GovChime
Notice ID: 70a868e2ef5d5dd23bf2e88599d65949Award NoticeAwarded

GSA, PBS, Region 5 Architectural/Engineering and Engineering Services Indefinite-Delivery Indefinite Quantity Contract for Various Locations - State of Illinois

Awarded on November 29, 2016. Full description on SAM.gov.

Awarded tounder GS-05-P-16-GB-D-7000 (source: SAM.gov award notice)

Overview

Posted
December 21, 2016
Notice type
Award Notice
NAICS
541310: Architectural Services
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R5 ACQUISITION MANAGEMENT DIVISION
Place of performance
General Services Administration (GSA) Region 5, the Chicagoland area defined as the Chicago-Naperville-Elgin, IL-IN-WI Metropolitan Statistical Area of which Chicago-Aurora-Joliet, IL Metropolitan Division is one of three Division making up the Chicago metropolitan statistical area (MSA) and shall also include the county of Winnebago (to include the City of Rockford)., Chicago, 60604
PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Dec 5, 2025
Award date
Nov 29, 2016
Award amount (SAM.gov award notice)
Not specified

Identifiers

Solicitation number
GS-05-P-16-GB-D-7000
Notice ID
70a868e2ef5d5dd23bf2e88599d65949
Award number (PIID)
GS-05-P-16-GB-D-7000

Description

Solicitation GS-05-P-16-GB-D-7000, GSA, PBS, Region 5 Chicagoland Indefinite Delivery Indefinite Quantity (IDIQ) Architectural and Engineering design Services Contract Solicitation Number: GS-05-P-16-GB-D-7000 Notice Type: Pre-Solicitation This pre-solicitation notice is a Request for Qualifications (RFQ) only. The Government may award to design teams led by either an Architectural or an Engineering firm. The RFQ will be conducted in accordance with FAR Part 36, construction and architect-engineer contracts. The RFQ due date and time is: Monday, April 18, 2016 at 4:00PM CT Contracting Office Address: General Services Administration Public Buildings Service 230 South Dearborn Street, Room 3600 Chicago, Illinois 60604 United States Place of Performance: General Services Administration (GSA) Region 5, the Chicagoland area defined as the Chicago-Naperville-Elgin, IL-IN-WI Metropolitan Statistical Area of which Chicago-Aurora-Joliet, IL Metropolitan Division is one of three Division making up the Chicago metropolitan statistical area (MSA) and shall also include the county of Winnebago (to include the City of Rockford). In the event of additional GSA needs for A/E Services within Region 5 (Minnesota, Wisconsin, Illinois, Indiana, Ohio and Michigan) but outside of a contractors designated zone - a mutual agreement between GSA and the prospective firm may be proposed. Offer and/or acceptance of such a request would not be mandatory or required. Primary Point of Contact: Matthew Matusik Contracting Officer Acquisition Management Division Chicagoland Construction Contracting Team (5P1QCC) matthew.matusik@gsa.gov Phone (312) 353-3782 Secondary Point of Contact: Gregory Karpovics Contracting Specialist Acquisition Management Division Chicagoland Construction Contracting Team (5P1QCC) gregory.karpovics@gsa.gov Phone (312) 353-0446 Synopsis: This contract will result in multiple, indefinite delivery, indefinite quantity (IDIQ) contracts to provide the Chicagoland area with Architecture and Engineering (AE/EA) services led by either an architectural or an engineering firm. These services are to be consistent with the Guiding Principles of GSA's Design Excellence program for a variety of project types across a wide range of project budgets. Assembled teams should be well rounded and clearly identify relevant concentrated areas of expertise. Architectural and Engineering (AE/EA) Services will be rendered for projects managed by GSA's Chicagoland Service Center Operation Division (CSCOD). Most work orders will be executed for repair and alteration projects within existing buildings. The estimated cost of construction at award (ECCA) can range from $2,000 to approximately $2,800,000(or the current Prospectus Project Threshold), however it is anticipated that the majority of projects will have an ECCA between $50,000 and $500,000. In accordance with Federal Acquisition Regulation (FAR) 15.404-4(c)(4)(i)(B), fees for design services cannot exceed 6% of the ECCA. For general guidance describing included and excluded services, in regards to the 6% fee limitation, see PIB 13-04 Attachment. A broad range of services potentially requested under this IDIQ contract may include but are not limited to the following: ? Feasibility, pre-design, and project development studies ? Field investigation, Site surveys ? Concept design, Design development and Construction document development (both engineering and architectural) ? Estimating ? Constructability review and evaluation ? Submittal and shop drawing review ? Historic Preservation ? MEP services, ? Mechanical system assessments and design ? Mechanical component assessments and designs (such as pumps, fans, air handlers, water distribution systems) ? Air distribution assessment and design ? Post Construction Contract Services (PCCS) ? Management and inspection (M&I) services during construction ? Record and close-out documents ? Master planning ? Fa ade evaluation and remediation design ? Structural evaluation and design ? Historic building assessment, materials review and repair solution/ remediation ? Building condition survey evaluation reports (exterior and interior) ? Fire and Life Safety evaluation and design ? Existing conditions surveys ? Building standard documents ? Interior design including FFE ? Temperature control assessment and design ? BAS system assessment and integration ? Building and system commissioning ? Water infiltration investigation and mitigation design Architectural and engineering disciplines and other specialized expertise that may be required to accomplish the scopes of the task orders include but are not limited to: ? Architecture ? Mechanical Engineering ? Electrical Engineering ? Structural & Civil Engineering ? Plumbing ? Fire Protection ? Life Safety ? Security ? Seismic & Blast ? Vertical Transportation ? Space Planning & Workplace ? Interior Architecture ? Real Estate Market Analysis ? Historic Preservation ? Cost Estimating ? Scheduling ? Master Planning ? Report writing ? Quality control review ? Surveying ? Sustainability & LEED Certification ? Building Information Modeling ? 3-D rendering ? Code Compliance ? Environmental Services The duration of the base period will be one (1) year. The contract will include a clause for four (4) options, each of which could extend the contract for an additional one (1) year period and may be exercised at the option of the Government. The maximum order limitation is $2,500,000 for each one year period. The minimum guarantee for this contract is $2,500 for the base year only. The selected firms must negotiate overhead, profit and hourly rates for major anticipated disciplines to be used in negotiating fixed price task orders in phase II as described below. Firm/team must have an existing active production office within or near the geographic region previously defined as "Chicagoland" so as to minimize direct travel cost on task orders. Joint ventures or firm/consultant arrangements will be considered. In order to encourage participation in this RFQ, a pre-submission meeting is scheduled for April 05, 2016 at 09:30 AM. The meeting will be available via teleconference only. Attendance is completely voluntary and will not positively or negatively impact a team's evaluation. Those wishing to attend should RSVP to Matthew Matusik, Contracting Officer, at matthew.matusik@gsa.gov. In the e-mail, please provide the names of those attending. A webex link to the meeting will be provided. TEAM SELECTION: Team selection is executed through a two-step process where the first step is qualification based and the second step is fee based. STEP I: In the first step, teams will submit qualification based on the criteria identified below. A source selection board will review each team's qualifications and establish a short list of firms. The shortlist will constitute a combination of small and large businesses. The shortlist may be composed of architect-led OR engineering-led teams OR a combination of both. The Government reserves the right to hold interviews with each of the short-listed firms to clarify and confirm submitted information. EVALUATION FACTORS: I. Specialized Experience and Technical Competence (45%): Teams must demonstrate success in appropriately addressing a variety of complex as well as routine design issues that seamlessly incorporate architecture and engineering. Teams must be able to demonstrate their competency at executing services such as those noted previously in this solicitation. Teams must demonstrate that they are adept at solving a variety of issues and note where their specialized experience is evident. The spirit of the GSA Design Excellence program and its Guiding Principles should be evident in the team's work http://www.gsa.gov/portal/category/21079 Design Excellence in architecture and engineering should be addressed through problem solving within existing buildings and achieving creative solutions considering function, scale, image, engineering, and community context, under the constraints of budget, schedule etc. Examples of using emerging, or innovative design and construction processes must be demonstrated. Team must be able to provide services ranging from pre-design studies through construction completion. Teams should highlight specialized areas of expertise such as Historic Preservation and Sustainable design. Consideration will be given to teams with specialized experience. II. Management Plan, Team Structure and Quality Control (30%): Teams must demonstrate a clear and efficient management plan and team structure (which includes sub-consultants) that addresses roles and responsibilities, lines of authority, coordination and communication. Assembled teams should be well rounded and clearly identify relevant concentrated areas of expertise. The management plan should clearly describe: ? Environmental Services ? The team's overall design approach. ? The team's ability to staff and manage task orders on an as-needed basis; accounting for the unpredictable issuance of task orders in terms of number, size, importance and urgency. ? The team's plan for designing within a negotiated fee in accordance with the 6% fee limitation. Consideration will be given to teams that demonstrate a wide range of experience levels, in multiple disciplines, proving the ability to flexibly staff projects based on complexity and budget constraints. Team must demonstrate processes for quality control and commitment to quality control standards while designing within the project's budget and schedule limitations. The plan should specifically address coordinate efforts with sub-consultants. III. Professional Qualifications (10%) Key Personnel must possess the education, qualifications and project experience that will provide the best opportunity for the successful completion of task orders under this contract. Team's design philosophy should be balanced and their intent/involvement for accomplishing task orders under this contract should be appropriate. IV. Past Performance (15%) Teams must be able to demonstrate successful past performance on example projects. This can be from the point of view of the client, professional peers and project teammates. Demonstrated success at collaborative relationships with consultants will be positively considered. The Government has the right to use corporate knowledge when evaluating this factor. REQUIRED DOCUMENTS for QUALIFICATION SUBMISSION: Interested firms having the qualifications to meet these requirements are invited to submit four (4) hard copies and one (1) CD, that include the PDF copies of all the required documents including the Standard Form 330 along with a letter of interest no later than 4:00pm on Monday April 18, 2016 (Central Time). Please provide only the information requested supplemental information will not be evaluated. Documents should be sent to: Matthew Matusik Contracting Officer General Services Administration Public Buildings Service 230 South Dearborn Street, Room 3600 Chicago, Illinois 60604 United States Required form 330 information/instructions: Section C: Do not modify the form by providing more than six proposed team members. Prioritize team members and provide those that are the most important to creating the most well rounded team or show your concentrated areas of expertise. It is recommended that firms responsible for the majority of the work submitted in section F be included. Section E: Do not provide any more than 6 key personnel. You will have to prioritize and provide those that best represent your ability to accomplish the requirements of this contract. CEOs and other executive personnel should not be submitted unless they will have direct responsibility for accomplishing the task orders under this contract. It is required that you include the Lead Architectural/Engineering Designer and the Primary Point of Contact that would be responsible for managing this contract and assigning task orders. It is recommended that the Key Personnel directly responsible for work submitted in section F should also be included. Section F: Form can be modified. Each example project should be no more than 3 single sided pages. Photographs, sketches and drawings are welcome. Only provide 10 total example projects. Projects should demonstrate ability to successfully accomplish a wide range of project types, sizes and budgets. Majority of projects should be constructed; all should be designed within the last 5 years. 3 out of the 10 have to be directly attributable to the Key Designer. Section G: Only indicate that Key personnel participated in example projects when they will be performing the exact same role on this contract. Section H: 1. Management Plan (not to exceed 3 pages) to include the teams overall Management Philosophy and Intent including project assignment, communication, roles and responsibilities, etc. 2. Quality Control Plan - providing services within the negotiated fee in compliance with the Brooks Act (see attachment PBS Procurement Instructional Bulletin PIB 13-04), meeting design schedule, designing a project within budget, plan for managing and scheduling the Government's unpredictable issuance of task orders in terms of number, size and urgency, plan for efficiently covering the entire Chicagoland area including locations where work will be accomplished. 3. Past Performance Documentation (for each sample project submitted in section F): Provide copies of any performance evaluations or owner review of firms performance, provide an accessible owner point of contact including name, title, address and current phone number, provide copies (or listing) of awards, provide copies of letters of appreciation/commendations 4. Teams Design Philosophy and Design Intent (not to exceed 2 pages) All responsive offers will be considered. This is not a request for proposal. The government intends to award multiple contracts from this notice but reserves the right to vary that number based on number and quality of submissions. The prime contractor must be registered in the System for Award Management (www.sam.gov). STEP II After the interviews are complete those teams that the Government opens negotiations with will be required to submit the following documents: These documents are not required with the initial requirements package. ? Labor rates for all pertinent categories/job titles (base rates only, not loaded) for the firm and all subcontractors (to be submitted on a GSA Form 2630). ? Current report from payroll accounting system to include: explanation of pay period and a list to include employee Name, corresponding labor category and salary or hourly rate for those employees that will be working on the Contract (base rates only, not loaded). ? Overhead rates (to be submitted on a GSA Form 2630). ? Financial reports that outline the direct and indirect expenses of the firm. The report should allow GSA to determine what expenses are classified as direct or indirect and used in the computation of the overhead rate. The report shall cover the firm's last completed fiscal year and shall illustrate how you have computed your overhead rate. The proposed fee structure will be evaluated by the GSA contracting officer to determine "fair and reasonableness". If a mutually satisfactory contract cannot be negotiated, the contracting officer shall obtain a written final proposal revision from the firm, and notify the firm that negotiations have been terminated. The contracting officer shall then initiate negotiations with the next qualified firm on the selection list.

Full description on SAM.gov

Award Overview

Award Number

GS-05-P-16-GB-D-7000

Award Amount (SAM.gov award notice)

Not specified

Award Date

Nov 29, 2016

Awardee

Original Solicitation

Notice ID: 70a868e2ef5d5dd23bf2e88599d65949

Posted Date: Dec 21, 2016

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Daniel Schlacks
Contracting Officer

Secondary Contact

Gregory I. Karpovics
Contract Specialist

Documents

Select documents to download

Showing 10 of 10 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-
Combined Synopsis/SolicitationPUBLIC BUILDINGS SERVICEDec 21, 2016-

Lifecycle

Solicitation:GS-05-P-16-GB-D-7000
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 7×
    Combined SynopsisMar 15, 2016

    GSA, PBS, Region 5 Architectural/Engineering and Engineering Services Indefinite-Delivery Indefinite Quantity Contract for Various Locations - State of Illinois

    Notice b4e5221a40850eac17bba5c9e84359af on SAM.gov

  2. AwardedCurrentDec 21, 2016

    GSA, PBS, Region 5 Architectural/Engineering and Engineering Services Indefinite-Delivery Indefinite Quantity Contract for Various Locations - State of Illinois

    Notice 70a868e2ef5d5dd23bf2e88599d65949 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a Sources Sought Notice only. This notice does not constitute a Request for Qualifications (RFQ), Request for Proposals (RFP), or Invitation for Bids (IFB), nor does it represent a commitment by the Government to issue a solicitation or award a contract. This Sources Sought Synopsis is issued solely for market research and planning purposes to determine the availability and adequacy of potential sources. It is not a Request for Proposals or Quotes and imposes no obligation on the Government to acquire any goods or services. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government reserves the right to determine the appropriate acquisition approach based on the results of this market research. Responders should not anticipate feedback regarding their submissions. The Government will not pay for any costs incurred in responding to this Synopsis; all costs associated with responding are solely at the responding party's expense. The information provided herein is subject to change and is non-binding on the Government. The purpose of this notice is to conduct market research to identify potential and qualified sources, assess industry capabilities, and establish effective acquisition strategies, including potential small business set-aside opportunities. No reimbursement will be provided for any costs associated with submitting information in response to this announcement or any follow-up information requests. Overview The General Services Administration (GSA), Public Buildings Service (PBS), is conducting market research to establish Multiple-Award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts for comprehensive, multidisciplinary Architect-Engineer (A/E) services. These contracts are intended to provide integrated, sustainable, and adaptive design solutions across federally owned and leased real property nationwide. The Government anticipates awarding multiple contracts with multi-year ordering periods (5 year base with one 5 year option) to support GSA zones and client agencies across the United States and its territories. Expected typical project size is to be above the simplified acquisition threshold of $350,000. The potential place of performance for services rendered under this contract is on an as-needed basis for federal projects anywhere in the United States and its territories. This will require the capability to travel to GSA and other Government agency office locations nationwide. In some instances, performance of services is expected to require the capability for contractors to dispatch personnel to multiple locations simultaneously. The applicable North American Industry Classification System (NAICS) code for this requirement is 541310 (Architectural Services) & 541330 (Engineering Services), which has a small business size standard of $12.5 million and $25.5 million respectively. Scope of Services Services provided under the resulting IDIQ contracts will encompass a comprehensive range of professional A/E design and engineering disciplines. Scopes of work for individual task orders may include, but are not limited to, the following: 1. Core Project Life Cycle Services - These services cover the entire project lifecycle, from initial concept to post-construction closeout. Planning and Pre-Design Feasibility, pre-design, and project development studies Master planning Cost Estimating Real Estate Market Analysis Assessment and Investigation Existing conditions surveys, and field investigation Building condition survey evaluation reports (exterior and interior) Environmental investigation, reviews, inventories, and audits Energy audits and studies Design and Documentation Concept design, Design development, and Construction document development (both architectural and engineering) Interior design, including Furniture, Fixtures, and Equipment (FFE) Building standard documents Construction Support and Closeout Constructability review and evaluation Submittal and shop drawing review Management and inspection (M&I) services during construction and Construction inspection Building and system commissioning Post Construction Contract Services (PCCS); Record and close-out documents 2. Specialized Technical & System Design - Work requested often involves the assessment, repair, and upgrade of existing complex building systems. Mechanical, Electrical, and Plumbing (MEP) Full MEP services, including design of HVAC systems and electrical systems and lighting Assessment and design for mechanical components (e.g., pumps, fans, air handlers, water distribution systems) and air distribution Design of water and waste water systems, including performance of sanitary inspections Temperature control assessment and design and BAS system assessment and integration Building Structure and Envelope Structural evaluation and design Façade evaluation and remediation design Water infiltration investigation and mitigation design Safety, Security, and Compliance Fire and Life Safety evaluation and design Rehabs to improve energy efficiency and safety concerns Seismic & Blast protection and Vertical Transportation Code Compliance 3. Required AE Disciplines and Expertise - AE firms will need staff with licensed and/or specialized expertise in the following disciplines: Core Architectural and Engineering Disciplines Architecture and Interior Architecture Mechanical Engineering, Electrical Engineering, Structural & Civil Engineering, and Plumbing Historic Preservation Specialized Expertise A Qualified/Licensed Fire Protection Engineer (NCEES)* Security Space Planning & Workplace Cost Estimating and Scheduling Environmental Services Modernization and Quality Control Building Information Modeling (BIM) Quality control review and Report writing Submission Requirements Interested firms are invited to submit a written Capability Statement. Submissions must not exceed five (5) pages in length and must address the following elements: A. Company Profile Official company name, street address, telephone number, and primary website URL. Unique Entity Identifier (UEI) and Commercial and Government Entity (CAGE) Code. Office location(s) and primary design production facilities. Business size status under NAICS 541310 or 541330 (Large Business or Small Business). Applicable SBA socio-economic certifications (e.g., 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business [SDVOSB], Woman-Owned Small Business [WOSB], or Economically Disadvantaged WOSB [EDWOSB]). B. Relevant Experience Summarize three to five (3–5) relevant projects completed within the past ten (10) years. Demonstrate experience in projects of similar scale, scope, and complexity, such as federal workplace design, major repairs and alterations, or complex building systems. Include project title, customer/agency point of contact, contract value, role (Prime or Subcontractor), and a brief narrative of the work performed. C. Nationwide Capacity Demonstrate organizational capacity to manage and execute multiple task orders simultaneously across diverse geographic locations nationwide. Describe key disciplines maintained in-house versus those typically fulfilled through subcontractor or joint venture arrangements. Submission Instructions Responses must be submitted electronically via email to the primary procurement contacts listed below: Submission Deadline: Primary Contact: Point of Contact Email: Subject Line Format: Sources Sought Response - National A/E IDIQ - [Firm Name] Hard copies, telephonic inquiries, and late submissions will not be reviewed or acknowledged. All information provided in response to this notice will be used strictly for market research and acquisition planning purposes. This notice encourages participation from qualified small business concerns, including socio-economic program participants, to assist GSA in evaluating the feasibility of small business set-asides for this procurement. All prospective offerors are responsible for monitoring SAM.gov for updates, future notices, or potential solicitations related to this requirement.
78%
Market Research11/13/2026
This notice does not constitute a Request for Quote (RFQ), Invitation for Bid (IFB), or Request for Proposal (RFP), nor does it promise to issue any such solicitations in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids, or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. This announcement and the related draft Statement of Work (SOW) are published solely to identify interested firms and to solicit industry comments, suggestions, recommendations, and feedback aimed at supporting and improving the Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The intent of the 374th Contracting Squadron (374 CONS) is to subsequently solicit and award an Indefinite Delivery/Indefinite Quantity (IDIQ) Simplified Acquisition of Base Engineering Requirements (SABER) construction contract. SABER is a single-award, design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on a general statement of work (SOW) further defined with each individual task order. The scope of this contract generally includes non-complex, minor design efforts and multiple construction trades. This includes, but is not limited to, interior renovations and alterations—such as office and restroom renovation and repairs—demolition works, asbestos and hazardous materials (HAZMAT) abatement, as well as general building construction, civil engineering, mechanical, electrical, and telecommunications works. This contract utilizes a Government-furnished Unit Price Guide (UPG) provided in advance. The UPG will be shared with the contractor, who shall prepare all subsequent task order proposals and price quotes based on the established unit prices. The contract maximum amount is $49M. The total Period of Performance of contractual coverage shall not exceed five (5) years and plus optional three (3) years. The anticipated period of performance is 1 June 2027 – 30 May 2034. All companies must be registered within the System for Award Management (SAM) (https://www.sam.gov). DFARS clause 252.225-7042 applies to this procurement. Under this clause, the offeror represents that it is properly authorized to conduct business and commerce in the country or countries where this contract is to be performed, which is a mandatory prerequisite for bidding. This requirement presupposes that the offeror possesses all necessary authority and licenses, including a Construction Business License in Japan, as applicable. In response to this Sources Sought Notice, the Government requests that interested businesses capable of fully supporting this requirement furnish the following information: Name of the firm, Point of Contact (POC), phone number, email address, and CAGE code. Additionally, please indicate whether your company intends to participate in the bidding process for this contract. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. However, if a competitive solicitation is released, it will be synopsized on SAM.gov. It is the responsibility of potential offerors to monitor SAM.gov for additional information pertaining to this requirement. Interested parties should provide their written responses via email to Ms. Yuki Kobayashi at yuki.kobayashi.jp@us.af.mil and Ms. Namiko Kaneko at namiko.kaneko.1.jp@us.af.mil. All submissions must be received no later than 20 Nov 2026, 1600 hours, Japan Standard Time (JST).
71%
Market Research11/20/2026
Description The purpose of this announcement is to request new Architect / Engineer (A/E) qualification information for the General Services Administration / Public Buildings Service (GSA/PBS) A/E short selection for Continental United States (CONUS) and Outside Continental United States (OCONUS). WHAT IS THE SHORT SELECTION PROCESS? The short selection process utilizes the procedures set forth in Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) Subsection 36.202-4 for Architect/Engineer (A/E) projects with an estimated total fee less than the simplified acquisition threshold (currently $350,000; see RFO FAR Part 2.101). The A/E's professional qualifications, the firm's geographic proximity, knowledge of the local area as identified on the A/E's SF330, and supplemental information will be used for the first preliminary screening of firms. For each proposed project, GSA will conduct discussions with at least three (3) firms to consider anticipated concepts and compare alternative methods for furnishing services. Additional information may be requested during discussions if necessary to facilitate the final ranking of firms (i.e.: past performance references, specialized experience, capacity, schedule, etc.). Upon conclusion of discussions, the top three firms will be ranked, and a price proposal will be requested from the highest ranked firm. If a fair and reasonable price cannot be negotiated with the highest ranked firm, a request for a price proposal will be sent to the second ranked firm, and so on until an award can be made at a fair and reasonable price. All acquisitions utilizing the GSA A/E short selection list (database) shall be set-aside for small business concerns unless requirements cannot be met by a small business and the Contracting Officer (CO) obtains a proper waiver. WHAT IS THE SHORT SELECTION PROCESS USED FOR? GSA will use the short selection list to award A/E contracts, valued at less than the simplified acquisition threshold (currently $350,000) in CONUS/OCONUS (NOT Estimated Cost of Construction at Award (ECCA). The firm must have NAICS code 541310 - Architectural Services, with a small business size standard of $12.5 million and/or 541330 - Engineering Services, with a small business size standard of $25.5 million. The firm must clearly notate which states/territories they have active production offices and which states they are licensed by November 1, 2026. Most work will be executed for repair and alteration projects within existing Federal Buildings and U.S. Courthouses. The estimated cost of construction at award (ECCA) for a majority of the project requirements could range from, but are not limited to, above micro-purchase threshold for construction (currently $2,000) to annual prospectus threshold (currently $3.961M) or higher. Fees for design services cannot exceed 6% of the ECCA. For more information about the 6% fee limitation, see FAR 15.404-9(c)(4)(ii) (GSA Class Deviation RFO-2025-15) and 41 U.S.C. 3905(b)(3). GSA manages a nationwide real estate portfolio of approximately 360 million rentable square feet, including preserving more than 500 historic properties nationwide. A broad range of services potentially requested under this short list may include, but are not limited to the following: 1. Core Project Life Cycle Services - These services cover the entire project lifecycle, from initial concept to post-construction closeout. Planning and Pre-Design Feasibility, pre-design, and project development studies Master planning Cost estimating Real estate market analysis Assessment and Investigation Existing conditions surveys, and field investigation Building condition survey evaluation reports (exterior and interior) Environmental investigation, reviews, inventories, and audits Energy audits and studies Design and Documentation Concept design, design development, and construction document development (both architectural and engineering) Interior design, including furniture, fixtures, and equipment (FFE) Building standard documents Construction Support and Closeout Constructability review and evaluation Submittal and shop drawing review Management and inspection (M&I) services during construction and construction inspection Building and system commissioning Post construction contract Services (PCCS); Record and close-out documents 2. Specialized Technical & System Design - Work requested often involves the assessment, repair, and upgrade of existing complex building systems. Mechanical, Electrical, and Plumbing (MEP) Full MEP services, including design of HVAC systems, electrical systems, and lighting Assessment and design for mechanical components (e.g., pumps, fans, air handlers, water distribution systems) and air distribution Design of water and waste water systems, including performance of sanitary inspections Temperature control assessment and design and BAS system assessment and integration Building Structure and Envelope Structural evaluation and design Façade evaluation and remediation design Water infiltration investigation and mitigation design safety, security, and compliance Fire and life safety evaluation and design Rehabs to improve energy efficiency and safety concerns Seismic & blast protection and vertical transportation Code compliance 3. A/E Disciplines and Expertise - A/E firms will need staff with licensed and/or specialized expertise. The following are typical disciplines and categories utilized for GSA projects. Firms do not need to have all of them, but should include the most relevant disciplines for their firm: Core Architectural and Engineering Disciplines Architecture and anterior architecture Mechanical engineering, electrical engineering, structural & civil engineering, and plumbing Historic architecture/preservation Specialized Expertise A qualified/licensed fire protection engineer (NCEES)* Security Space planning & workplace Cost estimating and scheduling Environmental services Building automation Scifs Modernization and Quality Control Building information modeling (BIM) Quality control review and report writing SUBMISSION INSTRUCTIONS To be considered for future Architect-Engineer (A/E) projects, your firm must submit a package demonstrating the applicability and comparability of its portfolio to the types of services outlined above. Please submit your complete package as a single PDF document. This file, which should be no larger than 30MB and no more than thirty (30) pages, must contain all submittal documents. Submit your PDF file as an attachment via the online “GSA A/E Short Selection Submission Form” (Link provided below). Note: Hardcopy submissions received by mail will not be filed or considered. The following information shall be submitted as part of the thirty (30) page limit (LISTED IN REQUIRED ORDER): DO NOT SUBMIT ANY PROPRIETARY INFORMATION 1. A cover letter. The letter should outline the work your firm specializes in and include a brief description of your firm's capabilities specifically related to the project examples stated above. 2. SAM Entity Registration Print Out - 1st and 2nd page only to show active registration in System for Award Management (SAM). Registration is required for award of federal contracts and you must have an active registration in SAM to be considered for project work. Contractors may register in SAM free of charge at https://sam.gov/ under the header labeled Register Your Entity or Get a Unique Entity ID. 3. Standard Form (SF) 330 - Architect-Engineer Qualifications. DO NOT include subconsultants. Please include photos of accomplished work. 4. A separate list of the licensed (or will be licensed by November 1, 2026) professionals and the State/territories of their licensing. Note: This A/E short selection process is for Primes only; consultants are NOT part of this selection process. However, submitted project experience may reference work executed with consultants. Firms should highlight their specific role and explain the work they performed alongside any consultants. Consultants will be requested by project managers during project development. Submittals that don't contain the required documentation will be returned for revision and/or non selection. Organizing your submittal package in the same order enumerated above will facilitate a more efficient review process. Questions related to this announcement shall be referred to aeshortselection@gsa.gov The following information should be easily found in your SF330 Submission: 1. Relevant Project Experience, Demonstrated Comparability and Creative Problem Solving Offerors must provide a minimum of three (3) but no more than five (5) comparable project examples that demonstrate a wide range of repair and alterations work similar in budgets and complexities to those anticipated for contracts. An additional maximum of ten (10) relevant projects completed in the last ten (10) years can be submitted in list form. Please include relevant project photographs. A comparable project is defined as an “A/E engagement involving the repair, alteration, or renovation of existing, occupied facilities, with a focus on both architectural and engineering solutions. Specifically, the project should demonstrate specialized experience in: Building system upgrades (e.g., MEP services or mechanical pump replacement) Historic preservation (especially classical building architecture) Workplace design Furthermore, a comparable project's Estimated Cost of Construction at Award (ECCA) should generally range from $50,000 to an annual prospectus threshold (currently $3.961M). Breadth of Scope: Teams must demonstrate proficiency in seamlessly incorporating architecture and engineering to solve both complex and routine design issues within existing buildings. Specialized Expertise: Highlight specialized experience in the areas most critical to the GSA/PBS mission. This must include work in: Occupied buildings Historic preservation, restoration, and adaptive reuse (special consideration will be given to firms demonstrating experience with classical building architecture and design) Building system upgrades (e.g., MEP services, mechanical pump replacement, HVAC systems, electrical systems, and building controls). Workplace design strategies, interior office redesign, and building standard documents Creative Problem Solving: Firms must demonstrate their ability to be creative and "think outside the box" when developing design solutions, especially given the constraints and challenges of government buildings and existing customer agencies while successfully navigating constraints such as schedule and budget. 2. Team Capacity, Management, and Quality Control The team’s ability to manage projects efficiently, flexibly, and collaboratively is essential for handling the unpredictable nature of GSA task orders. Contract Management and Flexibility: Demonstrate the ability to staff and manage contracts on an as-needed basis, accounting for the unpredictable issuance of work in terms of number, size, importance, and urgency. Consultant and Customer Agency Management: The A/E short selection process is for the Architecture or Engineering Prime only, but the firm must demonstrate its ability to manage its entire team. Firms must demonstrate proven success in establishing good relationships with and effectively managing future sub-consultants, as well as managing scope and communication while working with difficult customer agencies. Quality Assurance: Team must demonstrate formalized processes for quality control (QC) and a commitment to QC standards while consistently designing within the project’s budget and schedule limitations. 3. Key Personnel Education and Qualifications Key Personnel should possess the education, professional qualifications, and specific project experience that provides the best opportunity for the successful completion under this contract. Licensing: Provide a separate list of states in which the firm is licensed or will be licensed by November 1, 2026. Specialized Roles: Key Personnel must demonstrate expertise in disciplines relevant to the services outlined above, such as a Qualified Fire Protection Engineer1, historic preservation, etc. 1A Qualified Fire Protection Engineer is an individual with deep knowledge of fire physics and chemistry, meeting one of the following criteria: (a) An engineer with an undergraduate or graduate degree in fire protection/safety engineering, plus a minimum of four (4) years of relevant work experience; (b) A registered Professional Engineer (P.E. or similar) in Fire Protection Engineering; or (c) A P.E. in a related engineering discipline who is a Professional Member of the Society of Fire Protection Engineers and has passed the NCEES fire protection exam. 4. Past Performance Offerors should include CPARS (Contractor Performance Assessment Reporting System) if they have past government experience as the prime. No more than three (3) most recent relevant records. The CPARS information does not count against the thirty (30) page limit. Impact: If a firm does not have past government experience, they will not be negatively impacted during the selection process. Please register to attend the industry outreach and Q&A meeting on October 16 at 9am PDT or October 22 at 3pm EDT by completing the “A/E Short Selection Process Registration Form CONUS/OCONUS” (Link provided below). Invites will be sent out to all registered attendees approximately one week in advance. Relavant Links GSA A/E Short Selection Process for CONUS/OCONUS - Registration Form https://forms.gle/8kd1qZfZeVMag3HG9 GSA A/E Short Selection Process for CONUS/OCONUS - Q&A https://docs.google.com/document/d/1sGIs_KEnEvP99mxeB2VKBS64IVoUixEZSOLsczc_2As/edit?usp=sharing GSA A/E Short Selection Process for CONUS/OCONUS - Submission Form https://forms.gle/7Rh3FkMkubweUHveA
66%
Market Research10/31/2026
The agency notice ID should be 1620000393 Admendment 0002 SVO237-26 posted 09/21/2026 Add additional information in the description for clarification and correct the document number from SVO237-26 to SV0237-26. As provided, all other terms and conditions remain unchanged. Offerors must submit SF 330 Parts I and II and sign and return all admendments. The following Qualifications-Based Selection (QBS) shall be submitted by each offeror illustrating work performed within a correctional environment, addressing each criteria listed below: Professional Qualifications: Licenses, registrations, education, and overall staff capability. Specialized Experience: Past success and technical competence on similar project types. Capacity: Ability to perform the work and meet project schedules. Past Performance: Record of previous work quality, responsiveness, and client satisfaction. Technical Approach: Project understanding, quality control procedures, and innovative concepts. Geographic Location / Local Knowledge: Familiarity with the project locale, though strict local preferences are heavily restricted or capped Once the QBS has been met consideration for a contract award will be based solely upon the hourly rates, overhead and profit that are proposed and found to be fair and reasonable.
62%
Solicitation11/02/2026
INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE
59%
Combined Synopsis12/10/2026

Additional Details

Solicitation Number

GS-05-P-16-GB-D-7000

Archive Date

Jan 5, 2017