Notice ID: c4381e086fcb3a4d69115649d2602cdaSolicitation

Z--Amendment: Remove & Replace Asbestos Transite Panels - Scranton, PA

Archived on July 6, 2016. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
June 14, 2016
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
DSC CONTRACTING SERVICES DIVISION
Place of performance
Steamtown National Historic Site<br />350 Cliff St<br />Sranton<br />PA<br />18503<br />USA<br /> 18503 USA
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
P16PS01148
Notice ID
c4381e086fcb3a4d69115649d2602cda

Description

Amendment: Remove Transite Panels & Replace with Metal Corrugated Panels, Steamtown National Historic Site (STEA), Maintenance of Way Building (MOW), 150 South Washington Avenue, Scranton, PA 18503 See attachments for details

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Driver, Cameron

Documents

No documents available.

Lifecycle

Solicitation:P16PS01148
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationMay 2, 2016

    Z--RFQ: Remove & Replace Asbestos Transite Panels - Scranton, PA

    Notice d4501b4be966c2028a5028a7ad97d478 on SAM.gov

  2. SolicitationCurrentJun 14, 2016

    Z--Amendment: Remove & Replace Asbestos Transite Panels - Scranton, PA

    Notice c4381e086fcb3a4d69115649d2602cda on SAM.gov

Similar Opportunities

Title
Phase
Deadline
PGMB Security Gate - Amendment 3 extends the quote submission deadline from November 9 to November 23, 2026, at 2:00 PM MST.
Combined Synopsis11/23/2026
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
Solicitation11/11/2026
PROJECT: Lowline Area Burned Fence Construction Project -GMUG NF in Gunnison County, Colorado *******READ EACH OF THE DOCUMENTS THAT ARE LOCATED IN THE ATTACHMENTS/LINKS SECTION****************** POC'S: JANICE KING, CONTRACT SPECIALIST, at janice.king@usda.gov and LUCAS DAHLMAN, CONGTRACTING OFFICER, at lucas.dahlman@usda.gov Questions shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than November 16, 2026, at 9:00 a.m. Mountain Time. Quotes shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than December 3, 2026, at 9:00 a.m. Mountain Time. DESCRIPTION: The project will consist of constructing approximately 16,414 feet of four wire fence in the vicinity of the 2023 Low Line Fire, Gunnison County, Colorado. The purpose and need are to replace existing fences damaged by the 2023 Low Line Fire with a friendly wildlife fence and provide removal of old and damaged fence materials. See the SOW, SOI, SPECS and Diagram for more details. There is a Site Visit scheduled for this project for November 9, 2026, at 10:00 a.m.Mountain Time. Additional details regarding the Site Visit are located in this solicitation.
Combined Synopsis12/03/2027
Amendment 0002 to the Solicitation for Scaffolding for Repair and Repoint Chalmette Monument, Louisiana. See Amendment 0002 for details.
Combined Synopsis11/13/2026
WA-SPRING CRK NFH-CHAIN LINK FENCING Modification to add WD no other changes
Solicitation12/17/2026

Additional Details

Solicitation Number

P16PS01148

Archive Date