Notice ID: e04ef417c4e74ffba705bbfecc625908Solicitation
Pre-Solicitation Notice Competitive 8(a) - SP-POL-SRM-Edwards AFB - MSS-Transfer line-Hydrant 3
Archived on May 18, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- May 2, 2024
- Notice type
- Solicitation
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST OMAHA
- Place of performance
- Edwards, CA, 93523
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W9128F24R0053
- Notice ID
- e04ef417c4e74ffba705bbfecc625908
Description
*02 May 2024*: Projnet has been updated to answer 3 final questions. The proposal due date will not be adjusted. *19 April 2024*: All amendment 0002 documents have been uploaded to solicitation. The propopsal due date has also been extended to reflect 03 May 2024. *16 April 2024* The proposal due date of 17 April 2024 has been suspended at this time. A new proposal due date will be issued in the next few days as Projnet questions are still being addressed. *3 April 2024*: Proposal due date has been updated to reflect new propsal due date which is now 17Apr 2024 at 2pm CST. At this time, due to technical issues Amendment 0001 (updating the proposal due date) will not be posted. The amendment will be incorporated to this soliciation ASAP. * 13 March 2024* Sign in sheet from 5 March 2024 site visit has been posted 16 Feb 2024: UPDATE - BIdder inquiry key has been updated to ASF789-R2EASB SOLICITATION #W9128F24R0053 SP-POL-SRM-Edw ards AFB - MSS-Transfer line-Hydrant 3 This solicitation is open to all 8(a) firms (SBA Requirement Number:MT1704488252E) Location: Edw ards AFB, Kern County, CA
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W9128F24R0053- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJan 26, 2024
Pre-Solicitation Notice Competitive 8(a) - SP-POL-SRM-Edwards AFB - MSS-Transfer line-Hydrant 3
- 8×SolicitationCurrentFeb 12, 2024
Pre-Solicitation Notice Competitive 8(a) - SP-POL-SRM-Edwards AFB - MSS-Transfer line-Hydrant 3
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2. | 70% | Pre-Solicitation | 10/06/2026 |
Sources sought notice including a draft Scope of Work to demolish existing 5K gal diesel storage tank (facility 41903) and replace with a new 5K gal tank (facility 41911). Remove and re-install existing ATG probe and float. | 69% | Market Research | 10/02/2026 |
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area. | 69% | Solicitation | 12/04/2026 |
63% | Awarded | Open | |
***This solicitation is a Small Business set-a-sided, restricted to 100% small business only.***The project includes repairs and upgrades to an existing fuel storage and dispensing facility. Work includes repairing concrete and pavement; removing water from an underground communications access box; installing an emergency fuel shutoff station and leak detection equipment; and repairing and recoating fuel system canopies, piping, and related components. Additional work includes replacing tank vents, repairing and improving grounding systems, modifying platforms to provide safe access to tank equipment, and upgrading the automatic tank gauging (ATG) system and associated controls.*****Proposal Due Date has been extended from 11/23/2026 to 12/21/2026 at 14:00 CST***** | 63% | Solicitation | 12/21/2026 |
Additional Details
Solicitation Number
W9128F24R0053
Archive Date
May 18, 2024
Office Address
OMAHA, NE, 68102-4901