e7928Combined Synopsis/SolicitationArchived
50-60-Ton Rough Terrain Crane Rental
Archived on August 2, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM CDT
- Posted
- July 7, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 532412: Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ST PAUL
- Place of performance
- Fergus Falls, 56537
- Last updated
- Nov 12, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912ES25QA030
- Notice ID
- 9d7794619b004d34bd73f371ca0e7928
Description
Scope of Work for 50-to-60-ton Rough Terrain Crane for Orwell Dam Dewatering The purpose of this contract is to provide a minimum of 50-ton and maximum of 60-ton Rough Terrain Hydraulic Crane. The crane shall have a minimum Boom Length of 100 ; Jib would not be needed but is acceptable. The crane shall be capable of lifting 10,500 lbs. (after all deductions) at a radius of 60 with outriggers fully extended to maximum distance of 23 center of beam cylinders. Delivery date of the crane shall be on or before 25 August 2025 and tentative pickup date 29 September 2025 with two (2) one (1) week options. The first option week will begin on 9/29/2025 and end on 10/6/2025. The second option week will begin on 10/6/2025 and end on 10/13/2025. Hours for delivery and pick-up must be between 8:00 AM and 3:00 PM. No deliveries will be received on holidays or weekends. A service technician shall be available within three hours of notification of a breakdown or malfunction. The Crane shall be inspected by a qualified person in accordance with EM 385-1-1 which is the U.S. Army Corps of Engineers Safety Manual. This is available at the USACE Web Site: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf A certificate of compliance shall be provided to USACE by the equipment rental company, a copy of the annual crane inspection, daily operational checklist and any brief machine specific training for the operation of the crane. In addition, upon delivery of the crane, the crane shall be inspected with USACE personnel and contractor to verify the condition of the crane before it is in the possession of USACE. Crane rental only, USACE employees will operate crane. Rigging is not required. The Contractor shall quote a weekly rate for the Crane and include the cost for transportation of the crane to and from the job site. Contractor shall also quote on two (2) one (1) week options. Any routine maintenance that would need to be performed during the rental period should also be included in the rental rate. All options will be evaluated based on price and only exercised if needed. The Crane shall be delivered and picked up at the site of the dewatering to include unloading and loading: USACE Orwell Dam 14780 Orwell Road Fergus Falls, MN 56537
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Kevin P. Henricks
Documents
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
50-60-Ton Rough Terrain Crane Rental
- 2Version 2Combined Synopsis/SolicitationArchived
50-60-Ton Rough Terrain Crane Rental
- 4Version 4Combined Synopsis/SolicitationArchivedCurrent
50-60-Ton Rough Terrain Crane Rental
- 7Version 7Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
50-60-Ton Rough Terrain Crane Rental
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912ES25QA030
Archive Date
Aug 2, 2025