Notice ID: 7f66c39e2986cd83e293944c710380d5Combined Synopsis/Solicitation
Replace Playground Fencing, Bldg. 1994
Archived on May 8, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM UTC−05:00
- Posted
- April 18, 2019
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238990: All Other Specialty Trade Contractors
Notice details
- Place of performance
- Building 1994 , Hanscom Afb, MA, 01731
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- FA283519RA009
- Notice ID
- 7f66c39e2986cd83e293944c710380d5
Description
UPDATE (18 April 2019): Attached is an additional site picture, and questions with answers recieved following the site visit. NOTE: All requirements needed for this project are in the attachments provided. Please read and review them in their entirety.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Select documents to download
Showing 6 of 6 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | SAM.gov | Apr 18, 2019 | - | |||
| Combined Synopsis/Solicitation | SAM.gov | Apr 18, 2019 | - | |||
| Combined Synopsis/Solicitation | SAM.gov | Apr 18, 2019 | - | |||
| Combined Synopsis/Solicitation | SAM.gov | Apr 18, 2019 | - | |||
| Combined Synopsis/Solicitation | SAM.gov | Apr 18, 2019 | - | |||
| Combined Synopsis/Solicitation | SAM.gov | Apr 18, 2019 | - |
Lifecycle
Solicitation:
FA283519RA009- Combined Synopsis
- 2×Combined SynopsisCurrentApr 8, 2019
Replace Playground Fencing, Bldg. 1994
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0002 - Industry Q&A Amendment 0001 - Site Visit Information and Extension to Closing Date The VA Boston Healthcare System is seeking a vendor for for a localized replacement-in-kind repair of the existing perimeter security fence at the Brockton VA Campus located at 940 Belmont Street, Brockton, MA 02301. The existing fence is identified in the submitted repair documents as an Ameristar Impasse Trident system and has sustained damage associated with winter snow-removal activities. The work shall restore the damaged portion to the original fence alignment, configuration, appearance, structural stability, and security function. It does not authorize a new fence line, additional fenced area, expansion, or redesign of the undamaged perimeter. Work is limited to the damaged fence section and associated posts, footings, connections, and adjacent areas necessarily disturbed during repair. The existing, undamaged fence shall remain in place and be protected. The identified benchmark product is the existing Ameristar Impasse Trident perimeter security fence. The Government intends to restore the damaged portion in kind. Offerors may quote genuine Ameristar components or an alternate manufacturer’s components only when the proposed complete installed system meets every applicable salient characteristic below and interfaces with the retained fence without a reduction in security or a change to the existing fence line.The salient characteristics are included within the Statement of Work (SOW). | - | Combined Synopsis | 11/13/2026 |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | - | Combined Synopsis | 11/23/2026 |
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process. | - | Solicitation | 11/11/2026 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 124PSA27Q0027 is issued as a Request for Quotation (RFQ) for replacement of cattle shades. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238990 The small business size standard is $19.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. | - | Combined Synopsis | 11/24/2026 |
Market Research Only – Not a Request for Proposal Title: Counter-Unmanned Aircraft System (C-UAS) Netting Installation for Aircraft Sunshade Structures Notice Type: Sources Sought NAICS Code: 238990 – All Other Specialty Trade Contractors Response Due Date: 13 November 2026, 4:00 PM Local Time Submit Responses To: matthew.lahr.3@us.af.mil 1. Purpose The United States Air Force is conducting market research to identify qualified sources capable of providing all design, materials, labor, and equipment necessary to furnish and install counter-Unmanned Aircraft System (UAS) netting on existing aircraft sunshade structures. A primary purpose of this notice is to determine whether this requirement can be set aside for small businesses under the SBA guidelines for NAICS 238990. The Government is seeking to determine the availability and capability of small business concerns (including 8(a), HUBZone, SDVOSB, and WOSB) to perform this work. This notice is issued solely for market research and small business set-aside determination purposes in accordance with FAR Part 10. It does not constitute a Request for Proposal (RFP), Invitation for Bid, or any other form of solicitation. The Government does not guarantee that a contract will result from this notice, and the Government will not reimburse any costs incurred by interested parties in preparing or submitting a response. The Government is also interested in unique and innovative solutions, including any proof-of-concept or operational C-UAS netting installations already fielded or under evaluation at other Department of Defense installations. 2. Requirement Overview The contractor shall design, furnish, and install counter-UAV netting on all four sides of six (6) existing aircraft sunshade structures. Each structure is approximately: Length: 630 feet Width: 65 feet Height: 30 feet Configuration: 6 bays per structure A drawing of the aircraft sunshade structures is attached to this notice. Primary Objective: Prevent Group 1 (“small”) Unmanned Aerial Vehicles from penetrating the interior of the sunshade structures to protect aircraft and personnel. 3. Technical Requirements (Minimum) The proposed netting system must meet or exceed the following: Material: UV-resistant, moisture-resistant, capable of withstanding temperatures up to 400°F. Polyester or Nylon are preferred. Tensile strength: 200 lbs or greater. Mesh opening: Netting squares no larger than 3 inches across. Performance: Capable of stopping Group 1 small UAVs from penetrating the structure without compromising the netting. Wind Load: Must meet Miami-Dade County Wind Load rating requirements. Retractability: Netting installed on the north- and south-facing sides shall be quickly and easily retractable to allow normal aircraft entry and exit. Engineering Support: The contractor shall utilize licensed professional engineers (as applicable). Structural engineers may be required to evaluate the load capacity of the existing metal sunshade structures and design appropriate attachment methods. The contractor is responsible for all design, material procurement, fabrication, installation, testing, and any structural modifications required for a complete and functional system. 4. Capabilities Package Requirements All interested parties (large and small businesses) are encouraged to submit a capabilities package limited to 10 pages total. The package must include, at a minimum: a. Company name, CAGE code, UEI number, business size status (including small business size standard under NAICS 238990), and socioeconomic category (if applicable). b. Relevant past performance on similar projects (large-scale netting, screening, protective systems, or specialized fabric installations on metal structures, preferably aviation-related). c. Technical approach or conceptual design solution addressing the material, performance, wind-load, retractability, and engineering requirements. d. Experience with structural engineering analysis and load calculations on existing metal structures. e. Description of any innovative or unique C-UAS netting solutions your company has developed or installed. f. Rough Order of Magnitude (ROM) pricing and estimated period of performance (optional but highly desired). g. Any other information demonstrating your company’s ability to successfully perform this requirement. Small businesses are especially encouraged to respond and clearly identify their business size status. 5. Submission Instructions Email your capabilities package to: matthew.lahr.3@us.af.mil Subject Line: “C-UAS Sunshade Netting Sources Sought – [Company Name]” Deadline: No later than 13 November 2026, 4:00 PM Local Time 6. Disclaimer This Sources Sought notice is for information and planning purposes only. Responses will be used to assess industry interest and capability, and specifically to determine whether a small business set-aside is feasible. The Government is under no obligation to issue a solicitation or award a contract as a result of this notice. The Government will not pay for any information submitted in response to this notice. | - | Market Research | 11/13/2027 |
Additional Details
Solicitation Number
FA283519RA009
Archive Date
May 8, 2019