GovChime
Notice ID: 362da3fa9eb0400d98eeb282b9ea8cf7Sources SoughtArchived

W15QKN-25-X-1AXG- Storage, Handling, and Transportation for 155mm Artillery Components

Archived on December 24, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EST
Posted
November 24, 2025
Notice type
Sources Sought
Set-aside
No Set aside used
NAICS
NAICS 493 Warehousing and Storage (reported as 493000)
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA
Place of performance
Arizona
Last updated
Nov 5, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W15QKN-25-X-1AXG
Notice ID
362da3fa9eb0400d98eeb282b9ea8cf7

Description

On behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS), the United States Army Contracting Command – New Jersey (ACC-NJ), located at Picatinny Arsenal, NJ 07806-5000, is conducting market survey to identify qualified sources capable of providing sufficient storage facilities, material handling, maintenance, inspections, and transportation of the materials to and from Yuma Proving Ground.  This effort would be in support of the 155mm artillery programs, such as the Modular Artillery Charge System (MACS) program as well as potential future artillery propulsion modernization efforts.  The requirements at this time are planned to be restricted to State of Arizona, Arizona Department of Emergency and Military Affairs (AZDEMA), on behalf of Camp Navajo.

To be considered as a capable source for this future effort, all interested parties must submit the requested information as follows:

(a) Provide a detailed description of storage facilities, capacity, and material handling abilities consistent with Department of Defense (DOD) and Department of Army (DA) regulations governing the security; handling, transportation, and storage of hazardous materials and ammunition to include inert projectiles, inert projectiles with live basebleed/rocket assembly and ammunition with hazard classification of 1.1 through 1.4.

(b) Provide description of personnel and evidence that personnel are appropriately trained and certified to handle hazardous materials, as well as ability to respond to transportation requests, both incoming or outgoing, within two weeks.

(c) Provide evidence of Quality Assurance suitable to support this effort.

(d) Provide evidence of an Explosive Safety Site Plan and applicable Environmental Assessments required for hazardous material storage.

(e) Provide business name, address, distance from Yuma Proving Ground in Yuma, Arizona, point of contact, telephone, email, and size of business.

NOTE: All Contractors interested in the potential future solicitation must be registered in the System for Award Management (SAM.gov).  Also, the Government will not consider marketing brochures adequate information in response to this notice and reserves the right to reject, in whole or in part, any private sector input as a result of this market survey.  Please identify any proprietary information submitted. Proprietary responses will be protected in accordance with documentation markings. 

This is a market survey for planning purposes only and shall not be construed as a Request for Proposal (RFP) or as an obligation on the part of the Government.  The Government does not intend to award a contract on the basis of this market survey or otherwise pay for information solicited.  Also, the Government will not pay for the information submitted or for any costs associated with providing this information.  Participation in this effort is strictly voluntary and at no cost to the USG.

All submissions are requested to be made within fifteen (15) calendar days from the date of posting this notice.  The requested information shall be submitted electronically to: Contract Specialist, Mr. Yery Ysabel at yery.j.ysabel.civ@army.mil and Procuring Contracting Officer (PCO), Ms. Aja Barnett at aja.m.barnett2.civ@army.mil.  TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.

NOTE: The Government will ONLY accept written questions sent via EMAIL to the Contract Specialist and Contracting Officer stated above.  If a formal solicitation is generated at a later date, a solicitation notice will be published.

All information provided will not be returned and will be held as contractor confidential information.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    W15QKN-25-X-1AXG- Storage, Handling, and Transportation for 155mm Artillery Components

    Notice 362da3fa9eb0400d98eeb282b9ea8cf7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0010 - The purpose Amendment 0010 is to incorporate the updated questions and answers attachment and to formally revise the Prototype Project Opportunity Notice (PPON) Volume IV row of the Section 3.2.1 table. Specifically, this amendment:1. Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 35 Updated MACE Offeror Questions Addressed (Dated 11-12), incorporating Questions #32 and #33. Please note Attachment 35 has been uploaded as a Controlled attachment. PPON Document MACE Extended November 30 W15QKN-26-R-1C5R (Dated 11-12), revised to incorporate the updated attachment list in Section 11 and Volume IV row of Section 3.2.1 table. 2. Establishes Proposal Submission Boundaries: This correction ensures that the SOW Section 6.0 Milestone Table remains strictly in Volume III (Cost/Price) as a priced document, while the Section 889 Certification is properly submitted within Volume IV (Miscellaneous Agreement Documentation).Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 12, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes..***********************************************************************************************************************************End of Narrative 0010************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0009 - The purpose of this Amendment 0009 is to incorporate the updated questions and answers attachment, formally revise the proposal submission portal instructions in the Prototype Project Opportunity Notice (PPON) and to add Attachment 34. Specifically, this amendment: Formally Incorporates Updated Attachments and a new attachment: The following attachments are incorporated into the solicitation and replace all previous versions: Attachment 33 Updated MACE Questions Addressed (Dated 11-5), incorporating Questions #24 through #31 (including key clarifications regarding propellant GFE, NRE milestone formatting, and payload canister compatibility). Please note Attachment 33 has been uploaded as Controlled attachment. Attachment 34 12961016 Rotating Cover Band has been uploaded as Controlled attachment in response to question #28. PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 11-5) has been revised to incorporate the updated attachment list in Section 11. Amends the PPON Submission instructions: The PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated11-5) has been revised in Section 3.1.13 to formally correct the submission portal from SAM.gov to Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module: Revised Text: 3.1.13 All proposal submissions shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (https://piee.eb.mil) .The direct solicitation link may be accessed via the active solicitation notice on SAM.gov. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 5, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. **************************************************************************************************************************************End of Narrative 0009************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0008 - The purpose of this Amendment 0008 is to incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 30 Updated MACE Offeror Questions Addressed (Dated 10-29), incorporating Questions #20 through #23.Attachment 31 Updated MACE CLIN Matrix (Dated 10-29), to clarify that the due dates for CLINs 0001A and 0014A represent the initiation of NRE activities, and that payment may be earned across interim milestones per Question #23.Attachment 32 Updated Statement of Work (SOW) (Dated 10-29), removing the administrative reference to Attachment B in SOW Section 8.0 per Question #21.Amends the PPON Text: The Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 10-29) has been revised in Section 3.3.3 (Volume III, Cost/Price) to add the following language to the third paragraph: to include the interim milestone allocations for Non-Recurring Engineering (NRE) under CLIN 0001A and CLIN 0014A. The attachment list has been updated to incorporate the revised attachments. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes.*******************************************************************************************************************************************************************************************************************************************End of Narrative 008 ******************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0007 - The purpose of this Amendment 0007 is to extend the solicitation response deadline, incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Extends the Proposal Submission Deadline: The solicitation response deadline is extended from October 30, 2026, to 1500 EST on November 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals that deliver the best value to the Government. As a result, the Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN26R1C5R Dated 10-27) has been revised to reflect the new response deadline and the updated attachments list. Incorporates Updated Attachments: The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 27 Updated MACE Offeror Questions Addressed (Dated 10-26), incorporating Questions #17 through #19.Attachment 28 Updated Statement of Work (SOW) (Dated 10-26), reflecting the revised anticipated award date of March 29, 2027, while maintaining relative milestone durations. Attachment 29 Updated MACE CLIN Matrix (Dated 10-26), incorporating dedicated Non-Recurring Engineering (NRE) line items pursuant to Question #17. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. ************************************End of Narrative 0007 ******************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0006 - The purpose of amendment 0006 is to update the Question and Answer document from Attachment 23 - Updated MACE Offeror Questions Addressed 10-5 to Attachment 26 - Updated MACE Offeror Questions Addressed 10-15. This amendment also updates the PPON (PPON MACE Extended Updated Attachments (Updated 10-15)) to add Attachment 26 to the attachment list.*********************End of Amendment 0006************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0005 - The purpose of this Amendment 0005 is to resolve the schedule discrepancies identified in the solicitation and provide the definitive baseline for all proposal submissions. Specifically, this amendment: The Government acknowledges the discrepancy between the delivery dates specified in the original Statement of Work (SOW) (Attachment 7) and the performance periods specified in the original MACE CLIN Matrix (Attachment 4), which was caused by the proposal submission extension in Amendment 0001. This Amendment 0005 provides a revised and corrected Statement of Work (SOW) and CLIN Matrix. All schedule milestones have been aligned to relative durations (Months After Agreement Award) to ensure a stable, executable performance period. Amendment 0005 also adds the Updated MACE Questions Addressed plus an updated PPON which lists the amended attachments. The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 25 Updated Statement of Work (SOW) (Dated 10-6) Attachment 24 Updated MACE CLIN Matrix (Dated 10 6) Attachment 23 Updated MACE Questions Addressed (Dated 10-5) PPON Document MACE Extended Updated Attachments W15QKN 26R1C5R (Dated 10-6) All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents (updated attachments October 5 and 6, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. *********************End of Amendment 0005************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0004 - The purpose of amendment 0004 is to update the Question and Answer document from Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 to Attachment 16 - Updated MACE Offeror Questions Addressed 9-24. Amendment 0004 also serves as notification that 6 additional TDP documents have been uploaded to SAM.gov. Vendors who have already been approved for the TDP can access the documents immediately, and those not previously approved may request access through SAM. **********************************************End of Amendment 0004************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0003 - The purpose of this amendment 0003 is to add Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 **************End of Amendment 0003************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0002 - The purpose of this amendment 0002 is to add Attachment 15 - MACE Offeror Questions Addressed. *********************End of Amendment 0002 Narrative **************************************************************************************************************************************************************************************************************************************************************************************************************************** Amendment 0001 - The purpose of this amendment 0001 is to extend the solicitation response deadline from September 30, 2026 to October 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals which deliver the best value to the Government. As a result of the extension, the Prototype Project Opportunity Notice (PPON) has been revised to reflect the new response deadline. Attachment 1 - Terms and Conditions has been updated in Supplement 5, Sub Section number 2 Outside Funding Contribution Schedule to change the Basic Agreement Years from FY 2026, FY 2027, FY 2028 to FY 2027, FY 2028, FY 2029. ****End of Amendment 0001 Narrative****************************************************************************************************************************** 155mm Modular Artillery for Combat Effectiveness (MACE) - Please refer to Prototype Project Opportunity Notice (PPON) and attachments. Please note: Attachment 8 - Purchase Description and Attachment 9 - Packing and Unitization Drawings will be provided to Offerors upon request once the Offeror signs, completes and submits the following documents for contracting approval: Attachment 12 Technical Data Request Questionnaire; Attachment 6 Non-Disclosure and Non US Agreement plus Attachment 14 DD2345 Military Critical Technical Data Agreement. Please refer to section 8 of the PPON for further information.
42%
Solicitation11/30/2026
The U.S. Army Contracting Command – Rock Island at Picatinny (ACC-RI-PICA), Picatinny Arsenal, New Jersey 07806-5000, on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS), intends to issue competitive Request for Proposal (RFP) for the manufacture, Load, Assemble, and Pack (LAP), and final delivery of the 155MM M231 and M232 TYPE Modular Artillery Charge System (MACS) Propelling Charges. The MACS M231/M232 Type LAP meets the U.S. Army’s requirements for 155mm artillery propelling charges that are critical for and compatible with all existing 155mm artillery weapons systems and compliant with the Joint Ballistic memorandum of understanding. The 155mm M231/M232 MACS provides U.S. field artillery with a less-sensitive improved solid propelling charge system for use with current and future 155mm howitzer systems. The MACS is an evolution of the XM230 Unicharge, which was developed as a replacement for the family of four separate bag charges for the 155mm cannon artillery systems. The Unicharge was intended to be a single increment universal charge module that would provide needed zoning solutions for both 39-caliber and Extended Range Ordnance Assembly cannons by building up the charge. The MACS is currently a two-charge propellant system that offers improvement in operational flexibility, performance, logistic support, and cost when compared to the previous generation of bag propelling charges. The MACS LAP consists of two types of propelling charges, the M231 and the M232 TYPE, and all associated packaging. It uses a "build-a-charge," incremental-based system; the M231 is used singularly or in pairs for Low Zones (1 & 2) and the M232-Series is used in groups of 3, 4 or 5 charges for High Zones (3, 4 & 5). The system is compatible with all current 155mm field artillery weapons. The total maximum contract value will be $2,586,684,823.02, to include all contract awards, to procure up to an estimated 3,544,182 M231 and an estimated 15,000,000 M232 TYPE propelling charges. Contractors must be registered in the System for Award Management (SAM) database by accessing the SAM web site at http://www.sam.gov to be eligible for contract award and all correspondence must be in English. Estimated time for release of the solicitation is Quarter 2, FY27 (Q2FY27). However, if any interested sources intend to review, respond, and/or submit a response to the formal Solicitation; a DRAFT Solicitation is readily available to be provided via DOD SAFE, upon request. The MACS LAP of the 155mm M231 and the M232 TYPE Propelling Charges will be in accordance with Government Technical Data Packages (TDPs). The TDPs are coded as Distribution Statement D (Further Distribution authorized to the Department of War (DoW) and U.S. DoD contractors only. Other requests for this document must be referred to the controlling DoW office: PM CAS) and will be made available once the Solicitation has been released for this effort. A completed Military Critical Technical Data Agreement (AMSTA-AR Form 1350), and a completed Non-Disclosure Agreement (NDA) will be required prior to consideration to receiving the TDP. The POCs for any questions, DRAFT Solicitation, or the TDP request, this notification, and any requests/questions may be directed to Ms. Arian Sommers, at arian.r.sommers.civ@army.mil and Ms. Jennifer Hughes, at jennifer.m.hughes56.civ@army.mil. Telephone inquiries will not be accepted.
40%
Combined Synopsis02/15/2027
Base Bleed Stand Alone OTA - Please refer to attachments.
36%
Solicitation04/30/2026
The purpose of this notice is to post the Redacted Justification & Approval (J&A) for the MACS M231/M232-series Combustible Case Assemblies under authority FAR 6.302-1, Only One Reasponsible Source.
46%
Sole Source / J&AOpen
The U.S. Army Contracting Command-New Jersey (ACC-NJ) on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS) both located at Picatinny Arsenal, New Jersey awarded a Sole Source, Firm Fixed Price (FFP) modification for the manufacture, test, packaging, and delivery of 155mm M795 Metal Parts Assembly. The 155mm M795 Metal Part is made from a high fragmentation steel alloy (HF-1), has a finished weight of approximately 75 lbs., is a forged metal part approximately 30 inches long, and has a curved exterior. In addition, the M795 utilizes a welded rotating band that encircles the body close to the base. The M795 Metal Part is phosphated with both its internal cavity and exterior receiving a layer of paint. For storage and transport, a lifting plug is threaded into the nose cavity and a flexible cover is installed over the rotating band. The metal parts are palletized and provided to the Load Assemble Pack manufacturer for further processing. This modification was issued under the current contract W15QKN-19-D-0084 with General Dynamics OTS (Wilkes Barre), LLC, 1500 Highway 315 Blvd, Wilkes Barre, PA 18702-7005. This modification increased the contract ceiling by $15,000,000.00 from $$891,165,000.00 to $906,165,000.00. This modification was issued under the authority of 10 U.S.C.3204(c)(1); as implemented by FAR 6.302-1(a)(2)(ii)(B)-Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. This modification is to ensure adequate property management and production support of the Scranton Army Ammunition Plant (SCAAP), a Government Owned, Contractor Operated facility as a result of increased production. Appropriate and available funds are available for this acquisition.
43%
AwardedArchived
Open

Additional Details

Solicitation Number

W15QKN-25-X-1AXG

Archive Date

Dec 24, 2025

Office Address

PICATINNY ARSENAL, NJ, 07806-5000