GovChime
Notice ID: 4f69063cf57e7e08fd8b066148164398Award NoticeAwarded

Y--BLM VERNON SECURITY FENCING PROJECT

Awarded on August 8, 2017. Full description on SAM.gov.

Awarded tounder L17PC00071 (source: SAM.gov award notice)• $87.2K

Overview

Posted
August 8, 2017
Notice type
Award Notice
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of the InteriorBUREAU OF LAND MANAGEMENT

Notice details

Office
UTAH STATE OFFICE
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Aug 8, 2017
Award amount (SAM.gov award notice)
$87.2K

Identifiers

Solicitation number
L17PS00718
Notice ID
4f69063cf57e7e08fd8b066148164398
Award number (PIID)
L17PC00071

Description

IGF::OT::IGF BLM VERNON SECURITY FENCING PROJECT

Full description on SAM.gov

Award Overview

Award Number

L17PC00071

Award Amount (SAM.gov award notice)

$87.2K

Award Date

Aug 8, 2017

Awardee

Awardee UEI

GUHMTMJFMLK9

Original Solicitation

Notice ID: 4f69063cf57e7e08fd8b066148164398

Posted Date: Aug 8, 2017

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Meier, Vicki

Documents

No documents available.

Lifecycle

Solicitation:L17PS00718
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationJun 23, 2017

    Y--VERNON SECURITY FENCING PROJECT

    Notice bad1615c0f9b019a976c341e05076447 on SAM.gov

  2. SolicitationJul 13, 2017

    Y--VERNON SECURITY FENCING PROJECT

    Notice 0099efe6a8b8b94fe5caf4a82740ff07 on SAM.gov

  3. AwardedCurrentAug 8, 2017

    Y--BLM VERNON SECURITY FENCING PROJECT

    Notice 4f69063cf57e7e08fd8b066148164398 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
71%
Solicitation11/11/2026
PGMB Security Gate - Amendment 4 provides the questions and answers collected following the site visit conducted on 10/26/2026. Quotes remain due on November 23, 2026, at 2:00 PM MST.
71%
Combined Synopsis11/23/2026
This announcement is to all Small Business, 8(a) Small Business, HUBZone Small Business, Indian Small Business Economic Enterprises, Service-Disabled Veteran-Owned Small Business and Women-Owned Small Business concerns that may be interested in performing a contract for the California Great Basin Region of the Bureau of Reclamation. The work to be performed is described below. Based upon response to this announcement, the Government may determine to set this acquisition aside or proceed with an unrestricted solicitation. The applicable North American Industry Classification System (NAICS) Code is 238990 and the related small business size standard is $19M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $25,000.00 and $100,000.00. This procurement will require 100% performance and payment bonds. This sources sought notice is for market research and acquisition planning purposes only. No formal solicitation for this work exists at this time. The work is located at U.S. Bureau of Reclamation, Lake Berryessa Field Office, Napa, California. Interested parties should include the following information in their response: (a) Business name, address, cage code, size classification based on NAICS size standard, socioeconomic classification (i.e. HUBZone; 8(a), etc.), and a point of contact; (b) A positive statement of your intention to submit an offer for this solicitation as a prime contractor; (c) Evidence of your experience performing work similar in type and scope to the work in this announcement within the last five years. The evidence should include: contract numbers, project titles, dollar amounts and points of contacts with telephone numbers. Please do not include more than three past projects; and (d) Include attachments cataloging the company's equipment assets, personnel resources and financial resources that demonstrate company responsibility and capability to perform required work. (e) If bonding is required, also provide evidence of your bonding capacity; All interested parties are encouraged to respond to this notice, by e-mail to rosana_yousefgoarji@ios.doi.gov not later than close of business on 5/20/2026. The information provided in this announcement is all information the Government has available at this time. There are no specifications, drawings, bid packages, or source lists available. System for Award Management (SAM) applies to this procurement. Prospective contractors must be registered in the System for Award Management (SAM) prior to award. Lack of registration in the SAM database will make an offeror ineligible for award. Information on SAM registration can be obtained via the Internet at http://www.sam.gov PRINCIPAL COMPONENTS OF WORK: Principal components of work include: • Using NRCS standards, or better, the Contractor will construct 10,200 feet of fire resistant 4-strand, Wildlife Friendly, exclusion fencing. • Using NRCS standards, or better, the Contractor will install 3,400 feet of Let-Down Fence below the reservoir’s 440’ above sea level line to allow staff to lower fencing in high water years to reduce the risk of it entangling boaters and anglers. • Contractor will install 5 vehicle access gates adjacent to accessible “U” chicanes using non-combustible materials in the existing fence lines perpendicular to east side road to livestock and pedestrian access through each exclusion area.
69%
Market Research05/20/2026
Solicitation number W9126G26QA100 See revised attached documents. This is a combined synopsis/solicitation for commercial construction as a Commercial Service: This is a non-personal services contract for Solicitation number (W9126G26QA100) is issued as a Request for Quote RFQ for r Installation of Security Fence at Belton Lake fencing removal, replacement, and site security enhancements. The amendment changed to 500 linear feet and the replacement of approximately 655 linear feet of 7-foot-tall woven security fence. See the attached documents for changes to PWS bid schedule and attachment 2. Answers to pre-bid questions are also attached. The proposals are due at 4:00 Central Time on 22 June 2022
66%
Combined Synopsis06/22/2026
WA-SPRING CRK NFH-CHAIN LINK FENCING Modification to add WD no other changes
65%
Solicitation12/17/2026

Additional Details

Solicitation Number

L17PS00718

Archive Date

Aug 23, 2017