GovChime
Notice ID: be82bd6fdd1045c7b4651cc81ccf66a3Combined Synopsis/SolicitationArchived

Air Compressors and Maintenance Plan

Archived on August 19, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM MDT
Posted
July 22, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333912: Air and Gas Compressor Manufacturing
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE GLOBAL STRIKE COMMAND.FA9401 377 MSG PK
Place of performance
ROAD FORKS, New Mexico, 87117
PSC
4310: COMPRESSORS AND VACUUM PUMPS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA9401-26-Q-0025
Notice ID
be82bd6fdd1045c7b4651cc81ccf66a3

Description

** Please see the attachment Vendor QA Consolidation and Appendix A - List of Currently Used Equipment for the answers to all questions submitted **

**This Solicitation has been amended please see attachment FA940126Q0025 - AMENDED for complete information.**

1. Response deadline date has changed from Monday, 13 July 2026 to Tuesday, 04 August 2026 at 1400 hours (MDT)

2. We have added a site visit, which is being held on 16 July 2026 at 1300 hours (MDT).

*See PWS for complete details*
This project will consist of the procurement, removal, disposal, installation, commissioning, and maintenance of two (2) Ingersoll Rand RS37i Air Compressors, one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator, and two (2) Ingersoll Rand Xe-70M controllers. Equivalent models are accepted; however, bids on equivalent models will need to include a brochure of all the technical specifications for review. Equivalent models will need to either have an integrated desiccant dryer or separate desiccant dryer that can handle the volume of two air compressors. The Contractor will be responsible for the complete installation of two (2) Ingersoll Rand RS37i Air Compressors and one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator.

The Contractor shall procure and provide a “turnkey” solution in accordance with the manufacturer’s installation requirements and standard commercial best practices for the following equipment:


Manufacture Model # Description Quantity
Ingersoll Rand RS30-37i/RS30I TAS Fixed Speed Rotary Compressor w/ Dryer 2
Ingersoll Rand PSG-30 Polysep PSG-30 Oil Water Separator 1


Equivalent models must meet the following specifications:
Description Required Specifications Quantity
Air Compressor 2
• 120 PSI each
• 170 CPM each
• Needs to have integrated air dryer
• Must be air-cooled

Oil Water Separator 1
• 390 CPM
• 12-gal absorption module volume
• 32-120 temperature operating range 


In addition, the government requires a preventive (scheduled) and corrective (troubleshooting, repairs, and replacements) maintenance contract for all existing shop air compressor systems (See Appendixes in PWS for all currently used equipment), for the base year and four option years. The Contractor shall provide all management, labor, material, parts, equipment, transportation, certifications, and tools necessary to maintain, service, and calibrate the shop air compressors, air dryers and associated ancillary equipment.

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (6)

  • Appendix A - List of Currently Used Equipment.pdf

    150 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Vendors QA Consolidation.pdf

    54 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • FA940126Q0025 - AMENDED.pdf

    167 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Attachment 1 - PWS REDACTED.pdf

    552 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 2 - Wage Determination.pdf

    74 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • FA940126Q0025 Final.pdf

    666 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Air Compressors and Maintenance Plan

    Notice e4f75510670440dab270205c19f66cd8 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Air Compressors and Maintenance Plan

    Notice 5a74dfdfad2c4045af3585c589284ac4 on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    Air Compressors and Maintenance Plan

    Notice a78fb2054c4e44fd9599257b0236b3e8 on SAM.gov

  4. 5
    Version 5Combined Synopsis/SolicitationArchivedCurrent

    Air Compressors and Maintenance Plan

    Notice be82bd6fdd1045c7b4651cc81ccf66a3 on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

FA9401-26-Q-0025

Archive Date

Aug 19, 2026

Office Address

KIRTLAND AFB, NM, 87117-0001