Notice ID: 01c74f01e76641aa910364ea7388a609Solicitation
Lock and Dam 22 - Tainter Gates
Archived on October 1, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- September 8, 2023
- Notice type
- Solicitation
- NAICS
- 332312: Fabricated Structural Metal Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ROCK ISLAND
- Place of performance
- New London, MO, 63459
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912EK23B0009
- Notice ID
- 01c74f01e76641aa910364ea7388a609
Description
08 Sep 2023 - Bid summary posted 05 Sep 2023 - Amendment 0001 posted with specification changes 21 Aug 2023 - Revised title to match the pre-solitication notice Please see the attached documents for more information
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Joe Porter
Secondary Contact
Nicholas Moore
Documents
No documents available.
Lifecycle
Solicitation:
W912EK23B0009- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 25, 2023
Lock and Dam 22 - Tainter Gates
- 4×SolicitationCurrentAug 9, 2023
Lock and Dam 22 - Tainter Gates
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The solicitation is amended to provide revisions to the Purchase Description, CLIN Structure, provide a Projnet Plan Room key to access the Bathymetry survey information and extend the quote due date. Also, Contractor Questions Answered Part 2 are posted. Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height. This acquisition is not set-aside for small business concerns and is competed as full and open competition, Unrestricted. An organized site visit has been scheduled for: Friday, 9 October 2026 at 11am. | - | Combined Synopsis | 11/02/2026 |
This solicitation provides for the purchase of materials outlined below in the attached Scope of Work. | - | Solicitation | 11/16/2026 |
This solicitation provides for the purchase of materials outlined below. Material must be delivered within 8 weeks of the award date. | - | Solicitation | 11/16/2026 |
This procurement is for one (1) firm-fixed price commercial supply contract for the Marietta Repair Station to procure steel materials to complete work on Stamford De-Watering Box. The work includes providing the listed steel and other materials using NAICS code 332312 and PSC 9520. 1.1 Material: ASTM 1018 CR round bar. 1.a 6 1/2” dia round, 8’ long qty 6 2.1 Material: ASTM A434 CL bc (Q&T). 2.a 4” dia solid, 8 ft long, qty 20 3.1 Material: ASTM A53 Seamless pipe 3.a 1 ½” Dia Sch 40, qty 500 ft 3.b 3” dia Sch 40, 20 ft in length qty2 4.1 Material: ASTM 1026 tubing seamless 4.a 8” dia, 1.125 wall thickness, 20 ft long qty 1 5.1 Material: ASTM A36 5.a 1” dia round solid, 20 ft long, qty 2 5.b 2” flat bar, ½” thick, 20’ long. qty 2 5.c 2 1/2” flat bar, ½” thick, 20’ long, qty 4 6.1 Material: ASTM 709 Gr 50 for zone 2 (Plate) 6.a ¾” thick 4’ wide 8’ long qty 18 6.b ½” thick 4’ wide 8’ long, qty 28 6.c 1” thick 5’ wide 10’ long, qty 8 6.d ¾” thick 5’ wide 10’ long, qty 4 7.1 Material: ASTM A709 Gr 50 for zone 2, T-Beam 7.a WT 7x37, 20’ long, qty 12 8.1 Material: ASTM A709 Gr 50 for zone 2, Flat bar 8.a 4” thick, 10” wide, 10’ long, qty 30 8.b 1” thick, 25” wide, 10’ long, qty 30 8.c 2” thick, 3” wide, 10’ long, qty 30 8.d ¼” thick, 2” wide, 10’ long, qty 30 9.1 Material: ASTM A36 9.a ¼” thick, 4’ x 8’ plate, qty 25 9.b ¾” thick, flat bar 3” wide, 20’ long, qty 4 9.c 3/8” thick, flat bar 3” wide, 20’ long, qty 4 10.1 Material: ASTM 709 Gr 50 for zone 2, 10.a Rolled Skin plate with weld bevels marked in yellow in the attached drawings. 11.1 Material: ASTM 709 Gr 50 for Zone 2. 11.a Seal Bar shapes and qty is attached in drawings. 12.1 Fasteners: ASTM A325 12.a 1” dia 8, TPI, 8” length 12.b 1” dia DTI, Washers, qty 500 12.c 1” dia 8, TPI, Heavy Hex Nut, qty 500 12.d 1” dia 8, TPI, Jam Nut, qty 500 12.e 1 1\2”, 6 TPI. 7” long, with Castle Nut Cotter Pin, qty 100 | - | Pre-Solicitation | 10/28/2026 |
This procurement is for one (1) firm-fixed price commercial supply contract for the Marietta Repair Station to procure steel materials to complete work on Stamford De-Watering Box. The work includes providing the listed steel and other materials using NAICS code 332312 and PSC 9520. 1.1 Material: ASTM 4140 HR ANN round bar. 1.a 5” dia round, 8’ long qty 3 2.1 Material: ASTM C95500 Bronze. 2.a 5” dia solid, 10 ft long, qty 2 3.1 Material: ASTM 6061-T6 Aluminum 3.a 7” OD solid, 8ft length, qty 1 3.b 13” OD solid, 10 ft long, qty 1 4.1 Material: ASTM 1026 tubing seamless 4.a 8” dia, 1.125 wall thickness, 20 ft long qty 1 5.1 Material: ASTM 1018 CR 5.a 9” dia solid, 8’ long, qty 1 6.1 Material: ASTM A668 CL G 6.a 12” dia, 8’ ft long, qty 2 6.b 8” dia, 8’ ft long, qty 1 7.1 Material: ASTM C95400 Alum Bronze 7.a 12” OD x 8” ID 4’ ft long, qty 1 7.b 10” OD x 7” ID 4’ ft long, qty 2 8.1 Material: ASTM A240 Duplex 2205 8.a 3” thick, 4’x 8’ plate, qty 10 8.b 2” thick, 4’ x 8’ plate. qty 10 8.c 5” dia round solid, 8’ long, qty 1 9.1 Material: ASTM A36 9.a ¼” thick, 4’ x 8’ plate, qty 25 9.b ¾” thick, flat bar 3” wide, 20’ long, qty 4 9.c 3/8” thick, flat bar 3” wide, 20’ long, qty 4 10.1 Material: ASTM A1 Rail 10.a #60 AS Rail qty 500 foot | - | Pre-Solicitation | 10/28/2026 |
Additional Details
Solicitation Number
W912EK23B0009
Archive Date
Oct 1, 2023
Office Address
ROCK ISLAND, IL, 61299-5001