GovChime
Notice ID: 3d1177c3926c4097b9123f86576d7429SolicitationArchived

Rubberized Roof Sealant Removal and Replacement, Fort Devens

Archived on July 23, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EDT
Posted
July 7, 2026
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
238160: Roofing Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA
Place of performance
Massachusetts, 01434
PSC
Z2AZ: REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W15QKN26QA132
Notice ID
3d1177c3926c4097b9123f86576d7429

Description

Amendment 0002:

The purpose of this amendment is to answer vendors' questions.

Amendment 0001:

The purpose of this amendment is to extend the response due date from 12PM EST 2 July 2026 to 4PM EST 8 July 2026 and answer vendors' questions.

ItemCritical Project ParameterDetail / RequirementProject NameRubberized Roof Sealant Removal and ReplacementBuilding 3574, Devens Reserve Forces Training Area (RFTA), Devens, MASolicitation No.W15QKN26QA132Request for Proposal (RFP)Contract TypeFirm-Fixed-Price (FFP)Single-award commercial construction services contract.Set-Aside Status100% Service-Disabled Veteran-Owned Small Business (SDVOSB)NAICS: 238160 (Roofing Contractors) | Size Standard: $19.0MBonding / SecurityWaivedPre-award bid guarantees, post-award performance and payment bonds (SF 25/SF 25A), and alternative payment protections are not required.Period of Performance20 Working DaysThe performance period begins after the issuance of the Notice to Proceed (NTP).Mandatory Labor RatesDavis-Bacon Act Prevailing WagesMiddlesex County Wage Determination MA20260001 (issued May 18, 2026).Questions DeadlineJune 30, 2026, at 12:00 PM ESTSubmitted in writing via email to the Contract Specialist and Contracting Officer.Proposal DeadlineJuly 02, 2026, at 12:00 PM EST100% Electronic Submission via Email to the Contract Specialist.Primary Contact (CS)Nelia Shyshak, Contract Specialistnelia.shyshak.civ@army.mil

Summary of What the Contractor Shall Provide

To be deemed technically acceptable and responsive, the successful contractor must deliver the physical services and technical deliverables detailed below:

  • Physical Construction & Specialty Trade Services:

    • Sealant Removal: Complete removal of the existing failed under-eave rubberized sealant on Building 3574.

    • Surface Preparation: Prepare the exposed surface to ensure it is completely dry, clean, and free of residues. The Government reserves the right to inspect the surface prior to new installation.

    • Sealant Installation: Provide and install new commercial-grade sealant, ensuring uniform application over the designated 270 to 300 square foot under-eave perimeter.

    • General Scope: The Contractor shall provide all plant, labor, equipment (including scissor lift), tools, materials, supervision, and transportation necessary to accomplish the work.

  • Mandatory Technical Submittals & Deliverables (Within 10 business days of NTP):

    • Rubberized Roof Sealant Replacement Plan

    • Warranty Management Plan

    • Manufacturer's Instructions

    • Operations and Maintenance Data

  • Completed Cost Breakdown Form (Attachment 0003): An itemized breakdown specifying direct labor (compliant with the specified Wage Determination), materials/equipment, and a separate calculation for Overhead/G&A and Profit.

Mandatory Site Visit & Access

Prospective offerors are highly encouraged to inspect the site. Failure to do so will not constitute grounds for a claim after award.

  • Site Visit Schedule:

    • Primary Site Visit: Tuesday, June 25, 2026, at 9:00 AM EST

    • Secondary Site Visit: Wednesday, June 26, 2026, at 9:00 AM EST

    • Site Visit Address: Building 3574, Devens RFTA, Main Cantonment Area, Devens, MA 01434.

  • Access Pass Security (Mandatory 48-Hour Advance Notice):
    Attendees must submit the "Devens Visitors Pass" request form at least forty-eight (48) hours prior to the scheduled site visit date and time.

    • Zygmunt Osiecki, DPW Director | Email: zygmunt.v.osiecki.civ@army.mil | Phone: (978) 615-6104

Post-Award Contract Execution Sequence

Contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP).

  1. Contract Award: The Government executes and issues the FFP contract in the Army Contract Writing System (ACWS).

  2. Notice to Proceed (NTP) Issuance: Upon contract execution, the Contracting Officer issues the formal NTP, which officially starts the 20-working-day Period of Performance (PoP) clock.

  3. Required Submittals: Within ten (10) business days following NTP, the Contractor shall submit all required technical documents for Government review and approval.

  4. Pre-Construction Conference: After NTP issuance but prior to starting work, a conference will be held to review base access and safety.

  5. Onsite Work Commencement: The Contractor may begin physical onsite work only after submittals are approved and the pre-construction conference is complete.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (8)

  • Solicitation Amendment W15QKN26QA1320002 SF 30.pdf

    3.8 MBAdded in Solicitation version 7Posted
    Download
  • Solicitation Amendment W15QKN26QA1320001 SF 30.pdf

    3.8 MBAdded in Solicitation version 5Posted
    Download
  • Davis-Bacon Act WD MA20260001 d. 5.18.2026.pdf

    5.4 MBAdded in Solicitation version 4Posted
    Download
  • Solicitation - W15QKN26QA132 Professional Appearance.pdf

    6.2 MBAdded in Solicitation version 4Posted
    Download
  • Devens_Visitors_Pass_Request.pdf

    527 KBAdded in Solicitation version 4Posted
    Download
  • BLDG 3574 Rubberized Roof Sealant Replacement 17 June 2026.pdf

    237 KBAdded in Solicitation version 4Posted
    Download
  • ATTACHMENT 0003 - CONTRACTOR PRICE BREAKDOWN FORM.xlsx

    16 KBAdded in Solicitation version 4Posted
    Download
  • BLDG 3574 Rubberized Roof Sealant Replacement 1 May 2026.pdf

    443 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchived

    Rubberized Roof Sealant Removal and Replacement, Fort Devens

    Notice fc2b0d54cab3483f9f91d3a4236185d2 on SAM.gov

  2. 4
    Version 4SolicitationArchived

    Type changed from Sources Sought to Solicitation

    Rubberized Roof Sealant Removal and Replacement, Fort Devens

    Notice 436a0606c3634a2db157e0f78ebb9ddf on SAM.gov

  3. 5
    Version 5SolicitationArchived

    Rubberized Roof Sealant Removal and Replacement, Fort Devens

    Notice 6e2f54581a484696b895bae6b118314d on SAM.gov

  4. 7
    Version 7SolicitationArchivedCurrent

    Rubberized Roof Sealant Removal and Replacement, Fort Devens

    Notice 3d1177c3926c4097b9123f86576d7429 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W15QKN26QA132

Archive Date

Jul 23, 2026

Office Address

PICATINNY ARSENAL, NJ, 07806-5000