Notice ID: e1b1b53e9ff247c18ba902fd6503ca76Solicitation

TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

Responses closed . Full description on SAM.gov.

Description

Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award. Updated 07JJuly 2026 Attached Updated Amendment 9 CLIN Description Revised proposals are due 31 July 2026 with proposal prices valid to 31 October 2026 Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award. Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award. Updated 25 June 2026 Attached Amendment 8. Revised proposals are due 31 July 2026 with proposal prices valid to 31 October 2026 Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award. Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award. Updated 24 June 2026 We were just informed by our funding office that funding for this project will not become available until 01 October 2026. With that said, and the latest project request for proposal prices to be valid to 30 June 2026, we are now going to once again reopen the solicitation with another amendment to all contractors that have provided proposals to allow revised proposals with prices valid till 31 October 2026. Revised proposals are due 31 July 2026 with proposal prices valid to 31 October 2026 Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 5 November 2025. Government Response to RFI 25A rebuttal has been attached. Proposal due dates are still 14 November 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 24 October 2025. Still awaiting Government Response to RFI rebuttal received 03 October. Proposal due dates have been extended from 27 October 2025 to 14 November 2025. Solicitation Amendment with the proposal due date extension has been attached. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 07 October 2025 Still awaiting Government Response to RFI rebuttal received 03 October. Proposal due dates have been extended from 10 October 2025 to 27 October 2025. Solicitation Amendment with the proposal due date extension has been attached. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 3 October 2025 RFI 25/25A with the Government Response have been posted. Proposal due dates are still 10 October 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 25 September 2025 Government response to RFIs 23, 24 & 25 have been posted with all associated attachments. Proposal due dates are still 10 October 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 18 September 2025 Proposal due date extended from 19 September 2025 to 10 October 2025. Still awaiting additional RFI Government Responses and will post once received or will extend proposal due date if needed. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 17 September 2025 RFI 26 has the Government Response and the attachments have been posted. We are currently still awaiting Government Responses for some addtional RFIs that were received. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 16 September 2025 Solicitation Amendment with the extension of proposal dates is attached. Proposal due dates are extended from 19 September 2025 to 10 October 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 28 August 2025 Current solicitation proposal due date is suspeneded and offerors will not be required to submit a proposal by 02 September 2025. We are currently still awaiting Government Responses for some addtional RFIs that were received. A proposal due date will be sent out along with a Solicitation Amendment and with the additional RFI Government Responses on a post herein. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 14 August 2025 Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 14 August 2025 On the attachment, Solicitation Amendment FA813725R00350004, the cover page states, "The purpose of this amendment is to extend proposal due dates from 15 August 2025 to 01 September 2025". This is incorrect, in the actual solicitation amendment, proposal due dates have been moved from 15 August 2025 to 02 September 2025. Proposal due dates are 02 September 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 13 August 2025 Revised Drawings, Submittal Register, and Deisgn Analysis in response to RFI #22 have been attached. Solicitation Amendment with the extension of proposal dates is attached. Proposal due dates are extended from 15 August 2025 to 02 September 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 7 August, 2025. The following is the DOR response to RFI #7: "The LED Text Sign needs to meet both UFC requirements and Tinker AFB Standards and have a second line that can scroll message from left to right. The proposed text sign attached to this RFI will not meet the Tinker AFB Standards. The LED Text Sign is not required to be Monaco, but will need to meet both UFC and Tinker AFB Standards. If the LED Text Sign installed does not meet the required classification, the enclosure for the LED Text Sign will need to be listed or approved for installation within a Class 1/Division 1 area. The proposed enclosure does not meet Class 1/Division 1 and the use of a purging/pressurization system to achieve the classification is not approved. The installation is concerned about using any enclosure that would drive additional maintenance requirements." Proposal due dates are still 15 August, 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 06 August, 2025 Solicitation Amendment with the extension of proposal dates is attached. Proposal due dates are extended from 08 August, 2025 to 15 August, 2025 Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 30 July, 2025 Solicitation Amendment with the extension of proposal dates is attached. Proposal due dates are extended from 31 July, 2025 to 08 August, 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 21 July 2025 RFI Responses and 8 new attachments are hereby provided. Proposals are still due by 31 July, 2025 at 1200 PM CST. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 15 July 2025 Solicitation Amendment with the extension of proposal dates is attached. Proposal due dates are extended from 17 July, 2025 to 31 July, 2025. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 15 July 2025 A solicitation amendment will be posted shortly that will extend the proposal due date while we are awaiting for RFI Responses. Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award. Updated 23 June 2025 The Solicitation, Site Visit Sign In Sheet and all of the Specs Documents have been attached. Proposals are still due 17 July, 2025. This posting is for Tinker AFB - MAC BOA Holders ONLY. Updated 13 June 2025. The initial site visit held on 12 June 2025 was not conducted. ***** Inititial Site Visit is Rescheduled for 23 June 2025 starting at 9:30 through 10:30, meet at main entrance for B2280. ***** You must attend the Initial Site Visit for the project to be considered eligible to propose. Even if you sent an RSVP for the first initial site visit, request that you send another RSVP and EAL if required, by NOON on 18 June 2025 so that we will know who will be in attendance. You must attend the Initial Site Visit for the project to be considered eligible to propose. An RFP amendment will be sent out after the initial site visit to address a revised proposal due date. This posting is for Tinker AFB - MAC BOA Holders ONLY. Updated June 11, 2025. Corrected Proposal Due Dates from June 27, 2025 to July 17, 2025. This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813725R0035 Project Title: WWYK190068 – REPAIR FIRE SUPPRESSION SYSTEM, B2280 Project Location: Tinker AFB - B2280 Repair the fire suppression system at project location within B2280 at Tinker Air Force Base (AFB) Oklahoma 73145 Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated, and the Initial Site Visit is set for Thursday, June 12th at 10:30 A.M. CST on Tinker AFB, B2280. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:FA8137 AFSC PZIOC
Posted:July 6, 2026
NAICS:236220: Commercial and Institutional Building Construction
Last Updated:Oct 23, 2026
First published:
Last updated on SAM.gov:
PSC:Z2QA: REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Set-Aside:Small Business Set Aside - Total
Type:Solicitation
Place of Performance:Tinker AFB, Oklahoma, 73145

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (96)

  • Solicitation Amendment FA813725R00350009 SF 30.pdf

    388 KBAdded in Solicitation version 30Posted
    Download
  • Solicitation Amendment FA813725R00350008 SF 30.pdf

    1.6 MBAdded in Solicitation version 28Posted
    Download
  • 190068_GOVT RESPONSE TO RFI 25A AND REDATED RESPONSE COR.pdf

    191 KBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350007 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350006 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf

    168 KBAdded in Solicitation version 26Posted
    Download
  • WWYK190068_RFI_23-24-25 SEP24.pdf

    112 KBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350005 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • Capsol LED Text Displays - Capsol.pdf

    1.5 MBAdded in Solicitation version 26Posted
    Download
  • Capsol Mini LED Text Displays - Capsol.pdf

    1.5 MBAdded in Solicitation version 26Posted
    Download
  • CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf

    168 KBAdded in Solicitation version 26Posted
    Download
  • CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf

    73 KBAdded in Solicitation version 26Posted
    Download
  • RFI - Light Fixtures in Joist Ceiling RFI 26 COR.pdf

    249 KBAdded in Solicitation version 26Posted
    Download
  • RFI 26 zl1d.pdf_safe.pdf

    881 KBAdded in Solicitation version 26Posted
    Download
  • RFI 26 WWYK190068_Rev_1_26 51 00.pdf

    50 KBAdded in Solicitation version 26Posted
    Download
  • RFI 26 Fixture with Joist.pdf

    57 KBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350004 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • 190068_Attch04_Revised_Design_Analysis.pdf

    22 MBAdded in Solicitation version 26Posted
    Download
  • 190068_Attch02_Revised_Submittal_Register.pdf

    85 KBAdded in Solicitation version 26Posted
    Download
  • 190068_Attch01_DRWG.pdf

    14 MBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350003 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350002 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • 190068_PreBid RFI GOVT RESPONSE.pdf

    215 KBAdded in Solicitation version 26Posted
    Download
  • 000111_F1.pdf

    58 KBAdded in Solicitation version 26Posted
    Download
  • 190068_IFC_Design Analysis_Final.pdf

    21 MBAdded in Solicitation version 26Posted
    Download
  • FP from DACA63-76-C-0111.pdf

    2.5 MBAdded in Solicitation version 26Posted
    Download
  • 190068_TAFB_IFC_FINAL_SPECIFICATIONS.pdf

    1.1 MBAdded in Solicitation version 26Posted
    Download
  • fire prot-01.pdf

    725 KBAdded in Solicitation version 26Posted
    Download
  • UFGS 28 31 76.pdf_safe.pdf

    227 KBAdded in Solicitation version 26Posted
    Download
  • 190068_DD100_Appendix A.pdf

    135 KBAdded in Solicitation version 26Posted
    Download
  • 190068_DD100_Appendix B.pdf

    126 KBAdded in Solicitation version 26Posted
    Download
  • Solicitation Amendment FA813725R00350001 SF 30.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • WWYK190068 2nd SiteVisit Signin 23JUN25.pdf

    178 KBAdded in Solicitation version 26Posted
    Download
  • Solicitation - FA813725R0035 for WWYK190068.pdf

    1.7 MBAdded in Solicitation version 26Posted
    Download
  • EMS General Awareness Training for Contractors Aug 2018 PDF.pdf

    2.3 MBAdded in Solicitation version 26Posted
    Download
  • 00 72 00.pdf

    5.3 MBAdded in Solicitation version 26Posted
    Download
  • 00 71 00.pdf

    1.5 MBAdded in Solicitation version 26Posted
    Download
  • 01 78 00.pdf

    1.4 MBAdded in Solicitation version 26Posted
    Download
  • 01 42 00.pdf

    10 KBAdded in Solicitation version 26Posted
    Download
  • 01 33 00.pdf

    856 KBAdded in Solicitation version 26Posted
    Download
  • 00 70 00.pdf

    897 KBAdded in Solicitation version 26Posted
    Download
  • 01 50 00.pdf

    300 KBAdded in Solicitation version 26Posted
    Download
  • Tinker General Requirements Specifications_Nov 2022_Change Log.pdf

    94 KBAdded in Solicitation version 26Posted
    Download
  • 01 45 00.00 10.pdf

    36 KBAdded in Solicitation version 26Posted
    Download
  • 01 33 16.00 10.pdf

    86 KBAdded in Solicitation version 26Posted
    Download
  • 00 80 05.pdf

    10 KBAdded in Solicitation version 26Posted
    Download
  • 01 32 16.00 20.pdf

    28 KBAdded in Solicitation version 26Posted
    Download
  • 01 78 23.pdf

    34 KBAdded in Solicitation version 26Posted
    Download
  • 000_TABLE OF CONTENTS.pdf

    70 KBAdded in Solicitation version 26Posted
    Download
  • 00 80 00.pdf

    8.2 KBAdded in Solicitation version 26Posted
    Download
  • UMRL.pdf

    686 KBAdded in Solicitation version 26Posted
    Download
  • ERDCITL_TR12-1_r2.pdf

    3.4 MBAdded in Solicitation version 26Posted
    Download
  • ERDCITL_TR12-6_r6.pdf

    1.5 MBAdded in Solicitation version 26Posted
    Download
  • ufc_3_260_01_2019_c1.pdf

    70 MBAdded in Solicitation version 26Posted
    Download
  • ufc_3_535_01_2017_c4.pdf

    20 MBAdded in Solicitation version 26Posted
    Download
  • tinkerafb_INRMP.pdf

    16 MBAdded in Solicitation version 26Posted
    Download
  • EM_385-1-1.pdf

    10 MBAdded in Solicitation version 26Posted
    Download
  • ufc_3_600_01_2016_c6.pdf

    9.9 MBAdded in Solicitation version 26Posted
    Download
  • tinkerafb_INRMP_App G.pdf

    4.6 MBAdded in Solicitation version 26Posted
    Download
  • dafi21-101_afmcsup_afmcgm2023-01.pdf

    2.8 MBAdded in Solicitation version 26Posted
    Download
  • dafman91-203.pdf

    2.8 MBAdded in Solicitation version 26Posted
    Download
  • ufc_3_260_04_2018.pdf

    2.3 MBAdded in Solicitation version 26Posted
    Download
  • afi91-202_afmcsup.pdf

    2.3 MBAdded in Solicitation version 26Posted
    Download
  • ufc_3_601_02_2021.pdf

    2.1 MBAdded in Solicitation version 26Posted
    Download
  • dafi91-202.pdf

    1.9 MBAdded in Solicitation version 26Posted
    Download
  • tinkerafbi13-204.pdf

    1.8 MBAdded in Solicitation version 26Posted
    Download
  • afman32-7003.pdf

    1.3 MBAdded in Solicitation version 26Posted
    Download
  • dafi13-213.pdf

    1.2 MBAdded in Solicitation version 26Posted
    Download
  • afman40-201.pdf

    1.1 MBAdded in Solicitation version 26Posted
    Download
  • tinkerafb_HWMP.pdf

    1016 KBAdded in Solicitation version 26Posted
    Download
  • afman48-148.pdf

    1.0 MBAdded in Solicitation version 26Posted
    Download
  • dafi13-213_tinkerafbsup.pdf

    769 KBAdded in Solicitation version 26Posted
    Download
  • TAFB_SOP_outages_v2.pdf

    473 KBAdded in Solicitation version 26Posted
    Download
  • afman91-203_oc-alcsup.pdf

    389 KBAdded in Solicitation version 26Posted
    Download
  • afi48-104.pdf

    317 KBAdded in Solicitation version 26Posted
    Download
  • tinkerafb_INRMP_App E.pdf

    225 KBAdded in Solicitation version 26Posted
    Download
  • tinkerafbi21-100.pdf

    213 KBAdded in Solicitation version 26Posted
    Download
  • dodio-2000.16v1_afi10-245-o.pdf

    37 KBAdded in Solicitation version 26Posted
    Download
  • 1354 Checklist.pdf

    82 KBAdded in Solicitation version 26Posted
    Download
  • VEAL Template.pdf

    106 KBAdded in Solicitation version 26Posted
    Download
  • Staging Request Form.pdf

    92 KBAdded in Solicitation version 26Posted
    Download
  • Recovered Materials Determination Form.pdf

    129 KBAdded in Solicitation version 26Posted
    Download
  • EAL Template.pdf

    142 KBAdded in Solicitation version 26Posted
    Download
  • 017800_Attch1_DD1354.pdf

    93 KBAdded in Solicitation version 26Posted
    Download
  • 013300_Attch1_TAFBF3000.pdf

    234 KBAdded in Solicitation version 26Posted
    Download
  • 007200_Attch14_Information for New Boilers.pdf

    144 KBAdded in Solicitation version 26Posted
    Download
  • 007200_Attch9_EMS Awareness Training.pdf

    86 KBAdded in Solicitation version 26Posted
    Download
  • 007200_Attch7b_Monthly Hazardous Usage Report.pdf

    123 KBAdded in Solicitation version 26Posted
    Download
  • 007200_Attch7a_AF3952.pdf

    40 KBAdded in Solicitation version 26Posted
    Download
  • 007100_Attch1_Airfield Construction Waiver.pdf

    192 KBAdded in Solicitation version 26Posted
    Download
  • 007000_Attch1_TAFB Outage Request Form.pdf

    186 KBAdded in Solicitation version 26Posted
    Download
  • WWYK190068 Canceled SiteVisit Signin 12JUN25.pdf

    218 KBAdded in Solicitation version 26Posted
    Download
  • 190068_ATT10_Submittal_Register.pdf

    176 KBAdded in Solicitation version 26Posted
    Download
  • 190068_ATT11_Revised_Drawings.pdf

    13 MBAdded in Solicitation version 26Posted
    Download
  • 190068_ATT9_SOW.pdf

    267 KBAdded in Solicitation version 26Posted
    Download
  • EAL List - 190068.xlsx

    62 KBAdded in Solicitation version 26Posted
    Download

Lifecycle

  1. 1
    Version 1Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 13c73ad608bf4b8c9628867a83815eb3 on SAM.gov

  2. 2
    Version 2Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 9ecec026fda94bed8cf53de7981a0fd7 on SAM.gov

  3. 3
    Version 3Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 39c6bdb347464ed7800d691ca9ae66cd on SAM.gov

  4. 4
    Version 4Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice bcbcd0e823f74dfab31375bb1c5cf3f0 on SAM.gov

  5. 5
    Version 5Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 18e9041759eb49f4b2303b0d8b11390e on SAM.gov

  6. 6
    Version 6Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 780a3e1f46a541a8bc7ba58e36086c5e on SAM.gov

  7. 7
    Version 7Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice d20b333613a04553b77d0c09da5ef78f on SAM.gov

  8. 8
    Version 8Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 11131429386440299e73f755be026f98 on SAM.gov

  9. 9
    Version 9Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice fe4c97a2720946aa86b4db04ecfa3cc5 on SAM.gov

  10. 10
    Version 10Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 29c9c684fc934b00b8092c1eb630acf4 on SAM.gov

  11. 11
    Version 11Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 416d50944f304dedb39277a71fdc35b8 on SAM.gov

  12. 12
    Version 12Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice ee9e8dc0b9d74c61a7a8562c9e6bb31c on SAM.gov

  13. 13
    Version 13Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 6a247cc7803848f98c803ba999b8713a on SAM.gov

  14. 14
    Version 14Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice aba8943dfdc24f618b27bcc9a975431d on SAM.gov

  15. 15
    Version 15Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 7d3c076fc4d045378564046d506ef380 on SAM.gov

  16. 16
    Version 16Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice addb20654b3c48bbb701008c1523e79e on SAM.gov

  17. 17
    Version 17Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice c5bafc383e2a40348a27551bafdff387 on SAM.gov

  18. 18
    Version 18Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 3a11860aa0f44a6386937c57f54a37ca on SAM.gov

  19. 19
    Version 19Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 89b32473a82c46caaeb4dd68a73ff4e5 on SAM.gov

  20. 20
    Version 20Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 2c6d3edac5ce424697fa6a755341830e on SAM.gov

  21. 21
    Version 21Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 9e4076a08d304050812f263465bcafa2 on SAM.gov

  22. 22
    Version 22Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice bd6a4394e7fa47488770712398e533d2 on SAM.gov

  23. 23
    Version 23Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 0888e70f5cba462aa7d0964ffa9763bd on SAM.gov

  24. 25
    Version 25Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 89b77201a5c446cd9be09dc5b69ecd46 on SAM.gov

  25. 26
    Version 26Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 3f01d6b5353d44e19142b642c35e6c9d on SAM.gov

  26. 27
    Version 27Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice dddf55159396404f8926fd2a969cabf4 on SAM.gov

  27. 28
    Version 28Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice 15231408f9d647ccb06b1aef3fc6a9cd on SAM.gov

  28. 29
    Version 29SolicitationCurrent

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice e1b1b53e9ff247c18ba902fd6503ca76 on SAM.gov

  29. 30
    Version 30Solicitation

    TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

    Notice fb09547ab63e465ca15c4d290359b5b3 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

FA813725R0035

Archive Date

Dec 31, 2026

Office Address

TINKER AFB, OK, 73145-9125