GovChime
Notice ID: 523c82e9b7b9c40e23d6168085a7ba5cCombined Synopsis/Solicitation

76--Inland Sensitivity Atlas for WI/IL/MN

Archived on September 30, 2013. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
August 8, 2013
Notice type
Combined Synopsis/Solicitation
NAICS
541370: Surveying and Mapping (except Geophysical) Services
Agency
Environmental Protection Agency

Notice details

Office
REGION 5 CONTRACTING OFFICE
Place of performance
Region 5US Environmental Protection Agency77 West Jackson BoulevardChicagoIL60604-3507USA 60604-3507 USA
PSC
76: BOOKS, MAPS, OTHER PUBLICATIONS
Last updated
Dec 5, 2025

Identifiers

Solicitation number
RFQ-IL-13-00016
Notice ID
523c82e9b7b9c40e23d6168085a7ba5c

Description

---- Combined Synopsis/Solicitation ---- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; This is the announcement for Solicitation RFQ-IL-13-00009. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005 69. This solicitation is being announced utilizing FAR Part 12 Commercial Procedures and is unrestricted. The U.S. Environmental Protection Agency intends to solicit and award a firm-fixed contract under Federal Acquisition Regulation (FAR) 12 for updating of the Region 5 Inland Sensitivity Atlases for Wisconsin, Illinois, and Minnesota. Planning expertise for sub-area planning committees and maintenance and updating of the Regionial Contingency Plan/Area Contingency Plan (RCP/ACP) is also part of this contract. The North American Industry Classification System (NAICS) code is 541370 Surveying and Mapping (except Geophysical) Services and the business size standard $14 Million. ----Line Items--- See attached SOW for line items. The items will be individually ordered based upon availability of funds. Offerors must include pricing for option years. There are a total of four potential option years, to be exercised at the sole discretion of the government for a maximum potential period of performance of five years. ---- Provisions and Clauses ---- It is the vendor's responsibility to be familiar with all applicable clauses and provisions. FAR Clauses and provisions incorporated by reference may be viewed in full text via the Internet at http://farsite.hill.af.mil/ or http://www.arnet.gov/far/. The following FAR provisions are applicable: FAR 52.212-1 Instructions to Offerors Commercial FAR 52.212-3, Offeror Representations and Certifications is applicable and can be downloaded from the internet: http://farsite.hill.af.mil/. If an offeror maintains the required certifications in System for Award Management (SAM) which can be found at: http://www.acquisition.gov only paragraph (b) of this provision must be submitted. The following additional FAR clauses are applicable: See attached Body for applicable clauses ---- Additional Instructions and Evaluation ---- Clearly identify a Firm Fixed Price per line item identified in the attached SOW. Offeror must be registered in SAM to be eligible for award. ---- Submission of Quotes ---- Quotes must be received by the date specified in this announcement to Geoff Krieger, Contract Specialist through FedConnect. Refer to the link provided in the solicitation.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Geoffrey Krieger

Documents

No documents available.

Lifecycle

Solicitation:RFQ-IL-13-00016
  1. Combined Synopsis
  1. Combined SynopsisCurrentAug 8, 2013

    76--Inland Sensitivity Atlas for WI/IL/MN

    Notice 523c82e9b7b9c40e23d6168085a7ba5c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
SEAM - Superfund Enforcement Action Management Support Services, Provide EPA response to solicitation questions
-Solicitation07/10/2026
Region 5, Superfund Technical Assessment & Response Team VI (START VI)
-AwardedOpen
The Mission Support Portfolio PAE Transport is seeking innovate approaches and industry capabilities from potential sources to deliver a comprehensive contract for site power installation and implementation for the Defense Information Systems Network (DISN) and Department of War (DoW) Teleport Program Office, the 3rd largest global carrier-grade network responsible for delivering information superiority to the Warfighter. Please note that the PSC and NAICS code are subject to change once information is reviewed and an official solicitation is posted. Also, the place of performance is defined further within the RFI attachment. **This has been updated on October 28, 2026 to include the answers to questions received as well as update the response date to November 5. 2026.
-Pre-Solicitation11/12/2026
This is a Sources Sought Notice only. This notice does not constitute a Request for Qualifications (RFQ), Request for Proposals (RFP), or Invitation for Bids (IFB), nor does it represent a commitment by the Government to issue a solicitation or award a contract. This Sources Sought Synopsis is issued solely for market research and planning purposes to determine the availability and adequacy of potential sources. It is not a Request for Proposals or Quotes and imposes no obligation on the Government to acquire any goods or services. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government reserves the right to determine the appropriate acquisition approach based on the results of this market research. Responders should not anticipate feedback regarding their submissions. The Government will not pay for any costs incurred in responding to this Synopsis; all costs associated with responding are solely at the responding party's expense. The information provided herein is subject to change and is non-binding on the Government. The purpose of this notice is to conduct market research to identify potential and qualified sources, assess industry capabilities, and establish effective acquisition strategies, including potential small business set-aside opportunities. No reimbursement will be provided for any costs associated with submitting information in response to this announcement or any follow-up information requests. Overview The General Services Administration (GSA), Public Buildings Service (PBS), is conducting market research to establish Multiple-Award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts for comprehensive, multidisciplinary Architect-Engineer (A/E) services. These contracts are intended to provide integrated, sustainable, and adaptive design solutions across federally owned and leased real property nationwide. The Government anticipates awarding multiple contracts with multi-year ordering periods (5 year base with one 5 year option) to support GSA zones and client agencies across the United States and its territories. Expected typical project size is to be above the simplified acquisition threshold of $350,000. The potential place of performance for services rendered under this contract is on an as-needed basis for federal projects anywhere in the United States and its territories. This will require the capability to travel to GSA and other Government agency office locations nationwide. In some instances, performance of services is expected to require the capability for contractors to dispatch personnel to multiple locations simultaneously. The applicable North American Industry Classification System (NAICS) code for this requirement is 541310 (Architectural Services) & 541330 (Engineering Services), which has a small business size standard of $12.5 million and $25.5 million respectively. Scope of Services Services provided under the resulting IDIQ contracts will encompass a comprehensive range of professional A/E design and engineering disciplines. Scopes of work for individual task orders may include, but are not limited to, the following: 1. Core Project Life Cycle Services - These services cover the entire project lifecycle, from initial concept to post-construction closeout. Planning and Pre-Design Feasibility, pre-design, and project development studies Master planning Cost Estimating Real Estate Market Analysis Assessment and Investigation Existing conditions surveys, and field investigation Building condition survey evaluation reports (exterior and interior) Environmental investigation, reviews, inventories, and audits Energy audits and studies Design and Documentation Concept design, Design development, and Construction document development (both architectural and engineering) Interior design, including Furniture, Fixtures, and Equipment (FFE) Building standard documents Construction Support and Closeout Constructability review and evaluation Submittal and shop drawing review Management and inspection (M&I) services during construction and Construction inspection Building and system commissioning Post Construction Contract Services (PCCS); Record and close-out documents 2. Specialized Technical & System Design - Work requested often involves the assessment, repair, and upgrade of existing complex building systems. Mechanical, Electrical, and Plumbing (MEP) Full MEP services, including design of HVAC systems and electrical systems and lighting Assessment and design for mechanical components (e.g., pumps, fans, air handlers, water distribution systems) and air distribution Design of water and waste water systems, including performance of sanitary inspections Temperature control assessment and design and BAS system assessment and integration Building Structure and Envelope Structural evaluation and design Façade evaluation and remediation design Water infiltration investigation and mitigation design Safety, Security, and Compliance Fire and Life Safety evaluation and design Rehabs to improve energy efficiency and safety concerns Seismic & Blast protection and Vertical Transportation Code Compliance 3. Required AE Disciplines and Expertise - AE firms will need staff with licensed and/or specialized expertise in the following disciplines: Core Architectural and Engineering Disciplines Architecture and Interior Architecture Mechanical Engineering, Electrical Engineering, Structural & Civil Engineering, and Plumbing Historic Preservation Specialized Expertise A Qualified/Licensed Fire Protection Engineer (NCEES)* Security Space Planning & Workplace Cost Estimating and Scheduling Environmental Services Modernization and Quality Control Building Information Modeling (BIM) Quality control review and Report writing Submission Requirements Interested firms are invited to submit a written Capability Statement. Submissions must not exceed five (5) pages in length and must address the following elements: A. Company Profile Official company name, street address, telephone number, and primary website URL. Unique Entity Identifier (UEI) and Commercial and Government Entity (CAGE) Code. Office location(s) and primary design production facilities. Business size status under NAICS 541310 or 541330 (Large Business or Small Business). Applicable SBA socio-economic certifications (e.g., 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business [SDVOSB], Woman-Owned Small Business [WOSB], or Economically Disadvantaged WOSB [EDWOSB]). B. Relevant Experience Summarize three to five (3–5) relevant projects completed within the past ten (10) years. Demonstrate experience in projects of similar scale, scope, and complexity, such as federal workplace design, major repairs and alterations, or complex building systems. Include project title, customer/agency point of contact, contract value, role (Prime or Subcontractor), and a brief narrative of the work performed. C. Nationwide Capacity Demonstrate organizational capacity to manage and execute multiple task orders simultaneously across diverse geographic locations nationwide. Describe key disciplines maintained in-house versus those typically fulfilled through subcontractor or joint venture arrangements. Submission Instructions Responses must be submitted electronically via email to the primary procurement contacts listed below: Submission Deadline: Primary Contact: Point of Contact Email: Subject Line Format: Sources Sought Response - National A/E IDIQ - [Firm Name] Hard copies, telephonic inquiries, and late submissions will not be reviewed or acknowledged. All information provided in response to this notice will be used strictly for market research and acquisition planning purposes. This notice encourages participation from qualified small business concerns, including socio-economic program participants, to assist GSA in evaluating the feasibility of small business set-asides for this procurement. All prospective offerors are responsible for monitoring SAM.gov for updates, future notices, or potential solicitations related to this requirement.
-Market Research11/13/2026
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis11/16/2026

Additional Details

Solicitation Number

RFQ-IL-13-00016

Archive Date

Sep 30, 2013