Amendment 03: Replace Underground Storage Tank (UST) at Launch Facility (LF) D-02 (Banner County, NE)
Archived on July 8, 2026. Combined Synopsis/Solicitation posted by DEPT OF DEFENSE (DEPT OF THE AIR FORCE) on June 12, 2026. Solicitation FA461326R0002.
NAICS 236220 (Commercial and Institutional Building Construction). Set-aside: Women-Owned Small Business. Place of performance: Kimball, Nebraska. Original response deadline: . Full description on SAM.gov.
Description
This is a Combined Synopsis/Solicitation for simplified acquisition of a commercial construction requirement. This announcement constitutes the only solicitation/notice, responses/proposals are being requested, and further written solicitation will not be issued. This solicitation will be solicited as a 100% Woman Owned Small Business Set-Aside (WOSB) on SAM.gov. SBA certification or authorized third party certification as a WOSB is required as proof. The 90th Contracting Squadron is issuing this requirement under FAR Part 12 Acquisition of Commercial Products and Commercial Services, and FAR Part 36 Construction and Architect and Engineer Contracts. The Government intends to award a Firm Fixed-Price contract. The solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2026-01 published 13 March 2026, and Defense Federal Acquisition Regulation Supplement (DFARS) published 1 Feb 2026. Revolutionary FAR Overhaul is constantly changing, reference https://acquisition.gov/far-overhaul for most up to date information.
Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation. It shall demonstrate the ability to provide the required services in accordance with the Statement of Work (SOW).
1. Refer to Attachment 1 Statement of Work (SOW) REV 2 dated 12 June 2026 to the above project to include all contract materials and workmanship to be supplied and performed in accordance with existing contract standards, codes, practices and specifications. Refer to Attachment 3 AF Form 66 for submittals.
2. Company shall be registered in SAM.gov and fit the small business size standard of the solicited NAICS. Awardee shall be registered in SAM, no active exclusions, no Termination for Causes in the past six months and acceptable supplier risk profile in SPRS module. A score in the NIST SP 800-171 (if below 110 a plan of improvement is required with proposal) or Level 2 in CMMC of SPRS is required to obtain the Attachment 2 CUI Drawings. Please fill out Attachment 2 MFR CUI Control & Receipt to have your assessment score checked and if compliant, obtain the necessary CUI Map Layout to fully understand the scope of the project. See Attachments 2a and 2b for assistance with the NIST SP 800-171 process.
3. The site visit has occurred.
4. Reference Attachment 7 Post SV Q and A Part 1 dated 1 Jun 2026 and Attachment 8 Post SV Q and A Part 2 dated 12 June 2026.
5. The Davis Bacon Act Wage Determination applies, classification for this project is "HEAVY", refer to Attachment 5 Wage Determination for NE20260044 published 18 May 2026.
6. A Bid Guarantee is required, please submit Attachment 6 SF 24 Bid Bond Form, along with your proposal. The amount of bid guarantee shall be 20% or $2M, whichever is less.
7. The magnitude for this requirement is between $500,000 and $1,000,000. If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $736.25 for each calendar day of delay until the work is completed or accepted in accordance with FAR 52.211-12 Liquidated Damages-Construction. Bonding: The contractor shall provide bonding IAW FAR 28.102 Performance and Payment Bonds and Alternative Payment Protections for Construction Contracts.
8. This solicitation, along with Attachment 4 Cost Estimate Breakdown, is also to be submitted with the proposal. Highlight breakdown of materials and labors per each division applicable.
9. Submit proposal to this RFP no later than 11:00 am MT on Tuesday, 23 June 2026 by emailing proposals to megan.evans.3@us.af.mil and liezel.mcintyre@us.af.mil. Solicitation responses shall be sent via electronic means only (emailed only; mailed, hand-carried or faxed proposal shall not be accepted). Offers shall have a valid date of 90 calendar days from day of proposal receipt. Late offers shall not be accepted once solicitation has ended.
10. Your proposal shall include acknowledgement/signature of page 1 of the solicitation and corresponding amendments. Include WOSB Certification (signed by SBA or authorized third party), and if NIST SP Score is less than 110, include a plan of action to attain 110 basic assessment score, as part of your proposal.
Amend 01: The purpose of this amendment is to:
1. Offer Site Visit on Thursday, 28 May 2026 at 9:00 am MST. Meet at Gat 2 Parking Lot, off of Missile Dr., outside of F.E. Warren AFB, WY to caravan to the site. Personnel wishing to attend will need to provide their Driver's License image (front side) to be put on an Entry Authorization List (EAL) as the site to be visited is secure. Please submit the images of the Drivers Licenses of those wishing to attend to megan.evans.3@us.af.mil by 3:00 pm MST, Wednesday, 22 April 2026. If a DoD SAFE Link is preferred to submit imaging, please reach out to megan.evans.3@us.af.mil to obtain that link. Those who do not submit a Driver's License image by the deadline will not be able to attend the Site Visit and will be turned away.
2. Questions are due Friday, 29 May 2026 at 11:00 am MST.
3. Proposals are due Wednesday, 10 June 2026 at 11:00 am MST.
The purpose of this Amend 02 is to:
1. Provide Post Site Visit Q&A in Attachment 7.
2. Provide Revised Atch 1 Statement of Work dated 1 June 2026.
3. Provide Updated Atch 5 Wage Determination dated 18 May 2026.
4. Update Clause List.
5. Offer a second round of questions to be submitted by 11:00 am MT, Tuesday, 9 June 2026.
6. Extend proposal deadline to 11:00 am MT, Tuesday, 23 June 2026.
The purpose of this amendment is to:
1. Provide Attachment 1 Statement of Work REV 2 dated 12 June 2026
2. Rename Attachment 7 Post SV Q and A Part 1 - 1 Jun 2026
3. Provide Attachment 8 Post SV Q and A Part 2 - 12 Jun 2026
3. Request proposals be valid for 90 calendar days.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 10 of 22 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 210.61 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 738.78 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 829.35 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 206.87 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 260.09 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 791.5 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 18.96 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 703.42 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 552.48 KB | |||
| Combined Synopsis/Solicitation | DEPT OF THE AIR FORCE | Jun 12, 2026 | 558.4 KB |
Showing 1 to 10 of 22 results
Lifecycle
FA461326R0002- Combined Synopsis
- 6×Combined SynopsisCurrentApr 14, 2026
Amendment 03: Replace Underground Storage Tank (UST) at Launch Facility (LF) D-02 (Banner County, NE)
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
This project includes the replacement of HVAC components which have reached end of life, including the main condenser, air handler, and boiler units, and their associated controls. The project will centralize three separate HVAC systems in the building into one central, hydronic system. Fan coil units serving two areas of the building will be replaced to operate from a four-pipe system supplied by the new chiller. Some electrical upgrades are required to support the new system, and LED lighting will be installed to assist with the facility heat load. All work shall be completed in full accordance with the project specifications and drawings. | Solicitation | 236220 | Women-Owned Small Business Program Set-Aside | 05/20/2026 | 07/10/2026 | - | |
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 01 - 15 October 2026 1) The site visit for this requirement was conducted on 15 October 2026 2) RFI's are due 22 October 2026 @ 1400 (2:00 pm) CST 3) Send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil 4) The site visit sign in sheet has been posted in the attachments THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In you RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Thursday, 15 October, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil" and CC Tamra Torres at "tamra.torres@us.af.mil". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY | Solicitation | 236220 | Women-Owned Small Business Program Set-Aside | 10/15/2026 | 11/02/2026 | 0, OK | |
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In you RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Thursday, 15 October, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil" and CC Tamra Torres at "tamra.torres@us.af.mil". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY | Solicitation | 236220 | Women-Owned Small Business Program Set-Aside | 10/05/2026 | 11/02/2026 | 0, OK | |
Update 04- August 21, 2026 1. RFP due date 31 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND CO sharla.flowers_brandon.1@us.af.mil. 2. Solicitation Amendment attached as: Solicitation Amendment FA813726R00440002 SF 30 Update 03- August 19, 2026 1. RFPs due 31 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND CO sharla.flowers_brandon.1@us.af.mil. Update 02- August 18, 2026 1. RFIs are attached as: RFI Response 8-18 2. PWS attached as: PWS_Foyer Modernization 3. RFPs due 29 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil. Update 01- August 10, 2026 1. Site visit was held and concluded. Sign In Sheet attached as Sign In Sheet 8-10 2. RFI's are due Friday August 14, 2026 at 2PM CST email dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil. This posting is for Tinker AFB – WOSB construction contractors with NAICS 236220. Project Solicitation Number: FA813726R0044 Project Title: 19725785-Modernize Foyer, B3001G, Room 127 Project Location: Tinker Air Force Base 19725785-Modernize Foyer, B3001G, Room 127- This project requires some demolition and modernization of the south building foyer. The existing entrance is outdated and does not reflect the professional and executive standard required for the facility. The purpose of this renovation is to modernize the space by introducing high-end finishes, improving energy efficiency with new lighting and controls. The project involves the selective removal of all designated existing finishes and fixtures, followed by a full architectural, mechanical, and electrical restoration. The final product will be a safe, durable, and fully operational entrance that provides an executive-level appearance and adheres strictly to all applicable Tinker AFB and Department of War (DoW) standards. For project specific documents, please email dorothy.inoa@us.af.mil for access. Specific documents cannot be posted on SAM.gov. All documents are NOT CUI. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are dorothy.inoa@us.af.mil and sharla.flowers_brandon.1@us.af.mil. Your RSVP email must be received by 2:00pm CST on 3 Aug 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. The site visit will be held on 5 Aug 2026. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. You must attend the Initial Site Visit for the project to be considered eligible to propose. | Solicitation | 236220 | Women-Owned Small Business Program Set-Aside | 08/21/2026 | 08/31/2026 | 0, OK | |
UPDATE 20 AUG 2026 Soliciation Amenmendment added with the government RFI response. Proposal due date: 1 Sep 2026 NLT 2:00PM CST. UPDATE 10 AUG 2026 The site visit sign in sheet has been uploaded. The RFI due date is now 14 August 2026 NLT 2:00PM CST. Please send all RFIs to austin.elm@us.af.mil. This posting is for Tinker AFB – WOSB construction contractors with NAICS 236220. Project Solicitation Number: FA813726R0045 Project Title: 17829397-Decommission & Demo CRAC Units at B3001, Annex G, Tinker AFB Project Location: Tinker Air Force Base 17829397-Decommission & Demo CRAC Units at B3001, Annex G, Tinker AFB- This project is required to safely decommission and remove two (2) obsolete Computer Room Air Conditioning (CRAC) units from a data center facility. The removal of this equipment necessitates the architectural, mechanical, electrical, and structural restoration of the floor, wall, and ceiling systems to return the space to a safe, clean, and fully operational condition. This work ensures the continued integrity, safety, and professional appearance of a critical mission support facility at Tinker AFB. For project specific documents, please email austin.elm@us.af.mil for access. Specific documents cannot be posted on SAM.gov. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are austin.elm@us.af.mil and sharla.flowers_brandon.1@us.af.mil. Your RSVP email must be received by 2:00pm CST on 3 Aug 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. The site visit will be held on 5 Aug 2026. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. You must attend the Initial Site Visit for the project to be considered eligible to propose. | Solicitation | 236220 | Women-Owned Small Business Program Set-Aside | 08/20/2026 | 09/01/2026 | 0, OK |
Additional Details
Solicitation Number
FA461326R0002
Archive Date
Jul 8, 2026
Office Address
FE WARREN AFB, WY, 82005-2860