Notice ID: c2fabe97c98c926985eb25783fa173b5Solicitation
Propane Fueling Station
Archived on January 1, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 8:00 PM UTC+01:00
- Posted
- December 22, 2015
- Notice type
- Solicitation
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Notice details
- Office
- FCI MILAN
- Place of performance
- Federal Correctional Institution 4004 E. Arkona Rd, Milan, 48160
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- RFQP04171600009
- Notice ID
- c2fabe97c98c926985eb25783fa173b5
Description
The Federal Bureau of Prisons - Federal Correctional Institution Milan, Michigan, is issuing solicitation for RFQP04171600009, PROPANE FUELING STATION, PROJECT 4B1G. The solicitation is a 100% set-aside for SMALL BUSINESS. The NAICS code is 238910. Work will be performed at the Federal Correctional Institution, 4004 E. Arkona Rd, P.O. Box 9999, Milan, MI 48160. The contract type is a firm fixed price. The Government will award to the responsible offeror(s) whose offer, conforming to the solicitation, that are considered to be most advantageous to the Government based on best value. Best value will be determined by evaluating each quotation for one or more of the following: past performance, price comparison with other offers, and administrative costs. Price will be rated higher than past performance. The Government reserves the right to make single or multiple awards. The solicitation will be made available on or about December 21, 2015 and will be posted to the General Services Administration Federal Business Opportunities website: http://www.fedbizopps.gov. All future information about this acquisition, including solicitation amendments, will also be distributed through this site. Interested parties are responsible for monitoring this site to ensure they have the most up-to-date information about this solicitation. The deadline for receipt of quotes is January 08, 2016, 2:00 p.m. Eastern Standard Time. Quotes received after closing date will not be considered. Payment will be made using Electronic Funds Transfer (EFT). All potential offerors are required to complete the annual representations and certifications electronically via the On-Line Representations and Certifications Application (ORCA), which should be completed at http://orca.bpn.gov. All offerors are required to have an active registration with the System for Award Management (SAM). Faith-Based and Community Based Organizations have the right to submit offers/bids equally with other organizations for contracts for which they are eligible. The point of contact for all information regarding this solicitation is Robert Armstrong, Supervisory Contract Specialist at (734) 439-4771 at the address listed above. Completed offers may be emailed to Robert Armstrong at rlarmstrong@bop.gov or mailed to the address above. The anticipated award date is January 15, 2015.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Select documents to download
Showing 5 of 5 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | Dec 22, 2015 | - | |||
| Solicitation | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | Dec 22, 2015 | - | |||
ncicform.rtf | Solicitation | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | Dec 22, 2015 | - | ||
| Solicitation | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | Dec 22, 2015 | - | |||
| Solicitation | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | Dec 22, 2015 | - |
Lifecycle
Solicitation:
RFQP04171600009- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationDec 17, 2015
Propane Fueling Station
- SolicitationCurrentDec 22, 2015
Propane Fueling Station
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled. | 54% | Solicitation | 07/27/2026 |
Update 27 Aug 2026: This update is to post the 27 Aug 2026 Bid Abstract results. These are initial results only pending review for bid mistakes and verification of bid responsiveness. No award will be made until all solicitation requirements are confirmed. Update 20 Aug 2026: Responses to RFIs posted. See Questions and Answers in attachments. Amendment 0001: Updated project Statement of Work (SOW) and Site Map/Drawings to remove reference of a single cantilevered gate. It has been determined that the length of the required gate to too long for a single cantilevered gate and a double gate is required. See updated Section 1.2.A.II of SOW. The SOW is also updated to include language that the Government will level the berm to the south of the gate at the request of the contractor. See IFB amendment 0001 and updated documents for further details. The bid due date is not extended. ***REMINDER TO BIDDERS. ALL SOLICITATION AMENDMENTS MUST BE ACKNOWLEDGED ON THE SF1442 WHEN SUBMITTING A BID. FAILURE TO ACKNOWLEDGE AN AMENDMENT MAY RESULT IN REJECTION OF THE BID***The work shall be in strict compliance with this Statement of Work, the project specifications, and the project drawings. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary for the relocation of a perimeter fence section. Work includes the removal of existing fire station perimeter fence, the demolition of the noise barrier wall, and the installation of new chain-link fence and sliding gate. The work shall be performed to the standards outlined in the contract. REMINDER: Acknowledge all amendments in your Bid Package. SITE VISIT: A site visit for this project is scheduled for the date and time stated in the solicitation. Access to Battle Creek ANGB is through the Main Entrance at 1701 Hill Brady Rd, Battle Creek, MI 49037. Attendees will be escorted from the Main Entrance to the site visit location. See solicitation for details. | 49% | Solicitation | 08/27/2026 |
FL-J N DING DARLING NWR-DEBRIS REMOVAL | 42% | Solicitation | 11/20/2026 |
Amendment One is posted to extend the due date to December 2nd, 2026 at 12:00PM. The government will post an amendment with the questions and answers received shortly. ______________________________________________________________________ (i) This Request for Quote (RFQ) for construction work located at the Stewart Lee Udall Building, HQ for the Department of the Interior, 1849 C Street, NW, Washington DC 20240. (ii) This requirement is a total small business set-aside under North American Industry Classification System (NAICS) Code 238910 Site Preparation Contractors with a business size standard of $19 million. Federal Supply Code (FSC) Z2AA Repair or Alteration of Office Buildings. This solicitation is issued under Revolutionary FAR Overhaul (RFO) Part 12, Acquisition of Commercial Products and Commercial Services. (iii) This is a combined synopsis/solicitation. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. The Government will award a firm fixed price contract from this solicitation to the responsible vendor whose quote, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. The Government intends to evaluate all timely quotes received from eligible vendors on a lowest price technically acceptable (LPTA) basis. The Government intends to evaluate quotations and award a contract without discussions with quoters. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Point of Contact: The Contracting Officer shall serve as the focal point for inquiries from actual or prospective offerors. Address any questions or concerns to Contracting Officer, Nicholas Lesicki; nicholas_lewicki@ibc.doi.gov and contract specialist Haider Al Azzawi; halazzawi@ibc.doi.gov. All inquiries must be written, no phone inquiries will be answered. Questions are due by 12:00 p.m. EST on November 10, 2026. Late questions may not be answered. Quotes are due November 19, 2026, at 2:00 PM Eastern Standard Time (EST). Quotes shall be submitted to Contracting Officer, Nicholas Lewicki; nicholas_lewicki@ibc.doi.gov and contract specialist Haider Al Azzawi; halazzawi@ibc.doi.gov. A site-visit is scheduled for interested vendors on Friday November 6, 2026 at 11:00AM and Monday, November 9, 2026 at 2:00PM. Vendors attending the site-visit must send an email to nicholas_lewicki@ibc.doi.gov and halazzawi@ibc.doi.gov indicating their business, name of person(s), phone number and email address of the representative(s) attending the site-visit. All visitors must have a valid REAL ID to enter the building. The address for the site visit is 1849 C Street NW, Washington, DC, 20240, using the C Street entrance. Please wait at the security desk for a representative to get you. | 42% | Combined Synopsis | 12/02/2026 |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | 42% | Combined Synopsis | 11/23/2026 |
Additional Details
Solicitation Number
RFQP04171600009
Archive Date
Jan 1, 2022