Notice ID: 3fb6ab9d098fe0f2a7fb6b21f3c52e04Justification and Approval (J&A)Awarded
SOLICITATION W911KF-16-Q-0009
Awarded on December 2, 2015. Full description on SAM.gov.
Overview
- Posted
- December 2, 2015
- Notice type
- Justification and Approval (J&A)
- NAICS
- 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W6QK ACC ANAD
- PSC
- 34: METALWORKING MACHINERY
- Last updated
- Jan 23, 2026
- Award date
- Dec 2, 2015
- Award amount (SAM.gov award notice)
- Not specified
Identifiers
- Solicitation number
- W911KF16Q0009
- Notice ID
- 3fb6ab9d098fe0f2a7fb6b21f3c52e04
Description
SOLICITATION FOR LASER ENGRAVER
Award Overview
Award Number
W911KF16P0002
Award Amount (SAM.gov award notice)
Not specified
Award Date
Dec 2, 2015
Awardee
Not specified
Original Solicitation
Notice ID: 3fb6ab9d098fe0f2a7fb6b21f3c52e04
Posted Date: Dec 2, 2015
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Select documents to download
Showing 2 of 2 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | DEPT OF THE ARMY | Dec 2, 2015 | - | |||
| Justification and Approval (J&A) | DEPT OF THE ARMY | Dec 2, 2015 | - |
Lifecycle
Solicitation:
W911KF16Q0009- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationNov 17, 2015
LASER ENGRAVING SYSTEMS
- SolicitationNov 19, 2015
SOLICITATION W911KF-16-Q-0009
- OtherCurrentDec 2, 2015
SOLICITATION W911KF-16-Q-0009
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
48% | Awarded | Open | |
The US Army Corps of Engineers, Walla Walla District is seeking sources to provide personnel, materials, supplies, equipment, transportation, supervision and other items and services for the following: Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation. This project involves pickup, blasting, weld inspection, weld repair (if needed), painting and delivery of twelve draft tube bulkheads.AM01 Corrects dates, updates the PWS, and adds the list of GFP. | 48% | Special Notice | 10/30/2026 |
The US Army Corps of Engineers, Walla Walla District is seeking sources to provide personnel, materials, supplies, equipment, transportation, supervision and other items and services for the following: Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation. This project involves pickup, blasting, weld inspection, weld repair (if needed), painting and delivery of twelve draft tube bulkheads. | 48% | Solicitation | 10/30/2026 |
1.0 Disclaimer This Request for Information (RFI) is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the U.S. Government (USG) to contract for any supply or service whatsoever. Furthermore, the USG will not accept unsolicited proposals in response to this RFI. Responders are advised that the USG will not pay for any information or administrative costs incurred in response to this RFI. All costs associated with responding to this RFI will be solely at the interested party’s expense. The information gathered by this RFI will be shared with relevant interested USG parties to help inform future development and procurement efforts. 2.0 Background The Joint Product Manager for CBRN Layered Effects is responsible for enabling and enhancing the survivability of our Joint Warfighters so they can fight and win across all domains in a CBRN-contested environment. As the acquisition leader in mobile analytics, our portfolio provides transformative solutions – including advanced reconnaissance systems, sensors, and mobile analytical laboratories – that ensure our military is safeguarded against chemical, biological, radiological, and nuclear threats. To support this mission, the USG is pursuing the Screening Obscuration Module - Multispectral (SOM-M) program, which is envisioned as a modular, man-portable, ground-emplaced obscuration and screening system designed to produce a multispectral obscurant cloud for both mounted and dismounted use. In support of the SOM-M program, the USG is issuing this Request for Information (RFI) to identify alternative, cost-effective commercial manufacturing options for critical, novel bispectral obscurant material. The technical requirements for this capability are detailed in Section 4.0 of this document. 3.0 Purpose The purpose of this RFI is to survey industry capabilities and identify alternative commercial manufacturing options for a novel bispectral obscurant material. Specifically, the USG seeks to identify manufacturers capable of performing high-volume Physical Vapor Deposition (PVD) of Silicon Dioxide (SiO2) onto Aluminum Flakes at a commercial scale, and to assess industry readiness to support a potential Army-funded manufacturing maturation project aimed at reducing sustainment costs. 4.0 Technical Requirements Interested parties must demonstrate capabilities or conceptual pathways to meet the following production and material requirements: Base Material & Size: Aluminum Flake sized at 2 – 4 microns. Coating Process & Material: Physical Vapor Deposition (PVD) of Silicon Dioxide (SiO2) onto the aluminum flakes. Target Production Volume: Scalable to large commercial quantities, ranging from hundreds of pounds (lbs) to tons. Cost Efficiency: Proposed alternative manufacturing options must significantly reduce current manufacturing protocol costs to ensure long-term sustainment capability for the military services. 5.0 Requested Information Interested parties are requested to respond to this RFI providing a white paper including technical insights on the manufacturing feasibility, cost-effectiveness, and scalability of the proposed Physical Vapor Deposition (PVD) process. Ideal responses will include the following elements: Manufacturing/Production Approach: A comprehensive overview of the proposed methodology to achieve the PVD coating of Silicon Dioxide (SiO2) on Aluminum Flakes (2 – 4 microns). This should include details on the facility scale, equipment, and proposed lead times based on the scale of material produced. Cost Projections & Scale: Estimated cost profiles and projected cost-reduction curves when scaling production from hundreds of pounds to tons, demonstrating how the approach achieves a sustainable cost profile for long term acquisition. Maturity, Capacity, & Risks: An assessment of current facility readiness, current and potential production capacity, and identified technical and manufacturing challenges or risk factors associated with scaling this specific PVD coating process. Company Information & Past Performance: A brief summary of relevant company experience, facility capabilities, or prior similar material coating efforts. 6.0 Submission Requirements All submissions must be electronic and adhere to the following formatting and content rules: Page Limit: All responses shall be no longer than five (5) pages. Formatting: Standard 8.5 x 11-inch pages, with font size no smaller than 10-point. Company Information: Include official company name, address, telephone number, website, and business type (large/small business classification), CAGE Code. Point of Contact: Provide the name, title, telephone number, and email address of the authorized company representative. 7.0 Submission Guidance Submission Deadline: Responses are requested no later than 5 PM EST Friday, 13 November 2026. Submissions and/or questions should be emailed directly to the following point of contact: Emily McGill, Contract Specialist, emily.c.mcgill.civ@army.mil Samantha Degele, Contracting Officer, samantha.l.degele.civ@army.mil | 48% | Market Research | 11/13/2026 |
Salient Characteristics: Thermion 71000-4.8 VS Feeder Assembly Part Description: 71000-4.8 VS Feeder Assembly 4.8 with VS Technology With Lubricating System Manufacturer: Thermion Associated System: Precision Arc 4.8 Twin Wire Arc Spray System 1. General Overview The Thermion 71000-4.8 VS Feeder Assembly is a core component of the Precision Arc 4.8 high-production twin wire metalizing system. It is specifically designed to feed large-diameter spray wires (such as zinc, aluminum, and zinc/aluminum alloys) smoothly and consistently in ultra-high production, industrial, and field environments. 2. Essential Physical and Design Characteristics ? Modular Construction: Features a in. plug-and-play in. factory-built design, allowing for quick, toolless connections. Each fitting is uniquely keyed to eliminate connection errors. ? Detachable and Portable: The feeder can be detached from its standard cart mount, making it suitable for use in highly confined spaces and small entrance areas(down to 24 inches). ? Heavy-Duty Components: Constructed with heavy-duty, high-temperature machine components designed to withstand harsh shop or field environments.? Ergonomics and Safety: Includes an exclusive ergonomic handle design to reduce operator fatigue and a non-latching trigger that acts as a dead-man switch for instant emergency shutdown. 3. Essential Functional and Performance Characteristics ? Wire Compatibility: Capable of running 3/16 in. (4.8 mm) diameter spray wires, yielding extremely high deposition rates (e.g., up to 190 lbs./hr. for Zinc). Change-over kits can adapt the system for other sizes like 1/8 in., 3/32 in., 2mm, or 1/16 in.. ? VS Technology (Arc Voltage Drive / Variable Speed): Utilizes automated wire feed control technology to automatically adjust wire feed speed, maintain a perfect arc, eliminate arc shorting, and prevent coating defects caused by sputtering. ? Lubricating System / Friction Reduction: Equipped with advanced, long-life wire drive assemblies featuring sealed roller bearings and roller bearing inlet guides. This low-friction mechanism mitigates drag on the wires as they enter the feeder, ensuring a smooth, non-slip feed without dry-friction binding. ?Integrated Wire Straighteners: Heavy-duty wire straighteners are built into the drive assembly. These self-adjusting mechanisms remove the helix or kinks from spooled wire, ensuring flawless delivery to the spray head. ? Remote Control Accessibility: Features remote amperage and voltage meters with integrated control mechanisms located directly at the feeder, allowing operators to make adjustments without returning to the main power supply. 4. System Compatibility and Operating Requirements ? Power Supply: Designed to integrate with a 650 Amp, 100% duty cycle power supply (such as the Thermion DIM-650). ? Control Box Compatibility: Pairs with Thermions modular control boxes (e.g.,71097-ASSY). ? Air Consumption: Requires 90-110 psi at 60 cfm (using a 1/2 in. IPS/NPT connection) for optimal atomization and functionality. | 48% | Combined Synopsis | 08/13/2026 |
Additional Details
Solicitation Number
W911KF16Q0009
Archive Date
Jun 8, 2016