Notice ID: 5db57034206dbd5bed9f5914721d1146Award NoticeAwarded
Replace Flight Line Aviation POL Yard
Awarded on September 30, 2019. Full description on SAM.gov.
Awarded tounder W91236-19-C-0044 (source: SAM.gov award notice)• $6.3M
Overview
- Posted
- October 10, 2019
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Joint Base Langley Fort Eustis (JBLE), Newport News, VA
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Sep 30, 2019
- Award amount (SAM.gov award notice)
- $6.3M
Identifiers
- Solicitation number
- W9123619B0020
- Notice ID
- 5db57034206dbd5bed9f5914721d1146
- Award number (PIID)
- W91236-19-C-0044
Description
REPLACE FLIGHT LINE AVIATION POL YARD (JBLE) JOINT BASE LANGLEY EUSTIS NEWPORT NEWS, VA This is a pre-solicitation notice. This is NOT a solicitation. Do NOT submit proposals or questions in response to this notice. The U.S. Army Corps of Engineers-Norfolk District intends to issue an Invitation for Bids (IFB) for the acquisition of a Replacement Flight Line Aviation POL Yard, (JBLE) Joint Base Langley Eustis, Newport News, VA. This procurement will be conducted in accordance with FAR Part 14, Sealed Bidding Procedures. The requirement will be small business set aside. The applicable NAICS code is 237120, Oil and Gas Pipeline and Related Structures with a Business Standard of $36.5M. The Government intends to award a firm-fixed-price (FFP) Sealed Bid contract with nine (9) Base Contract Line Items (CLINS) and eight (8) Option CLINS. The magnitude of construction is between $5,000,000 and 10,000,000. This effort will require the services of a construction firm capable of managing the failing infrastructure at Felker Army Air Field, JBLE with a modern, complete, and usable fuel point. The new POL Yard will be constructed adjacent to the existing POL Yard location. The two (2) 30,000 gallon aboveground storage tanks will be replaced with two (2) 20,000 gallon aboveground storage tanks, with room reserved for a future third tank. The project will have all necessary associated equipment, truck parking, truck fill islands, offloading station, filtration, canopies, storage building and distribution piping. The contract completion date will be 300 calendar days after notice to proceed. Contractors will be required to submit bonding documents prior to award. The Government intends to award a firm fixed priced contract to the responsible bidder whose proposal conforms to the terms of the IFB notice, is determined fair and reasonable, and offers the best overall value to the Government as determined through an IFB Sealed bid process with definitive responsibility criteria. The Definitive Responsibility Criteria (DRC) is anticipated to be as follows: The Bidder shall identify a minimum of two (2) and a maximum of four (4) projects in which it has performed as the prime contractor, joint venture, or subsidiary demonstrating experience with the following elements: Installation of fabricated above ground jet fuel storage tanks, offload position, and fill stand position that complies with the criteria and standards within the DoD Unified Facilities Criteria (UFC) 3-460-01. The Bidder may demonstrate experience with individual elements in one project or may demonstrate experience with each element in separate projects provided the offeror demonstrates performance of each element in two different projects. If experience with all elements is demonstrated in one project, the project must have a minimum value of $3 million. If experience with construction of individual offload, truck fill stand, or tanks is demonstrated through separate projects, the project must have a minimum value of $500k. Projects must have been performed within eight (8) years prior to the date of this IFB. The Bidder will demonstrate this experience through the submission of a Past Performance Questionnaire. The IFB and accompanying documents will be issued electronically and will be uploaded to the Federal Business Opportunities (FBO) website (https://www.fbo.gov) on or about July 31, 2019 Telephone calls or written requests for the IFB package will NOT be accepted. Prospective bidders are responsible for monitoring FBO to respond to the solicitation and any amendments or other information regarding this acquisition. Prospective bidders must be registered in the System for Award Management (SAM) in order to be eligible for award. For inquiries about this synopsis, please contact Mr. Kevin Comegys at kevin.e.comegys@usace.army.mil
Award Overview
Award Number
W91236-19-C-0044
Award Amount (SAM.gov award notice)
$6.3M
Award Date
Sep 30, 2019
Awardee
Awardee UEI
EMASMKK6DMN8
Original Solicitation
Notice ID: 5db57034206dbd5bed9f5914721d1146
Posted Date: Oct 10, 2019
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $194.6KSigned Jul 30, 2026
- $5.3MSigned Apr 22, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9123619B0020- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 7×Pre-SolicitationMay 17, 2019
Replace Flight Line Aviation POL Yard
- SolicitationSep 5, 2019
Replace Flight Line Aviation POL Yard
- AwardedCurrentOct 10, 2019
Replace Flight Line Aviation POL Yard
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2. | 66% | Pre-Solicitation | 10/06/2026 |
Sources sought notice including a draft Scope of Work to demolish existing 5K gal diesel storage tank (facility 41903) and replace with a new 5K gal tank (facility 41911). Remove and re-install existing ATG probe and float. | 65% | Market Research | 10/02/2026 |
This is a SOURCES SOUGHT notice; a market survey for information only, to be used for preliminary planning purposes. This is NOT a request for quotes or proposals. The intent of this notice is to identify qualified, experienced, and interested offerors capable of performing the type of work as described herein for information and planning purposes. The information received will be utilized by the United States Air Force to facilitate the planning and decision-making process and will not be disclosed outside of the agency. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. Respondents will NOT be notified of the results of this sources sought. Respondents are not required to submit information in response to this announcement to participate in any future solicitation that may come as a result of the information received. In accordance with Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(c)(2), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The 55th Contracting Squadron, Offutt Air Force Base, NE, is seeking information for the following items listed below: General: The purpose of this sources sought is to conduct Market Research in accordance with RFO Part 10, for the repair and replacement of existing gas leaks on 6” pipe and 8” pipe and valves, along with some associated component replacement on 2” pipe and valves. This requirement consists of repairing and replacing identified gas distribution system components, site verification, coordination for excavation, system outages, Lock-Out-Tag-Out, utility coordination, and operational testing. Please see the attached Statement of Work for more information. All project work and related services shall be performed IAW all terms, conditions, special contract requirements, specifications, attachments, technical exhibits and references and publications contained in the contract or incorporated by reference. All information is voluntary. The capabilities package should be complete and sufficiently detailed enough to allow the Government to determine the firm’s qualifications to perform the defined work. Your response should include the following information: Company Information Company name Address Point of contact Telephone and fax number E-mail address Website (if available) Commercial and Government Entity (CAGE) Code Unique Entity ID (UEI) Number Socio-Economic status (i.e., 8(a), HUBZone, women-owned, service-disabled veteran-owned, etc.) Experience and overview of your company Responses to this sources sought announcement can be submitted to the 55th Contracting Squadron via e-mail to gabriel.holcombe@us.af.mil by 12:00 PM Central Standard Time on 17 November 2026. IF A SOLICITATION IS ISSUED, IT WILL BE ANNOUNCED AT A LATER DATE. All interested parties must respond to any solicitation announcement separately from the responses to this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement. | 58% | Market Research | 11/17/2026 |
54% | Awarded | Open | |
***This solicitation is a Small Business set-a-sided, restricted to 100% small business only.***The project includes repairs and upgrades to an existing fuel storage and dispensing facility. Work includes repairing concrete and pavement; removing water from an underground communications access box; installing an emergency fuel shutoff station and leak detection equipment; and repairing and recoating fuel system canopies, piping, and related components. Additional work includes replacing tank vents, repairing and improving grounding systems, modifying platforms to provide safe access to tank equipment, and upgrading the automatic tank gauging (ATG) system and associated controls.*****Proposal Due Date has been extended from 11/23/2026 to 12/21/2026 at 14:00 CST***** | 54% | Solicitation | 12/21/2026 |
Additional Details
Solicitation Number
W9123619B0020
Archive Date
Oct 15, 2019
Office Address
NORFOLK, VA, 23510-1096