Notice ID: a6539cbf844d4d449fdf70cb9b4bf66bSolicitation
Structure Demolition and Site Restoration at Allegheny River Lock and Dam #6
Archived on January 31, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM UTC−05:00
- Posted
- January 10, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST PITTSBURGH
- Place of performance
- Freeport, 16229
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W911WN24B8010
- Notice ID
- a6539cbf844d4d449fdf70cb9b4bf66b
Description
Allegheny River Lock and Dam #6 Structure Demolition and Site RestorationAllegheny River Lock and Dam #6, Freeport, PennsylvaniaThe United States Army Corps. of Engineers, Pittsburgh District is procuring the work required to demolish the current two dwellings, one shed, one well-house (concrete slab), and two fire hydrants, including foundations, underground tanks, vaults, underground utility supply lines (gas/water) back to street valves and connections to overhead utility lines (electric/phone) and utility poles. The structures include 2 dwellings (approximately 31 feet 10 inches wide by 26 feet 2 inches long by 34 feet 7 inches high), 1 shed (approximately 11 feet wide by 20 feet long by 14 feet high), and 1 well-house with a concrete slab (approximately 5 feet wide by 10 feet long). Once the structures are fully removed, site restoration includes backfilling with clean fill and grading the former structure locations. Hazardous Material testing came back positive for both lead and asbestos in both dwellings. The Contractor shall be responsible for handling and disposal of the hazardous materials in accordance with the Safety and Disposal requirement specified herein.The Contractor shall confine all operations at the work site between the hours of 7:30 AM and 4:00 PM, Monday through Friday, unless otherwise approved by the ACO. All tree removal and building demolition must be completed during the hibernation period for the ESA-listed bat species (October 1 ? March 31). All cleanup and other work may be completed outside of the hibernation period for the ESA-listed bat species. Work will not be permitted on weekends or Federal holidays unless otherwise approved. The Contractor shall complete all work within 450 calendar days after receipt of Notice to Proceed. After the demolition and final inspections have been completed, the contractor is to de-mobilize fully within 14 calendar days.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here? SAM Posting Note: The Invitation for Bid (IFB) package can be retrieved by selecting below the link named, ?PIEE Solicitation Module Link for W911WN24B8010?. 12-6-23: Amendment 0001 has been issued. 12-20-2023 Amendment 0002 has been issued. 12-28-2023 Amendment 0003 has been issued.12-29-23 Amendment 0004 has been issued. 1-10-2024: Bid opening held at 11:00AM ET, bid results posted.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W911WN24B8010- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationNov 16, 2023
Structure Demolition and Site Restoration at Allegheny River Lock and Dam #6
- 7×SolicitationCurrentDec 4, 2023
Structure Demolition and Site Restoration at Allegheny River Lock and Dam #6
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.) | 75% | Combined Synopsis | 06/15/2026 |
The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled. | 70% | Solicitation | 07/27/2026 |
Sources Sought Notice for the Demolition and Decommissioning of the General Leonard Wood Army Community Hospital (GLWACH) Contract. This requirement was previously published on SAM.gov as the seed project for the Dismantling, Demolition, and Removal of Improvements Multiple Award Task Order Contract (MATOC). The U.S. Army Corps of Engineers, Kansas City District intends to solicit and award a Design-Build (DB) contract for the demolition and decommissioning of the General Leonard Wood Army Community Hospital on Fort Leonard Wood, Missouri. The demolition of the former General Leonard Wood Army Community Hospital (GLWACH) consists of the complete removal of the following buildings: hospital and clinic (B310), Central Utility Plant (B311), and temporary Helipad. The building demolition will ensure that the connected Optical Fabrication Lab (B311) remains with limited to no degradation to operations. The Government proposes to issue a single firm fixed price type contract for this project. This Sources Sought notice is for market research and planning purposes only. This does not constitute a solicitation and shall not be construed as a commitment by the Government to award a contract from responses to this announcement, nor does it obligate the Government to produce a solicitation in the future. Any information submitted by interested parties is strictly voluntary and no monetary compensation will be provided for response preparation or follow-up requests. The purpose of this Sources Sought Notice is to gain knowledge of potential and interested qualified contractors capable of performing hazardous material abatement, building demolition, decommissioning services, and removal of improvements. This effort is classified through the North American Industry Classification System (NAICS) under 238910 Site Preparation Contractors. The small business size standard for NAICS 238910 is $19M. The magnitude of this project is more than $10,000,000.00. It is anticipated that a solicitation announcement will be published on SAM.gov in mid-2026. The following information is requested in this Sources Sought (SS) announcement: 1. Firm’s name, address, email address, website address, telephone number, and point of contact. 2. Firm’s CAGE Code and UEI number. 3. Company size (Small or Large), in accordance with the NAICS 238910. 4. If a Small Business, specify if your company is any of the following: Small Disadvantaged Business, Service-Disabled Veteran Owned Small Business (SDVOSB); Veteran Owned Small Business, HUBZone Small Business; 8(a) Small Business concern; or Women-Owned Small Business. 5. Firm’s interest in providing a proposal as the prime contractor on the pending solicitation once issued. 6. Experience: Evidence of capabilities to perform work comparable to that required for the project. 7. Provide a maximum of 3 recent (within the last 6 years) relevant/comparable projects and describe how they are similar to this project. Include the project name; when the project was completed; dollar value of the project; description of the key/salient features of the project, identify the contracting office & the customer/user (include POC information). Construction Bonding level per contract and aggregate construction bonding level, both expressed in dollars. A summary of the scope is below: Abatement of hazardous materials and environmental liabilities within GLWACH and other facilities to be demolished Demolition of GLWACH (472,600sf) and Primary Care Clinic structures, including foundations. Demolition of Central Utility Plant Demolition of Fuel Tanks Demolition of utilities, paving and other site appurtenances, within the boundaries identified. Demolition of communications infrastructure to various buildings that are currently served from GLWACH. Demolition of temporary Helipad. Construction of new exterior wall between Regional Optical Fabrication Lab and GLWACH. Construction of storm drainage and detention Backfill and establishment of turf following removal of building foundations. Decommissioning Statement The contractor shall remove all debris, and any other material not otherwise tagged for salvage or reuse on the project (examples are existing attic stock, old architectural drawings, spare parts & materials, files, etc.) 1. Decommission medical air, vacuum, and gas systems: a. Disconnect master medical gas alarm b. Disconnect zone medical gas alarms. c. Remove medical gas manifolds d. Remove medical air pumps e. Remove medical vacuum pump and tank f. Remove dental air pump g. Remove dental vacuum pumps and tank h. Purge and cap medical gas system throughout MTF. Cut and cap MED gas at main entry point, then purge lines at each valve and tag “NOT IN USE” i. Remove spit tank, filter, and dispose of contaminant off post. 2. Decommission medical low-voltage systems: a. Disable temperature monitoring system. b. Deactivate and remove pharmacy duress visible components. c. Deactivate and remove Infant Abduction System/HUGS systems and visible components. d. Remove all information technology (IT) switches. e. Deactivate and remove ceiling mounted Wi-Fi antennas and repeaters f. Deactivate and remove ceiling and external mounted cameras. 3. Decommission HVAC systems: a. Clean and cap laboratory & radiology vent hoods, dispose of filters, and remove hazardous signs. b. Disconnect all HVAC lines for refrigerant systems. c. Cut and cap chilled water (CHW) from central utility plant (CUP) d. Drain and purge HVAC CHW and reheat hot water (RHW) in CUP e. Drain and purge glycol from all HVAC systems. 4. Decommission wastewater systems and laboratory systems: a. Survey drains and P-traps in Dental and Laboratory for mercury contamination; remove all sink P-traps and remediate. b. Dental vacuum lines in dental clinic are contaminated for mercury, remove vacuum lines from dental clinic to storage tank. 5. Decommission Nutrition Care Division (NCD) and Sterile Processing Department (SPD): a. Cut and cap steam lines. 6. Decommission/Deactivate Fire Suppression Systems: a. Deactivate and secure range hood fire suppression systems in NCD kitchen. b. Deactivate the Data Center FM200 suppression systems; remove and dispose of storage tanks. c. Deactivate carbon dioxide extinguishing system in emergency generator room; remove and dispose of storage tanks. d. Dispose of the left-over fire extinguishers. 7. Decommission Hydraulic Elevators (2): a. Drain and purge hydraulic oil from elevators (2) from GLWACH. b. Contractor shall dispose of oil off post. 8. Decommission Two Diesel Fuel Tank (approximately 10,000 Gallons) located next to CUP in an exterior closure. a. Drain and purge diesel from tanks and lines going to generator and fire pump. b. Contractor shall take possession of fuel. The responses must be specific to the qualifications listed above to show that the respondent is qualified and possesses the necessary skills, experience, and capabilities. If a response does not clearly demonstrate that the respondent meets the qualifications, possesses the necessary skills, experience, and capability the response will not be considered as confirmed capability for the purposes of market research. Please send your Sources Sought responses via email to stephanie.r.kretzer@usace.army.mil and jeri.l.halterman@usace.army.mil. Submissions should be received by 10:00 a.m. Central Daylight Time (CDT), March 20, 2026. | 70% | Market Research | 03/20/2026 |
/// AMENDMENT 3:The purpose of this amendment is to add Attachment 5 Pre-Demolition Survey and add the following verbiage to PWS Paragraph 5.1: Attachment 5 Pre-Demolition Survey is the ACM conducted in 2011 which indicated possible Asbestos in the building. Two additional asbestos surveys were later conducted finding no record of asbestos in the building. Per Fort Drum environmental engineers, this meets NYS Code Rule 56 and no additional pre-demolition surveys are required. All other terms and conditions remain the same. END AMENDMENT 3. /// ///AMENDMENT 2: The purpose of this amendment is to post the Questions and Answers and extend the quote due date from 31 July 2026 to 07 August 2026 at 10:00 AM Eastern time. Attachment 1 Performance Work Statement is updated adding paragraphs 5.2.1.14 and 5.2.4. Attachment 3 500 Area Drawings is updated to include a slide showing the area required to be fenced. Attachment 4 Test Results is added providing the results of the environmental testing of the site. All other terms and conditions remain the same. END AMENDMENT 2///AMENDMENT 1: The purpose of this amendment is to add Attachment 3 500 Area Drawings. All other terms and conditions remain the same. END AMENDMENT 1/// Fort Drum, New York has a requirement for WWII Building Demolition. This requirement is set-aside 100% small business set aside under NAICS 238910 Site Preparation Contractors, size standard is $19 million. A site visit will be conducted on 23 July, 2026 at 1:00 PM Eastern time. The meeting place will be held in Conference Room 103, located at 4205 Po Valley Rd, Fort Drum, NY 13602. To access Fort Drum, contractors shall be restricted to physically sign in at Paul Cerjan Gate for entry, unless they have a Department of Defense (DoD) issued ID card, a local temporary pass, or a local access badge (LAB). For contractors who do not have access will need to visit the welcome center Bldg. 11008 outside of Paul Cerjan (Main) gate with a picture identification (must be Real ID compliant), registration, and proof of insurance to gain a one-day pass. The visitor center is open 5:30 a.m. to 10:00 p.m. seven days a week. Offerors MUST notify the Contracting Officer and Contract Specialist by email of intent to attend the site visit no later than 23 July, 2026 at 10:00 AM Eastern Time. Questions are due no later than 27 July, 2026, at 10:00 AM Eastern time. Quotes are due on 31 July, 2026 at 11:00 AM Eastern Time. The Offeror shall provide all information and requirements listed in Addendum to FAR 52.212-1 on page 22 of this solicitation. All quotes shall be submitted electronically via the PIEE Solicitation Module. Quoters shall nominate a Proposal Manager in the PIEE Solicitation Module. The Proposal Manager shall respond and post quotes to this solicitation in the PIEE Solicitation Module. For information and training on how to add the role to the quoter?s profile, the functions of the Proposal Manager, and how to post an offer/bid/quote, go to https://piee.eb.mil/. Log on to PIEE; select Help; select New User Information and Help; select Web Base Training. | 69% | Solicitation | 08/07/2026 |
66% | Awarded | Open |
Additional Details
Solicitation Number
W911WN24B8010
Archive Date
Jan 31, 2024
Office Address
PITTSBURGH, PA, 15222-4198