Request for Information (RFI) C-130 Cargo Winch Overhaul
Archived on May 3, 2026. Original response deadline: . Full description on SAM.gov.
Description
The Government is conducting market research to identify potential sources that possess the repair data, expertise, capabilities, and experience to meet qualification requirements to overhaul the C-130 Cargo Winch operated and maintained by United States Air Force (USAF) and United States Navy (USN). The National Stock Number (NSN) and Part Number (PN) are as follows:
Item: C-130 Cargo Winch
NSN: 1680-00-860-3934
PN: 41750-3-41BG
RMC/RMSC: R1/C
The C-130H Aircraft Cargo Winch is a heavy duty, lightweight and extremely rugged all weather aircraft cargo winch. This item provides the aircrew the ability to expeditiously load heavy cargo on and off the aircraft. Maintenance to be performed includes teardown, analysis, overhaul, testing and procurement of spare sub-components, package handling, storage, transportation, data collection, engineering support and services. The overhaul and testing of this asset must be to approved Military Specification (Mil-W-26217A) and Technical Orders (T.O.s) 35D4-2-30-l and 35D4-2-30-4; returning the assets to the Air Force in Ready-for-Issue (RFI) condition while meeting required performance thresholds. The Government has unlimited rights to these T.O.s but has incomplete build/overhaul data.
The service shall include providing obsolete parts resolution along with the necessary engineering to investigate Deficiency Reports and Material Improvement Projects (MIPs).
The Government does not own the data or the rights to the data needed to compete the overhaul of these parts. It has been determined to be uneconomical to reverse engineer the data, qualify a new source, or buy the data and/or data rights.
***MORE INFORMATION AND INSTRUCTIONS FOR SUBMISSION OF INFORMATION, INTEREST, AND QUESTIONS IS FOUND IN THE ATTACHMENT***
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 1 of 1 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | DEPT OF THE AIR FORCE | Mar 19, 2026 | 206.34 KB |
Lifecycle
FD20602700029- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentMar 19, 2026
Request for Information (RFI) C-130 Cargo Winch Overhaul
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
This solicitation is conducted under Simplified Acquisition Procedures (SAP) as a Request for Quote (RFQ) No. FA857127Q0004. This requirement is being solicited as a sole source requirement to the Original Equipment Manufacturer (OEM) MIVA Tek Global, Cage Code: 88DM2 The contractor shall provide all labor, travel & lodging expenses, parts, materials, remote diagnostics and services to perform preventive maintenance, software updates and emergency repairs to keep the MIVA DIRECT IMAGER (SN: 1903.593) in functional operating condition, bi-annually, for the 402nd Electronics Maintenance Group (EMXG) at Robins Air Force Base (AFB), Georgia. | Solicitation | 811210 | No Set-Aside | 10/07/2026 | 10/13/2026 | Warner Robins, GA | |
Amendment I: 29 September 2026 Solicitation: FA853826R0017/ Flat Panel Up Front Control (FPUFC) Repair 1. To attach updated Solicitation, that includes latest version of the PWS with internal audit required language in Para 4.5.1 2. To Provide an additional POC: Anthony Cheatham Email: anthony.cheatham.1@us.af.mil All other information remains the same. ********************************************************************************** This effort is in support of evaluation, fault isolation, inspection, testing, repair, and packaging of the Flat Panel Up Front Controller NSN 5895-01-530-1899FX, PN A05A0249-12. The FPUFC is applicable to the F-15E. This repair effort will utilize a Firm-Fixed Pricing (FFP) 5 year repair contract with 5 one-year ordering periods plus a 6 month optional order period. Repair FPUFC, NSN 5895-01-530-1899FX, P/N A05A0249-12: Ordering Period BEQ Basic 100 Ordering Period I 100 Ordering Period II 100 Ordering Period III 100 Ordering Period IV 100 6 Month Extension 50 Total Estimated Repair Value: $ Parts & Materials: Ordering Period BEQ Basic 500 Ordering Period I 0 Ordering Period II 0 Ordering Period III 0 Ordering Period IV 0 6 Month Extension 0 Total Estimated Parts & Labor Value: $ BER: Ordering Period BEQ Basic 1 Ordering Period I 1 Ordering Period II 1 Ordering Period III 1 Ordering Period IV 1 6 Month Extension 1 Total Estimated BER Value: $ NFF: Ordering Period BEQ Basic 1 Ordering Period I 1 Ordering Period II 1 Ordering Period III 1 Ordering Period IV 1 6 Month Extension 1 Total Estimated NFF Value: $ Total Estimated Contract Value: $ | Solicitation | 811210 | No Set-Aside | 09/29/2026 | 11/25/2026 | Warner Robins, GA | |
This effort is in support of evaluation, fault isolation, inspection, testing, repair, and packaging of the Flat Panel Up Front Controller NSN 5895-01-530-1899FX, PN A05A0249-12. The FPUFC is applicable to the F-15E. This repair effort will utilize a Firm-Fixed Pricing (FFP) 5 year repair contract with 5 one-year ordering periods plus a 6 month optional order period. Repair FPUFC, NSN 5895-01-530-1899FX, P/N A05A0249-12: Ordering Period BEQ Basic 100 Ordering Period I 100 Ordering Period II 100 Ordering Period III 100 Ordering Period IV 100 6 Month Extension 50 Total Estimated Repair Value: $ Parts & Materials: Ordering Period BEQ Basic 500 Ordering Period I 0 Ordering Period II 0 Ordering Period III 0 Ordering Period IV 0 6 Month Extension 0 Total Estimated Parts & Labor Value: $ BER: Ordering Period BEQ Basic 1 Ordering Period I 1 Ordering Period II 1 Ordering Period III 1 Ordering Period IV 1 6 Month Extension 1 Total Estimated BER Value: $ NFF: Ordering Period BEQ Basic 1 Ordering Period I 1 Ordering Period II 1 Ordering Period III 1 Ordering Period IV 1 6 Month Extension 1 Total Estimated NFF Value: $ Total Estimated Contract Value: $ | Solicitation | 811210 | No Set-Aside | 09/26/2026 | 11/25/2026 | Warner Robins, GA | |
Title: Pre-solicitation - depot-level overhaul effort for the C-5 Dual Powered Winch (DPW) Synopsis for this requirement is being issued by AFSC/PZAAB (FA8538). The 409th Supply Chain Management Squadron (SCMS) / GUMA anticipates a five-year, Firm Fixed Price (FFP) Indefinite Delivery Contract (IDC) for the overhaul effort for the C-5 Dual Powered Winch (DPW) National Stock Number (NSN) 1680-01-593-5680UC P/N: 200413780-20 to provide all the necessary depot-level overhaul of the C-5 DPW to a serviceable condition in accordance with the manufacturer's technical specifications. The anticipated IDC will include one (1) 12-month basic year and four (4) one-year option periods. The proposed contract action is for services for which the Government intends to solicit and negotiate using Other Than Full and Open Competition (OTF&OC) procedures in accordance with RFO Part 6.103-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The Government does not own any production level technical data or specialized test equipment in support of this requirement. As a result, Thomas Instrument, Inc., – CAGE 50LP4, is the only known source with adequate knowledge of the C-5 Dual Powered Winch (DPW) National Stock Number (NSN) 1680-01-593-5680UC P/N: 200413780-20 performance requirements and possession of the required technical data and capabilities needed to perform the overhaul services in support of this item and ensure compatibility of the equipment. The Government's required delivery schedule is 120 days after receipt of assets. The quantities shown below represent the Best Estimated Quantities for this effort. NSN: 1680-01-593-5680UC Part Number: 200413780-20 Noun: WINCH, AIRCRAFT MOUN RMC/ RMSC: R4/P Quantity: 100 EA Point of Contact: Caiveon Thomas at caiveon.thomas@us.af.mil Approximate issue date of the solicitation is 21 October 2026. Approximate response date for receipt of proposals is 21 December 2026. | Pre-Solicitation | 811210 | No Set-Aside | 09/21/2026 | 10/20/2026 | Warner Robins, GA | |
Sole source award to BAE for F-16 Transducer repair. | Awarded | 811210 | No Set-Aside | 09/29/2026 | Open | Endicott, NY |
Additional Details
Solicitation Number
FD20602700029
Archive Date
May 3, 2026
Office Address
ROBINS AFB, GA, 31098-1670