USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
Archived on August 4, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM PDT
- Posted
- July 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- No Set aside used
- NAICS
- 336611: Ship Building and Repairing
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- SFLC PROCUREMENT BRANCH 2(00085)
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 70Z08526QIBCT0048
- Notice ID
- fda1ec274c3c41ea975d7cef16a38313
Description
*********************Please downloand all attachments for complete solicitation******************************
This requirement is for CGC FIR that is homeported in Coast Guard District 17 at 300 North Fill Pier Cordova, AK 99574 and is
considered Full and Open Competition.
Place of Performance: Vendor' Facility/Pier
Contract Type: This solicitation will result in the award of Indefinite Delivery Requirement Contract (IDR)
1. An offeror's completed Price Schedule shall represent the best price in response to the solicitation.
2. Request for Drawings: The last day to request drawings regarding this solicitation is 8 AM PST on 11 May 2026. After this date,
further requests may not be accepted due to time constraints. To request drawings, contact Ou.T.Saephanh@uscg.mil and
Sandra.a.Martinez@uscg.mil. All requests should identify the solicitation number RFQ#70Z08526QIBCT0048. Some references
listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise
restricted distribution and have been deemed "limited access" and "export controlled" packages. In order to access these
documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the
Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at
https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by JCP will be able
to be granted explicit access to these packages by the USCG.
3. Site Visit Contact: Please coordinate and contact CWO Donald Ladd at Donald.N.Ladd@uscg.mil and Ou Saephanh at
Ou.t.Saephanh@uscg.mil no later than 8 AM PST on 15 May 2026.
4. Request for Clarifications: Please submit all questions using Attachment - 4 for EACH question via email only and address to
Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil no later than 8 AM PST on 18 May 2026. The subject line of all
email correspondence must state RFQ#70Z08526QIBCT0048
5. Submit quotes via email to Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil no later than 2 PM PST on 20 July
2026. The subject line of all email correspondence must state RFQ#70Z08526QIBCT0048. Quotes received after the deadline
may not be considered.
Period of Performance: 01 September 2026 – 11 November 2026
ANTICIPATED AWARD DATE: The anticipated date of award is on or about 25 August 2026.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (18)
- Download
SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480005.pdf
692 KBAdded in Combined Synopsis/Solicitation version 17Posted - Download
SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480009.pdf
719 KBAdded in Combined Synopsis/Solicitation version 15Posted - Download
AMEND 0008 FIR.docx
84 KBAdded in Combined Synopsis/Solicitation version 14Posted - Download
AMEND 0007 FIR.docx
84 KBAdded in Combined Synopsis/Solicitation version 12Posted - Download
AMEND 0006 FIR.docx
84 KBAdded in Combined Synopsis/Solicitation version 11Posted - Download
AMEND 0006 CGC FIR.docx
28 KBAdded in Combined Synopsis/Solicitation version 11Posted - Download
SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480004.pdf
690 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
Attachment 1 - Blank bid sheet CGC FIR DS FY 26.xls
69 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
J and A - Appleton_Redacted.pdf
168 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480003.pdf
690 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480002.pdf
664 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
70Z085-26-Q-IBCT-0048 (USCGC FIR WLB-213) Clarification - revised.pdf
82 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480001.pdf
664 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Attachment 2 - SPECS CGC FIR DS 26 - Revised.pdf
6.2 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
70Z08526QIBCT0048 - CGC FIR DS FY 26.pdf
200 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 4 - Request for Clarification Form.docx
24 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment 3 - Past Performance Information Form.docx
19 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Sources Sought - FIR DS FY 26.pdf
206 KBAdded in Sources Sought version 3Posted
Lifecycle
- 2Version 2Sources SoughtArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 4Version 4Combined Synopsis/SolicitationArchived
Type changed from Sources Sought to Combined Synopsis/Solicitation
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 5Version 5Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 6Version 6Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 7Version 7Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 8Version 8Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 9Version 9Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 10Version 10Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 11Version 11Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 12Version 12Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 13Version 13Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 14Version 14Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 15Version 15Combined Synopsis/SolicitationArchived
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 17Version 17Combined Synopsis/SolicitationArchivedCurrent
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
- 19Version 19Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
100% | Awarded | Open | |
Amendment 0006: Amendment provides clarification regarding contractor pier power. One 480 VAC, 400A Viking electrical plug-in will be available on the same pier as the vessel, adjacent to the contractor equipment laydown area. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0005: This amendment provides responses to offeror questions concerning Work Items D-008 and D-021. The amendment corrects the drawing reference in D-008, Paragraph 3.2.3, to CG Drawing 418A-WMSL-801-1 and clarifies the Government-furnished equipment applicable to D-021. All other terms and conditions of the solicitation remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0004: provides the Government’s responses to additional offeror questions regarding drawings and technical requirements associated with Work Items D-016, D-009, and D-008. The amendment also extends the solicitation closing date and time to October 5, 2026, at 1400 Pacific Time (PT); all other terms and conditions remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0003: provides the Government’s response to an offeror question regarding the correct compartment identification for the MPAC work under Work Item D-018. The amendment clarifies that MPAC #1 is located in the FMMR Upper Level and that paragraph 1.1 identifies the correct work locations. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0002: Adds a clarifying note regarding the Attachment 2 Specification posted in Amendment 0001 & extends the no later than due date for receipt of quotes from 22 September 2026 to 29 September 2026 at 10:00 am Pacific Time. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0001: Replaces the Attachment 1 Price Schedule as well as the Attachment 2 Specification. The Attachment 2 Specification originally posted was for a previous/different project regarding the cutter. The Attachment 2 Specification which is part of Amendment 0001 is an entirely different specification and therefore specifies no revisions on the Revisions page iii. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Coast Guard Cutter MIDGETT fiscal quater 2, fiscal year 2027 dockside repair. The period of performance is 2 February - 8 May 2027. | 97% | Combined Synopsis | 10/05/2026 |
DOCKSIDE FOR THE USCGC HAROLD MILLER IN ST PETERSBURG, FL POP 6/01/2027-7/20/2027 | 88% | Market Research | 11/04/2026 |
USCGC REEF SHARK DRYDOCK FRY26 *ALASKAN CUTTER, PLEASE READ SOURCES SOUGHT ATTACHMENT CAREFULLY* | 87% | Market Research | 11/05/2026 |
DRYDOCK REPAIRS FOR THE USCGC TERN POP 06/08/2027-09/28/2027 | 87% | Market Research | 11/04/2026 |
Additional Details
Solicitation Number
70Z08526QIBCT0048
Archive Date
Aug 4, 2026
Office Address
ALAMEDA, CA, 94501