Marysville Ring Levee Phase 2B & 3

Archived on February 27, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−08:00
Posted
February 3, 2020
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W075 ENDIST SACRAMENTO
Place of performance
Marysville
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W9123820R0021
Notice ID
95100204c23d416fa498d9d32698e3fa

Description

****Amendment 3 included specification changes, revised pricing schedule, edits tot he evaluation factors and extends the proposal due date.**** Amendment 2 included a revised pricing schedule, revised specification sections, a reduction of the period of performance, the final Environmental Assessment, and historical structure impact report. ***Intrested Vendors List has been posted, as of 3pm 10 Jan 2020.*** ****Attachment 2 - Drawings Volume 2 of 2 is too large to attach to this posting. Please contact DeAnna.L.Mannel@usace.army.mil for the file to be sent to you via a file transfer site.**** The Marysville Ring Levee (MRL) consists of approximately 7.5 miles of levee surrounding and protecting the City of Marysville, California. Planned levee improvements address under seepage, through-seepage, embankment slope stability, utility penetrations, constructability, settlement and geometrical corrections to the levee embankment. Two phases of the Marysville Ring Levee program, namely Phase 2B & Phase 3 are solicited as one construction project and are to be constructed in a minimum of two construction seasons with all construction work completed by Dec. 2022. Phase 3 has been divided up into multiple Segments (A through E) and Phase 2B labeled as Segment D. Segments A, B, and C will be base contract items and Segments D and E will be option items. Upon award of this contract, Segment A must be constructed first in 2020. Segments B and C must not begin physical work sooner than year 2021, unless otherwise notified by the Contracting Officer. Options Segments D and E must not begin physical work sooner than year 2021 and as the options are exercised, unless otherwise notified by the Contracting Officer. Approximately 15,000 linear feet of cutoff walls (open trench and deep mix method) will be constructed with a conventional degrade approach with removal of 1/3 of the levee height as measured from an average landside elevation. The cutoff wall begins on the east side of State Route 70 (SR70) and ends at a location just west of Highway 20, where the highway goes over the levee, near the PG&E sub- station.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Uriel Ramirez
Contracting Specialist

Secondary Contact

DeAnna L. Mannel
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:W9123820R0021
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    SolicitationCurrentDec 20, 2019

    Marysville Ring Levee Phase 2B & 3

    Notice 95100204c23d416fa498d9d32698e3fa on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Bid Abstract Posted 5/12/2026***********************************Request for Information Responses Posted 4/29*********************************************Project Title: Alameda Zone 7 Flood Control Channels PL 84-99 Repairs Phase 2 and Phase 3 Project Location: ALAMEDA COUNTY, CAProject Description: This is an invitation for bids for the Alameda Zone 7 PL 84-99 Repair project is an Operations and Maintenance project to repair storm damage to flood control channels in Alameda County. Damages consisted of erosion and bank failures during a series of atmospheric rivers between December 2022 and March 2023. Work for this project is noted as Alameda Zone 7 Flood Control Channels, PL 84-99 Project, Phase 2 and Phase 3. The magnitude of construction is between $10,000,000-$25,000,000. This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. This Invitation for Bids is a small business set aside. The size standard is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin (logan.champlin@usace.army.mil). Phase 2 of the project consists of a total of 21 repair sites and is the base contract to be worked in 2026. Phase 3 of the project consists of a total of 20 repair sites and is the optional work that, if exercised, will be performed in 2027. The existing flood control channels typically have earthen slopes previously constructed to grades of 2H:1V, with channel heights ranging from 15-30 feet. The damaged sites vary in sizes. Repairs to damaged sites will restore the slopes to original grade prior to the storm damages. A site visit will be conducted on 20 April 2026 at 9:00 AM at 6900 W Las Positas Blvd, Pleasanton, CA 94588. This requirement is a TOTAL SMALL BUSINESS SET ASIDE and will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. ALL BIDS will be due on 11 MAY 2026 at 12:00 PM PDT. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers.b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.c) Offers MUST BE submitted electronically through the PIEE website.d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
82%
Solicitation05/11/2026
This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin (logan.champlin@usace.army.mil). Estimated Cost Range is between $10,000,000-$25,000,000 PROJECT TITLE: Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3) PROJECT LOCATION: ALAMEDA COUNTY, CA PROJECT DESCRIPTION: The Alameda Zone 7 PL 84-99 Repair project is an Operations and Maintenance project proposed by USACE to repair storm damage to flood control channels in Alameda County. Damages consisted of erosion and bank failures during a series of atmospheric rivers between December 2022 and March 2023.Work for this project is noted as ?Zone 7 Flood Control Channel, PL 84-99 Project, Phase 2 and Phase 3.?Phase 2 of the project consists of a total of 21 repair sites including four (4) sites on Arroyo de la Laguna , four (4) sites along Arroyo del Valle, four (4) sites along Alamo Canal, eight (8) sites along Arroyo, and one (1) site along Tassajara Creek. The Government estimates that this work will be completed in the summer of 2026.Phase 3 of the project consists of a total of 20 repair sites including sixteen (16) along South San Ramon Creek, three (3) sites along Alamo Canal, and one (1) site on Alamo Creek. The Government estimates that this work will be completed in the summer of 2027.The existing flood control channels typically have earthen slopes previously constructed to grades of 2H:1V, with channel heights ranging from 15-30 feet. The damaged sites vary in sizes. Repairs to damaged sites will restore the slopes to original grade prior to the storm damages. Earthwork will start with excavation of the damaged area, removing disturbed soil and vegetation within the area. Repairs will consist of placing Rock Slope Protection (RSP) at the waterside slope toe, placing soil-filled RSP up to the 10-year water surface elevation, and restoring the upper portion of the slope with compacted backfill. After the remaining slope is backfilled and compacted above the stone protection, erosion control matting will be installed and hydroseeded. Work is to be completed from land access only to the work/repair areas. This requirement is a TOTAL SMALL BUSINESS SET ASIDE and will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. The solicitation will be available on/about 31 March 2026 for viewing/downloading. ALL BIDS will be due on/about 30 April 2026 at 12:00 PM PDT. The specific date and time will be identified in the solicitation. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
82%
Pre-Solicitation03/30/2026
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
75%
Solicitation10/21/2026
Wilford Hall Ambulatory Care Center, Phase 4 - Site Improvements, Lackland AFB, JBSA, San Antonio, Texas. See attachment for details.
73%
Market Research04/02/2026
72%
Market Research08/24/2026

Additional Details

Solicitation Number

W9123820R0021

Archive Date

Feb 27, 2020

Office Address

SACRAMENTO, CA, 95814-2922