Notice ID: efc238d4771a49e68c3f148d894e43faSolicitationArchived
Uninterruptable Power Supply (UPS)
Archived on May 20, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM GMT+3
- Posted
- April 28, 2025
- Notice type
- Solicitation
- NAICS
- 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA5702 379 ECONS
- Last updated
- Nov 15, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA570225R0002
- Notice ID
- efc238d4771a49e68c3f148d894e43fa
Description
* Note please see the following attachments for this admendment: Consolidated Solicitation Questions for UPS, FA5702-19-C-0022 Construct 763 ERS IC As Build - Attach G14462.00.32 OL15 BL14.1 Facility Installation Document Rev A 379 ECONS is seeking proposals from qualified contractors for the design, procurement, installation, testing, and commissioning of Uninterruptible Power Supply (UPS) systems at Buildings B5506 and B5507, Al Udeid Air Base, Qatar. This project will provide reliable power protection to critical equipment within these facilities. Project Title: Uninterruptible Power Supply (UPS) Installation Project Location: Al Udeid Air Base, Qatar Magnitude of Construction: Between $250,000 and $500,000 Scope of Work: The selected contractor will be responsible for all aspects of the UPS system implementation, including: Design: Developing a detailed UPS system design, including load calculations, equipment specifications, and compliance documentation. Procurement: Procuring all necessary UPS system components (UPS units, battery banks, bypass systems, transformers, power distribution equipment, cabling, and conduit). Installation: Installing the UPS systems in accordance with industry standards and regulations. Testing and Commissioning: Conducting comprehensive testing to ensure system functionality and performance. Documentation: Providing complete as-built drawings, test reports, operation and maintenance manuals, and warranty information. Key Requirements: Offerors must have experience designing and installing UPS systems of similar size and complexity. All proposed equipment must meet specified technical requirements and be from approved manufacturers. All technicians and electricians must be factory-certified and possess required security clearances. The project is designated as mission-essential, requiring compliance with DODI 3020.37. Information Requested: Interested parties are strongly encouraged to review the attached Solicitation documents, including the Statement of Work (SOW), and submit responses accordingly. The solicitation package contains detailed information on the technical requirements, submission instructions, evaluation criteria, and terms and conditions. Disclaimer: This solicitation is not authorization to begin performance, and in no way obligates the Government for any costs incurred by the offeror associated with developing a proposal. The Government reserves the right not to award an order in response to this solicitation. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
Files (8)
- Download
FA5702-19-C-0022 Construct 763 ERS IC As Build - Attach.pdf
15 MBAdded in Solicitation version 4Posted - Download
Consolidated Solicitation Questions for UPS.pdf
91 KBAdded in Solicitation version 4Posted - Download
B5507. 58 -FA5702-19-C-0022 Construct 763 ERS IC - As Build - Attach (1).pdf
15 MBAdded in Solicitation version 4Posted - Download
Solicitation - FA570225R0002.pdf
1.6 MBAdded in Solicitation version 1Posted - Download
Attachment 1 B5507 Electrical Requirements.pdf
711 KBAdded in Solicitation version 1Posted - Download
Attachment 2 Functional Performance Test Example.pdf
239 KBAdded in Solicitation version 1Posted - Download
Attachment 3- Floor Plans.pptx
379 KBAdded in Solicitation version 1Posted - Download
STATEMENT OF WORK.pdf
122 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Uninterruptable Power Supply (UPS)
- 2Version 2SolicitationArchived
Uninterruptable Power Supply (UPS)
- 4Version 4SolicitationArchivedCurrent
Uninterruptable Power Supply (UPS)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
FA570225R0002
Archive Date
May 20, 2025
Place of Performance Country
QAT
Office Address
APO, AE, 09309-0000