GovChime
Notice ID: 008659c8cd2c1da894ae170a534c9e15Award NoticeAwarded

Water Infiltration Repairs, Highgate Springs LPOE

Awarded on March 6, 2012. Full description on SAM.gov.

Awarded tounder GS-01P-12-BZ-C-0008 (source: SAM.gov award notice)• $191.0K

Overview

Posted
March 6, 2012
Notice type
Award Notice
NAICS
238910: Site Preparation Contractors
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R1 ACQ MANAGEMENT DIVISION
Place of performance
482 Welcome Center Road , Highgate Springs, 05460
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Mar 6, 2012
Award amount (SAM.gov award notice)
$191.0K

Identifiers

Solicitation number
GS-01P-12-BZ-C-0008
Notice ID
008659c8cd2c1da894ae170a534c9e15
Award number (PIID)
GS-01P-12-BZ-C-0008

Description

Agency: General Services Administration Office: Public Buildings Service (PBS) Location: North Service Center (1PSA) Solicitation Number: GS-01P-12-BZ-C-0008 Water Infiltration Repairs, Highgate Springs, VT LPOE Synopsis: Subject to Availability of Funds The General Services Administration (GSA) New England Region, North Service Center Branch is issuing this Invitation for Bids (IFB) for the contractor to provide all labor, materials, equipment and supervision for the removal and reconstruction of concrete pavement, installation of drainage structures, and sump pumps. Work also includes removal of aboveground mechanical HVAC equipment and abandoning underground ductwork with flowable fill at the Highgate Springs Land Port of Entry (LPOE) in Vermont. This procurement is a 100% Small Business Set-aside. The estimated cost is between $100,000 and $250,000. The NAICS code for this service is 238910, Site Prep Contractors. The Small Business Size standard is $14 MILLION. The solicitation will be released on or about January 24, 2012, with bid due date on or about February 23, 2012. A pre-bid site visit is scheduled for January 31, 2012. Technical documents will be available through the secure website via a direct link from FEDBIZOPPS. Bidders are responsible for printing the IFB and all related documents. It is also the bidder's responsibility to monitor this site for release of the IFB, and amendments and any related information.

Full description on SAM.gov

Award Overview

Award Number

GS-01P-12-BZ-C-0008

Award Amount (SAM.gov award notice)

$191.0K

Award Date

Mar 6, 2012

Awardee

Awardee UEI

Z947J6BM41R7

Original Solicitation

Notice ID: 008659c8cd2c1da894ae170a534c9e15

Posted Date: Mar 6, 2012

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Sotheavy Khon
Contract Specialist

Secondary Contact

Donna Maffeo
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:GS-01P-12-BZ-C-0008
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 7×
    Pre-SolicitationJan 10, 2012

    Water Infiltration Repairs, Highgate Springs LPOE

    Notice ca7bcf995774ee38fb61bf864fe57abd on SAM.gov

  2. SolicitationFeb 23, 2012

    Water Infiltration Repairs, Highgate Springs LPOE

    Notice e4a57013097fc5f77ee0a8a5a7ad6cc2 on SAM.gov

  3. AwardedCurrentMar 6, 2012

    Water Infiltration Repairs, Highgate Springs LPOE

    Notice 008659c8cd2c1da894ae170a534c9e15 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.
-Combined Synopsis11/23/2026
Fermi National Accelerator Laboratory (Fermilab) is soliciting proposals for an Indefinite Delivery Indefinite Quantity (IDIQ) type Master Subcontract for Utilities Excavation and Repair Services for Fermilab located in Batavia, IL. Fermi Forward Discovery Group (FFDG) seeks to find a qualified subcontractor to perform on-call, scheduled, and emergency excavation services and utility repairs, as described in Exhibit C, Statement of Work, and the requirements of each task order. Work will be performed across the Fermilab site, which covers approximately 6,800 acres in Kane and DuPage Counties and includes approximately 375 buildings and structures. The site contains a wide variety of soil types and terrain, such as clay soils, fill, and saturated soils, in settings that include developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. Offerors should consider these conditions in their technical approach, equipment selection, and pricing. Fermilab operates 24 hours per day, 365 days per year, and the work must support uninterrupted laboratory operations. The Request for Proposal and all Exhibits are located at Sam.gov under Solicitation number 385439GMK. Questions Close on November 18, 2026 at 5:00 pm CST. All questions must be submitted in writing to ginakern@fnal.gov. The Request for Proposal (RFP) CLOSES on December 7, 2026 at 3:00 pm CST. Please email your proposals with all required documents to ginakern@fnal.gov.
-Solicitation12/07/2026
See Presolicitation Notice Attachment for full details. ---- The United States Army Corps of Engineers Europe District (CENAU) has a requirement to provide a new laydown area including concrete tent pads, gravel bed, site improvements and utility connections for developing base expeditionary airfield resources (BEAR) to beddown personnel (550 pax) using Deployable Air Base System (DABS) sets supporting United States Air Force (USAF) contingency operations. The type of shelter in the standard DABS set is the Alaska Small Shelter System (AKSSS). BEAR assets in the standard DABS set to be accommodated within the beddown area include 72 billet shelters, two (2) latrine shelters, two (2) shower shelters, one (1) laundry shelter, one (1) 550-person kitchen package, four (4) command operations shelters, and three (3) morale, welfare, and recreation shelters. Supporting facilities include site development, utilities and connections (electrical power, domestic water & wastewater), and storm water drainage. As part of this anticipated construction contract, a utilities connection extension (domestic water and wastewater) to the limit of site will be performed through a host-nation-directed sole-source local contractor. The contact information for this contractor will be provided in the solicitation. The completed DABS Laydown Site electrical distribution system will use power provided via DABS generator sets; no electric utility grid connection is required. Primary Facilities to be Constructed: Gravel Bed - ~30,957 Square Meters Supporting Facilities to be Constructed (not all inclusive): Concrete Pads for Tents/Shelters Fencing Utilities
-Pre-SolicitationOpen
**********UPDATE 11-5-2026********** AMENDMENT 001 posted today with the following five (5) updated and/or new attachments: 1. 127EAX27Q0007_0001 2. RFI Questions and Responses_127EAX27Q0007_Amendment 001 3. Attachment F1_Wage Determination_Grant County_NM20260019 5.18.2026 4. Attachment F2_Wage Determination_Catron County_NM20260010_5.18.2026 5. Attachment F3_Wage Determination_Sierra County_NM20260012_5.18.2026 **********End of Amendment 001********** Commercial Construction Requirement Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate three other CXT® style vault toilets. There is one option item that includes the demolition of one single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison” single user vault toilet. A second option is to procure a toilet and have it delivered but with no installation.
-Solicitation11/17/2026
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service. The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS). See attachments for full requirements. QA 11_04_2026 Uploaded 11-04-2026 Amendment A001 Posted 11-04-2026
-Combined Synopsis11/17/2026

Additional Details

Solicitation Number

GS-01P-12-BZ-C-0008

Archive Date

May 23, 2012