B730 Renovate Convert Comm to SAPR
Awarded on September 10, 2026. Award Notice posted by DEPT OF DEFENSE (DEPT OF THE AIR FORCE) on September 9, 2026. Solicitation FA302226C0017.
NAICS 236220 (Commercial and Institutional Building Construction). Set-aside: Small Business Set Aside - Total. Place of performance: Columbus, Mississippi. The description is published on SAM.gov: Full description on SAM.gov.
Description
Overview
Award Overview
Award Number
FA302226C0017
Award Amount (SAM.gov award notice)
$376.4K
Award Date
Sep 10, 2026
Awardee
Awardee UEI
MVZ5BK3UME86
Awardee CAGE Code
9N5R6
Original Solicitation
Notice ID: a97ef1dfd74645a89f738aba54a6af0f
Posted Date: Sep 9, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
FA302226C0017- Awarded
This opportunity has been awarded.
- AwardedCurrentSep 9, 2026
B730 Renovate Convert Comm to SAPR
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Design/build services necessary to renovate B1049 on Kirtland AFB. Primary objective of constructing a new enclosed stoage space of 25x25ft featuring a mezzanine above. | Awarded | 236220 | Total Small Business Set-Aside | 10/01/2026 | Open | 0, NM | |
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 06 July 2026 Description of update: Amendment FA813726R00250005 has been officially added to the Attachments/Links section of this solicitation. The primary purpose of this amendment is to clarify, verify, and update the Contract Line Item Number (CLIN) titles. Accordingly, the proposal submission deadline has been extended to Friday, July 10, 2026. All interested offerors are instructed to thoroughly review the newly uploaded solicitation document and submit updated pricing for both revised CLINs by this deadline Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 23 June 2026 Description of update: WWYK160073 Repair Fire Riser has been added to the Attachments/Links in reference to the Revised Drawings 06.22.2026; specifically the Sheet SD101 (Keynote #3) and Sheet S101 (Keynote #4) for the overall dimensions and as-built location. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 June 2026 Description of update: Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 12 June 2026 Description of update: Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section. Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 08 June 2026 Description of update: The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 03 June 2026 Description of update: Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 02 June 2026 Description of update: The IFC Final Specifications Information have been uploaded and are now available in the Attachments section. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 28 May 2026 Description of update: This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section. The proposal due date remains unchanged: 06/12/2026. Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 May 2026 Description of update: WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 18 May 2026 Description of update: WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments. The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 14 May 2026 Description of update: All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST. The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0025 Project Title: WWYK200051 Replace Switchgear, Bldg 1 Project Location: Tinker AFB - BUILDING 1. Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers. The estimated project value is below $25M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY. | Combined Synopsis | 236220 | Total Small Business Set-Aside | 07/06/2026 | 07/10/2026 | S Coffeyville, OK | |
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 23 June 2026 Description of update: WWYK160073 Repair Fire Riser has been added to the Attachments/Links in reference to the Revised Drawings 06.22.2026; specifically the Sheet SD101 (Keynote #3) and Sheet S101 (Keynote #4) for the overall dimensions and as-built location. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 June 2026 Description of update: Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 12 June 2026 Description of update: Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section. Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 08 June 2026 Description of update: The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 03 June 2026 Description of update: Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 02 June 2026 Description of update: The IFC Final Specifications Information have been uploaded and are now available in the Attachments section. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 28 May 2026 Description of update: This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section. The proposal due date remains unchanged: 06/12/2026. Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 May 2026 Description of update: WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 18 May 2026 Description of update: WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments. The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 14 May 2026 Description of update: All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST. The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0025 Project Title: WWYK200051 Replace Switchgear, Bldg 1 Project Location: Tinker AFB - BUILDING 1. Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers. The estimated project value is below $25M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY. | Combined Synopsis | 236220 | Total Small Business Set-Aside | 06/23/2026 | 07/02/2026 | Tinker AFB, OK | |
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 June 2026 Description of update: Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 12 June 2026 Description of update: Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section. Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 08 June 2026 Description of update: The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 03 June 2026 Description of update: Project RFIs are still being researched for Government responses. Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 02 June 2026 Description of update: The IFC Final Specifications Information have been uploaded and are now available in the Attachments section. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 28 May 2026 Description of update: This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section. The proposal due date remains unchanged: 06/12/2026. Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 May 2026 Description of update: WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 18 May 2026 Description of update: WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments. The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time. Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 14 May 2026 Description of update: All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST. The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0025 Project Title: WWYK200051 Replace Switchgear, Bldg 1 Project Location: Tinker AFB - BUILDING 1. Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers. The estimated project value is below $25M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY. | Combined Synopsis | 236220 | Total Small Business Set-Aside | 06/22/2026 | 07/02/2026 | Tinker AFB, OK | |
Updated: June 17th, 2026 Solicitation Amended to extend Offer Due date from 2:00pm (CDT) June 17, 2026, to 2:00pm (CDT) June 24, 2026, Design narrative has also been attached to Section J- List of attachments. The Following Clauses have been added: 52.223-23 Sustainable Products and Services. (DEVIATION 2025-O0004), 52.240-93 Basic Safeguarding of Covered Contractor Information Systems. (Deviation 2026-O0038, 252.204-7012), 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-O0013 REVISION 1) 252.240-7997 NIST SP 800-171 DoD Assessment Requirements. (DEVIATION 2026-O0025). Updated: June 16th, 2026 Design Narrative, attachment 4 has been attached below in regards to SOW 4.0. Updated: June 12, 2026 Pre Bid RFI Anwers have been submitted below Updated: June 09 2026 As-Built Info has been attached below Updated: June 08 2026 Amendment 001 (June 08 2026) Solicitation Amended to Extend the Offer Due Date from June 08th 2026 to June 17th 2026 Only the MAC BOA Holder GCs that attended Site Visit on 20 MAY 2026 will be able to continue forward toward the award. Updated 20 MAY 2026 Initial Site Visit Sign In Sheet has been attached. RFIs due 28 MAY 2026 Proposals due 08 June 2026 Only the MAC BOA Holder GCs that attended Site Visit on 20 MAY 2026 will be able to continue forward toward the award. This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0028 Project Title: WWYK260003, REPAIR ROOF, ELECT, HVAC & RESTROOMS, B4019 Project Location: Tinker AFB - B4019 Renovation of B4019 for office use at Tinker Air Force Base (AFB) Oklahoma 73145 The estimated project value is below $25M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 3 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. Initial Site Visit is set for May 20th, 2026, 10:00 AM, At Building 4019 north side parking lot. *Only 7 attendees per Prime Contractor allowed to attend Site Visit.* You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY. | Combined Synopsis | 236220 | Total Small Business Set-Aside | 06/17/2026 | 06/24/2026 | S Coffeyville, OK |
Additional Details
Solicitation Number
FA302226C0017
Archive Date
Sep 25, 2026
Office Address
COLUMBUS, MS, 39710-0001