GovChime
Notice ID: fd7ade7d7ffb4bb48a8d19ec2d26bf4bSolicitationArchived

Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

Archived on May 5, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CDT
Posted
May 1, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND
Place of performance
Cedar Rapids, Iowa
PSC
Y1QA: CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912EK26BA001
Notice ID
fd7ade7d7ffb4bb48a8d19ec2d26bf4b

Description

**Updated Virtual Bid Opening Call-In Information** The access code has been updated. To access the virtual bid opening, please use the following information: 

Phone: 503-207-9433
Access Code: 759 365 344#

**Reminder: Submission of bids are due on 18 March 2026 at 1:00 PM CST and the Bid Opening will be held at 2:00 PM CST.**

ATTENTION

Due to file sizes and SAM.gov limitations at the time of release, not all of the files that are needed are posted. The files: 

1. Solicitation with Specifications (solicitation document without contract specifications was posted)
2. Attachment J-2 Plan Set - VOL 401 Floodwall

Please email Samantha Johanson and Brunson Grothus at the following emails and you will get a link to the files via DoD SAFE: 
samantha.k.johanson@usace.army.mil 
brunson.e.grothus@usace.army.mil 

The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station.

The work includes, but is not limited to: site demolition; temporary traffic controls; clearing, grubbing and stripping; pavement removal, levee removal, utility removal, plugging and abandonment of utilities; construction of rigid and flexible pavements, construction of utilities such as storm sewers, manholes and catch basins; construction of cast-in-place concrete floodwall, storm sewer outlets, gate wells, geotechnical instrumentation and relief wells, trench and toe drains, and pump station construction.

NAICS Code: 237990
Size Standard: $45,000,000.00
Estimated Range: Between $25,000,000 and $100,000,000
Unrestricted, Invitation for Bid

A site visit will be conducted on 02 December 2025 at 9:00 AM CST. **Please RSVP to Matthew Hosford at (309)252-2008 or matthew.m.hosford@usace.army.mil by 28 November 2025 at 10:00 AM CST if you plan to attend.** See clause 52.236-27 in the solicitation document for additional details.

Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CST on 18 December 2025. See "Question and Answer via ProjNet" within the Instructions to Bidders Section of the solicitation document for additional information.

**Amendment 0001 - The purpose of this amendment is to update the contract completion days from 850 to 970 consecutive calendar days, as well as extend the due dates for receipt of questions and bids. See attachment titled, "A22 - Solicitation Amendment W912EK26BA0010001" for details.

**Amendment 0002 - The purpose of this amendment is to update the Plans and Specifications based on questions received, add FAR Clause 52.219-4, update the Instructions to Bidders to include a list of what should be submitted with the Bid Package, and **Suspend bid submission due date and bid opening indefinitely. The bid submission due date of 08 April 2026 is set strictly as a placeholder. Another amendment will be issued in the future to re-establish a new date for receipt of bids and bid opening.**

**Amendment 0003 - The purpose of this amendment is to *remove the Project Labor Agreement requirement*, re-open the Q&A period, *establish a new due date for receipt of bids and bid opening*, update the Plans and Specifications based on questions received, update the Wage Determination to the most current version, and include an additional reference plan set as Attachment J-6. **Questions can be submitted via ProjNet until 02 March 2026 at 2:00 PM CST.**Submission of bids are due on 18 March 2026 at 1:00 PM CST and the Bid Opening will be held at 2:00 PM CST.**

**Amendment 0004 - The purpose of this amendment is to update the Plans and Specifications based on questions received. See attachments titled, "A22 - Solicitation Amendment W912EK26BA0010004 with Specs Rev3" and "A22 - Amendment 0004 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev3" for details.

**Bid Summary Sheet is posted in the Attachments section.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (17)

  • Bid Summary Abstract.pdf

    232 KBAdded in Solicitation version 15Posted
    Download
  • A22 - Solicitation Amendment W912EK26BA0010004 with Specs Rev3.pdf

    1.6 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0004 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev3.pdf

    4.3 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0003 - Attachment J-6 - Reference Plan Set 2.pdf

    11 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0003 - Attachment J-3 Plan Set - VOL 403 Pump Station Rev1.pdf

    2.4 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0003 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev2.pdf

    13 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0003 - Attachment J-1 Wage Determination Rev1.pdf

    86 KBAdded in Solicitation version 15Posted
    Download
  • A22 - Solicitation Amendment W912EK26BA0010003 SF 30 with Specs Rev2.pdf

    1.8 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Solicitation Amendment W912EK26BA0010002 with Specs Rev1.pdf

    40 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0002 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev1.pdf

    31 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Amendment 0002 - Attachment J-5 - Reference Plan Set.pdf

    38 MBAdded in Solicitation version 15Posted
    Download
  • A23 - Reach 4 Phase 1 Pre-Bid Sign In Sheet.pdf

    9.9 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Solicitation Amendment W912EK26BA0010001.pdf

    3.3 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Solicitation - W912EK26BA001 - IFB only.pdf

    5.6 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Attachment J-1 Wage Determination.pdf

    88 KBAdded in Solicitation version 15Posted
    Download
  • A22 - Attachment J-3 Plan Set - VOL 403 Pump Station.pdf

    35 MBAdded in Solicitation version 15Posted
    Download
  • A22 - Attachment J-4 Supplemental Data.pdf

    63 MBAdded in Solicitation version 15Posted
    Download

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice cb975f81e5fc4710ac145150c76a5133 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice 02e51927170f44d59af258168b574329 on SAM.gov

  3. 5
    Version 5SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice fbce9c3ae05c4aa99cb07eef04c1a7d2 on SAM.gov

  4. 6
    Version 6SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice d21f00baedee4eeb8b031d7593f48050 on SAM.gov

  5. 7
    Version 7SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice 66f79be323cb45188a4c8439a2a286a8 on SAM.gov

  6. 8
    Version 8SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice 446474c564d14137854652ce7ec1748b on SAM.gov

  7. 9
    Version 9SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice cc20ced71bac4acaa26b8194e9192140 on SAM.gov

  8. 10
    Version 10SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice 917a65b5bebd44c6afa197afe788d14d on SAM.gov

  9. 12
    Version 12SolicitationArchived

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice 8dc82354a0d94f88bf145a60969bbdef on SAM.gov

  10. 15
    Version 15SolicitationArchivedCurrent

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice fd7ade7d7ffb4bb48a8d19ec2d26bf4b on SAM.gov

  11. 18
    Version 18Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

    Notice 2b0eba7a72e84a88b712829b683c30bc on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912EK26BA001

Archive Date

May 5, 2026

Office Address

ROCK ISLAND, IL, 61299-5001