Notice ID: 563024551000a55866f695f84084f9e9Award NoticeAwarded
RECOVERY--Y--PROJECT NUMBER 14270, Pomme De Terre Lake, MO, PROJECT NUMBER 17560, Stockton Lake, MO
Awarded on December 17, 2009. Full description on SAM.gov.
Awarded tounder W912Dq-10-C-1008 (source: SAM.gov award notice)• $2.8M
Overview
- Posted
- December 17, 2009
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST KANSAS CITY
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Dec 17, 2009
- Award amount (SAM.gov award notice)
- $2.8M
Identifiers
- Solicitation number
- W912DQ09B1033
- Notice ID
- 563024551000a55866f695f84084f9e9
- Award number (PIID)
- W912Dq-10-C-1008
Description
The U.S. Army Corps of Engineers, Kansas City District, has issued a Firm-Fixed Price contract W912DQ-10-C-1008 using American Recovery and Reinvestment Act (ARRA) funds. The original solicitation number was W912DQ-09-B-1033 and is awarded to Swift Construction Company (CAGE: 5C8Y2).
Award Overview
Award Number
W912Dq-10-C-1008
Award Amount (SAM.gov award notice)
$2.8M
Award Date
Dec 17, 2009
Awardee
Original Solicitation
Notice ID: 563024551000a55866f695f84084f9e9
Posted Date: Dec 17, 2009
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Amanda Reyes, 816-389-3991 US Army Engineer District, Kansas City
Documents
No documents available.
Lifecycle
Solicitation:
W912DQ09B1033- Awarded
This opportunity has been awarded.
- AwardedCurrentDec 17, 2009
RECOVERY--Y--PROJECT NUMBER 14270, Pomme De Terre Lake, MO, PROJECT NUMBER 17560, Stockton Lake, MO
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
| - | Solicitation | 12/09/2026 | |
The U.S. Army Corps of Engineers, Kansas City District, anticipates issuing Request for Proposals No. W912DQ27RA004 for a total small-business set-aside Multiple Award Task Order Contract (MATOC) supporting the Missouri River Bank Stabilization and Navigation Project. The requirement includes the repair, modification, and construction of river-training structures, including dikes and revetments, through placement of quarry-run stone and excavation of notches. Work will be performed by floating plant along the Missouri River between River Miles 0-542. The scope of work includes, but is not limited to, the construction, modification, and repair of stone dikes and revetments; bank paving and hard points; revetment overlays; and excavation of notches. The work requires the capability of mobilizing, loading, and unloading barges from accessible quarries with graded stone along the Missouri River. Structures are located between the high banks of the Missouri River to include side channel chutes. All work to be performed will be completed by floating plant as no land access will be available. Stone is typically placed by way of track-hoe from a work barge. Contractor equipment shall be capable of accessing designated structures in water depths of four feet or greater.The Government anticipates awarding four (4) to five (5) firm-fixed-price indefinite-delivery, indefinite-quantity (IDIQ) contracts within the MATOC. The Government also anticipates awarding one concurrent seed task order within the MATOC pool. The MATOC will have a shared aggregate maximum capacity of $50,000,000 for all awards, consisting of a three-year base ordering period and two one-year option periods. The minimum guarantee is $2,500 for each awarded IDIQ contract.This acquisition is a total small-business set-aside under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. The applicable small-business size standard is $45 million.The solicitation is anticipated to be issued on or about January 2027. The solicitation will establish the proposal due date and time; the Government anticipates allowing approximately 30 calendar days for proposal submission. A bid guarantee is required with the seed task order proposal in an amount equal to 20 percent of the proposed seed task order price or $3,000,000, whichever is less. The successful seed task order awardee will be required to furnish performance and payment bonds, each in the amount of 100 percent of the seed task order award amount, before issuance of the Notice to Proceed. Currently, a Pre-Solicitation Conference is not scheduled. If the Government decides to hold a conference, this announcement will be amended accordingly.The solicitation will use a best-value tradeoff source-selection process. The Government intends to award without discussions but reserves the right to conduct discussions if determined necessary. The solicitation will identify the official posting location and the authorized electronic proposal-submission method. Electronic proposals will be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. Offerors are responsible for establishing and maintaining the required PIEE access, including the Proposal Manager role, sufficiently in advance of the proposal due date.Notice is given that it has been determined a consolidation of contract requirements is necessary and justified for this action. The determination will be published with the solicitation.Offerors must maintain an active System for Award Management registration and current representations and certifications, as required by the solicitation and applicable regulations.Prospective offerors are responsible for monitoring the official posting location for amendments and other updates.Prospective offerors shall submit contracting and technical questions through ProjNet Bidder Inquiry. The solicitation will provide the Bidder Inquiry Key and establish the deadline for questions. The Government will address questions through formal solicitation procedures. | - | Pre-Solicitation | Open |
NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0005 extends the proposal due date to 10:00AM CST, Wednesday, December 9, 2026. See all attachments for full details. | - | Solicitation | 12/09/2026 |
***October 20, 2026 Update #2: An updated version of the Q&A responses has been posted. It contains responses to all 27 questions that were submitted on ProjNet. ***October 20, 2026 Update #1: Amendment 0001 to the solicitation was posted on 10/19/26. Responses to 25 of the 27 questions submitted on ProjNet were also posted on 10/19/26. Levee Access Manholes for Fairfax-Jersey Creek Levee Unit. The U.S. Army Corps of Engineers, Kansas City District, has a need for design-build construction services to install access manholes to facilitate access to an existing seepage collection system in the levee. Invasive mass excavation methods such as trenching will not be allowed. Minimally invasive excavation methods are required. The location is the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The requirements are described in more detail in this solicitation. The North American Industry Classification System (NAICS) Code is 237990, Size Standard $45 Million. The magnitude of this project is represented by the following estimated price range: Between $1,000,000.00 and $5,000,000.00. THE CONTRACT AWARD AMOUNT (INCLUSIVE OF ALL CONTRACT LINE ITEMS) SHALL NOT EXCEED $3,400,000.00 FOR THIS PROJECT. OFFERORS ARE UNDER NO OBLIGATION TO APPROACH THIS AMOUNT. | - | Solicitation | 10/26/2026 |
Sources Sought Notice - Construction - Wood River Relief Wells No. 2 - Please see attached for all pertinent details. | - | Market Research | 10/28/2026 |
Additional Details
Solicitation Number
W912DQ09B1033
Archive Date
Jun 28, 2010