GovChime
Notice ID: e07ce1bdbcbb4c9caac4d3f0a8b9a50eCombined Synopsis/SolicitationArchived

HVAC Repair by Replacement - 147th MSG

Archived on October 9, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CDT
Posted
September 23, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
NATIONAL GUARD BUREAU.JFHQ USPFO TX.USPFO TX PROCUREMENT.W7N2 USPFO ACTIVITY TXANG 147
Place of performance
Houston, Texas, 77034
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W50S7726Q1CKX
Notice ID
e07ce1bdbcbb4c9caac4d3f0a8b9a50e

Description

Amendment 00001

  1. Is temporary cooling required? There will be a temporary chiller, coordination when this needs to be removed for the permanent will need to be coordinated with CE.

  1. Is new electrical conductors required from the disconnect to the new unit.? Contractor to see SOW section 3 and 5.

  1. Is flexible weather resistant conduit approved for any electrical work need to be performed for the chiller replacement?  All installs shall be per NEC and Local Code. The contractor shall submit the proposed raceway type and intended installation location for Government review before installation.

  1. Is a new wye strainer going to be required to prevent partials from the existing system from entering the new chiller? The contractor shall field verify whether a serviceable strainer is already installed upstream of the chiller and confirm the replacement chiller manufacturer’s filtration requirements.

  1. Is a new check valve going to be required at the new chiller? The contractor shall verify the existing piping arrangement and the manufacturer’s requirements for the dual VFD pump package.

A check valve shall be provided if required to:

  • Prevent reverse flow through the chiller
  • Protect the integral pump package
  • Prevent flow through an inactive chiller
  • Maintain proper system hydraulic operation
  • Comply with the manufacturer’s installation diagram

If a new check valve is necessary, the contractor shall submit the proposed valve type, size, location, pressure rating, and pressure-drop information for Government review and written authorization.

  1. Does the base have a designated controls contractor they are currently working with? TekPlan

  1. Is the chiller currently on a BAS system ? Yes

  1. Is the chiller currently running just off of local  controls? Yes, but will be integrated into the DDC system.

  1. Is there a certain percentage of glycol that needs to be blended into the system? The current system is not glycol. Before filling the new chiller, the contractor shall sample and test the existing chilled-water solution to determine whether glycol is present and document its existing concentration and condition. The contractor shall also review the replacement chiller manufacturer’s freeze-protection and water-quality requirements.

  1. Is the base going to assure that the chiller can isolated with having to drain the whole system? Contractor to field verify.

  1. If the base is going to require temporary cooling is there going to be chiller isolation valves added?  Yes, Temporary chilling will be required as stated, isolation valves will be contractor responsibility to meet the requirements.

1. Are Press fittings permitted: Press fittings are not permitted 

Please see attachments for changes. All changes were higlighted in Red.

This is a combined synopsis/solicitation for HVAC Repair by Replacement. Please see all attached documents.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • W5S077-26-Q-1CKX - 00001 HVAC Replacement.pdf

    250 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Attachment 3- QnA.docx

    17 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • W5S077-26-Q-1CKX - 00001 HVAC Replacement.pdf

    225 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Attachment 1 - Statement of Work.docx

    1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 2 - Wage Determination.txt

    11 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice c8219c4c074543efa79354344cea9d34 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice 860464b8dc9d414fbbdbc7764c1cf1ff on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice 91587043094649b4810bc8160e21303a on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice 696556c4681547729611ba04fdad98de on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice b2e9e0cf53384dd69fa4a20d92bae6a5 on SAM.gov

  6. 6
    Version 6Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice 37f508f6714d430aa21a11476d1da519 on SAM.gov

  7. 7
    Version 7Combined Synopsis/SolicitationArchived

    HVAC Repair by Replacement - 147th MSG

    Notice bde71d598f574bc199a69268dd6d0989 on SAM.gov

  8. 9
    Version 9Combined Synopsis/SolicitationArchivedCurrent

    HVAC Repair by Replacement - 147th MSG

    Notice e07ce1bdbcbb4c9caac4d3f0a8b9a50e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W50S7726Q1CKX

Archive Date

Oct 9, 2026

Office Address

HOUSTON, TX, 77034-5586