Theater Rigging Control System Modernization
Archived on September 10, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM EDT
- Posted
- August 17, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 334310: Audio and Video Equipment Manufacturing
- Agency
- Library of Congress
Notice details
- Office
- CONTRACTS SERVICES
- Place of performance
- Washington, District of Columbia, 20540
- PSC
- J040: MAINT/REPAIR/REBUILD OF EQUIPMENT- ROPE, CABLE, CHAIN, AND FITTINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 030ADV26R0048
- Notice ID
- e93b0d4fdd3a40b1b45b15e98455db02
Description
The Library of Congress (Library) requires contract support to modernize the theatrical rigging control systems for the historic Coolidge Auditorium. The 485-seat venue opened in the 1920’s, designed with acoustic properties to support chamber music. The venue began to support other types of performances, in addition to other types of events. To support increased use, modernization was performed in the mid-1990’s which added motorized theatrical rigging and automation. The legacy infrastructure and system added in the 1990’s was installed by Wenger/JR Clancy, and is characterized by distributed control points, variable motor behavior, and limited system intelligence. The control unit for the system has been inoperable for over a year. The installed infrastructure reflects a rigging ecosystem in which motorized scenic elements were deployed as semi-independent subsystems with limited interoperability and with centralized control unit. At present, these subsystems can only be operated using standalone manual override stations, which are still operable for each component. This modernization effort is intended to unify these systems into a single theater rigging control environment and replace the non-working control unit. All work shall comply with historic preservation constraints, structural limitations, and restricted installation practices typical of protected performance venues.
The Contractor shall remove the current theatrical rigging control system and provide a new theatrical rigging control system for the Library’s Coolidge Auditorium.
Amendment 0001
The purpose of this amendment is to provide answers to questions. See attached amendment and Q&A document.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (7)
- Download
J-5 - 030ADV26R0048 - Responses to Offeror Questions.pdf
100 KBAdded in Solicitation version 3Posted - Download
030ADV26R0048 0001.pdf
215 KBAdded in Solicitation version 3Posted - Download
030ADV26R0048.pdf
452 KBAdded in Solicitation version 1Posted - Download
Attachment J-1 - Past Performance Questionnaire 7-9-2026 (2 Pages) - Theater Rigging.docx
44 KBAdded in Solicitation version 1Posted - Download
Attachment J-2 - 030ADV26R0048 - Deliverables Price Schedule 7-16-26 (2 Pages) - Theater Rigging.docx
21 KBAdded in Solicitation version 1Posted - Download
Attachment J-3 - Broken Control Unit Reference Image 7-29-2026 (1 Page).docx
291 KBAdded in Solicitation version 1Posted - Download
Attachment J-4 - AOC Preservation Policy and Standards 12-30-2016 (16 Pages).pdf
530 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Theater Rigging Control System Modernization
- 3Version 3SolicitationArchivedCurrent
Theater Rigging Control System Modernization
Similar Opportunities
Additional Details
Solicitation Number
030ADV26R0048
Archive Date
Sep 10, 2026
Office Address
Washington, DC, 20540