Notice ID: 4339b48be87d4447a72be179c55c8454Solicitation
Fort Hood Fuel Facility Replacement
Archived on October 9, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM UTC−05:00
- Posted
- September 16, 2021
- Notice type
- Solicitation
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST FT WORTH
- Place of performance
- Fort Hood, 76544
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W9126G21R0037
- Notice ID
- 4339b48be87d4447a72be179c55c8454
Description
16 Sep - Amendmnet 3 posted in attachments 10 Sep - Amendment 2 posted in attachments 02 Sep - Amendment 1 posted in attachments 19 Aug- Site Visit Information has been uploaded in attachments. This announcement is an unrestricted Firm-Fixed price acquisition to construct a new Type III Hydrant System at Fort Hood, Texas. The proposed project will be a competitive, firm-fixed price, Design-Bid-Build contract. The North American Industrial Classification System code is 237120, which has a size standard of $39.5 million. The contract is anticipated to be awarded 30 September 2021. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/SAM/. No state level certifications will be accepted. PROJECT INFORMATION: Construction range is between $25,000,000 and $100,000,000. Contract work consists of Constructing a new Type III Hydrant System that includes above ground fuel storage tanks, pump shelter with a control room. product recovery tank, truck loading points with combined hydrant hose truck checkout stand, truck unloading points, spill containment, and supporting facilities. The new fuel facility will supply a new aircraft direct fuel system to the parking apron at Robert Gray Army Airfield (RGAAF) at Fort Hood. Anti-terrorism (AT/FP), cyber-security, and sustainable design principles are incorporated into the construction. The new hydrant loop includes installing new piping to complete the issue and return loop between the new pump house and the 6 hydrant outlets located at the refueling apron. Piping will include all required supports, valves, and any other necessary appurtenances. The new fuel storage tanks are 6,000 barrels (504,000 gallon) above ground storage tanks and include all associated piping and equipment automatic tank gauging, independent alarm system, platforms, railing, stairs, tank foundations and supports. The new standard Type III pump shelter will contain an enclosed control room, mechanical room, restroom, and open-sided pump area as well as emergency shut-off switches, emergency shower and eyewash, HVAC, fire sprinklers, alarms, bridge crane, pump controls, grounding and lightning protection, pig launcher and receiver stations, communications and data infrastructure, and leak detection systems. Provide an above ground double-wall product recovery tank and all associated piping, pumps, valves, and appurtenances. The new standard Type III POL pump equipment will include 600-GPM pumps, 1,200-GPM receipt filter separators, 600-GMP issue filter separators, and all related piping, piping supports, pumps, valve, and appurtenances. New fill stands and truck unloading points will be constructed. This work also includes refueler truck load and unload containment areas, hydrant hose truck checkout stand, well as all mechanical equipment, pumps, grounding, spill containment, piping, and supports along with Site improvements Demolition and site preparation includes removing the existing hydrant pits at the fueling apron, associated piping and appurtenances, pavement and site clearing and grading. After solicitation issuance, contractors may view and or download this solicitation, specifications and all amendments at the following internet addresses: SAM.gov website at https://sam.gov/. Type in the search box the solicitation number W9126G21R0037. The use of the websites requires prior registration. Plans and specifications will NOT be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the SAM.gov website and or any other official government website for amendments to the solicitation. You must be registered with the SAM, to receive a Government contract award. Phase1 proposals are due on 10 September 2021 (unless extended by amendment). If the Government elects to conduct a pre-proposal conference or site visit, it will be conducted after the Phase 2 selection has been made. The Primary Point of Contact for this project is Paige Stone, Contract Specialist, email is paige.e.stone@usace.army.mil All questions MUST be received through email for record. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the SAM website after solicitation issuance. Contractors shall register themselves at this website under the solicitation number to receive a copy of the solicitation
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W9126G21R0037- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Special NoticeDec 10, 2020
Fort Hood Fuel Facility Replacement
- 2×Market ResearchDec 10, 2020
Fort Hood Fuel Facility Replacement
- Pre-SolicitationApr 16, 2021
Fort Hood Fuel Facility Replacement
- 9×SolicitationCurrentAug 5, 2021
Fort Hood Fuel Facility Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area. | - | Solicitation | 12/04/2026 |
***This solicitation is a Small Business set-a-sided, restricted to 100% small business only.***The project includes repairs and upgrades to an existing fuel storage and dispensing facility. Work includes repairing concrete and pavement; removing water from an underground communications access box; installing an emergency fuel shutoff station and leak detection equipment; and repairing and recoating fuel system canopies, piping, and related components. Additional work includes replacing tank vents, repairing and improving grounding systems, modifying platforms to provide safe access to tank equipment, and upgrading the automatic tank gauging (ATG) system and associated controls.*****Proposal Due Date has been extended from 11/23/2026 to 12/21/2026 at 14:00 CST***** | - | Solicitation | 11/23/2026 |
This project involves modifying a 12,000 gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside. | - | Pre-Solicitation | 10/14/2026 |
Sources sought notice including a draft Scope of Work to demolish existing 5K gal diesel storage tank (facility 41903) and replace with a new 5K gal tank (facility 41911). Remove and re-install existing ATG probe and float. | - | Market Research | 10/02/2026 |
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2. | - | Pre-Solicitation | 10/06/2026 |
Additional Details
Solicitation Number
W9126G21R0037
Archive Date
Oct 9, 2021
Office Address
FORT WORTH, TX, 76102-6124