GovChime
Notice ID: d3e463121d5e4840abb1b9498b1ddb2bAward NoticeAwardedArchived

Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

Awarded on September 22, 2026. Full description on SAM.gov.

Awarded tounder W912EK26PA091 (source: SAM.gov award notice)• $159.4K

Overview

Posted
September 22, 2026
Notice type
Award Notice
Set-aside
Small Business Set Aside - Total
NAICS
335312: Motor and Generator Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND
Place of performance
Ottawa, Illinois, 61350
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Sep 22, 2026
Award amount (SAM.gov award notice)
$159.4K

Identifiers

Solicitation number
W912EK26PA091
Notice ID
d3e463121d5e4840abb1b9498b1ddb2b
Award number (PIID)
W912EK26PA091

Description

The U.S. Army Corps of Engineers, Rock Island District, requires the contractor to provide, set in place, and test run a 500 kW generator. Supply and delivery of spooled cable, and other listed supplies, is required. This is a turn-key installation of the generator, with exception of the cable and conduit. USACE will install the cable and conduit prior to delivery of the generator. The contractor shall provide the crane or any other delivery equipment to set the generator in place. All equipment and materials, including the enclosure and sub-base fuel tank, shall meet the specifications provided

Full description on SAM.gov

Award Overview

Award Number

W912EK26PA091

Award Amount (SAM.gov award notice)

$159.4K

Award Date

Sep 22, 2026

Awardee

Awardee UEI

GNY6JEXTZM89

Awardee CAGE Code

7VKN1

Awardee Address

Austin, TX 78702, UNITED STATES

Original Solicitation

Notice ID: d3e463121d5e4840abb1b9498b1ddb2b

Posted Date: Sep 22, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (3)

  • B08_Amendment_0001.pdf

    589 KBAdded in Solicitation version 4Posted
    Download
  • B08_Questions_and_Answers_Final.pdf

    23 MBAdded in Solicitation version 2Posted
    Download
  • B08_W912EK26QA043.pdf

    2.8 MBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

    Notice 7ea9be3697234cf19c8fdce434ef8cf0 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator

    Notice d3e463121d5e4840abb1b9498b1ddb2b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The abstract for this requirement is uploaded. The contractor shall supply and install a new minimum 48 kW propane-fueled generator set, propane fuel tank, and automatic transfer switch (ATS).
86%
Solicitation03/04/2026
LOCK and DAM 24 and 25 MITER GATE MOTORS, ADJUSTABLE SPEED DRIVES, AND MACHINERY BRAKES REPLACEMENT SUPPLY CONTRACT, LOCKS 24 and 25, MISSISSIPPI RIVER BETWEEN MO. RIVER AND MINNEAPOLIS, MN.
86%
Combined Synopsis01/27/2026
GENERATORS - Stationary and Mobile; 1. Stationary - Mounted on less than 190 gal (plus or minus 5 gal) #2 Diesel fuel tank. (Must have hole for conduit access); Runs on #2 Diesel Fuel; 60kVA (plus or minus 10kVA); 120/208 3-phase, 60Hz; Controls compatible with Generac GTS Series Transfer Switch; Equipped with Main Breaker, Batteries, Block Heater, Battery charger 2. Mobile - 60kVA (plus or minus 10kVA); 120/208, 3-phase, 60Hz; Mounted on 150gal (plus or minus10gal) #2 Diesel Fuel Tank; Runs on #2 Diesel Fuel; Prepared for mobile use with temporary connection ports; 100 feet (plus or minus 10 feet) of cables for each phase, neutral, and ground; Cables must come equipped with all coupling/connector ends installed; Integrally secured to a Heavy Duty Steel Trailer with 2 inch Ball hitch; DOT Towing package with Electric Breaks
74%
Combined Synopsis09/04/2026
Reason for amendment 0002 is to update the not to exceed dimensions, part number, as well as slight update to the salient characteristics. Generators.
74%
Combined Synopsis03/28/2026
150 kW Generator Dual FuelStandby Generator120/2083 Phase Type of Enclosure is NEMA 3R Rated; No tank required, natural gas is available at the site; Receiving facility and forklift available, so no offloading required. Battery and Battery Charger required. Amendment 0001 - Due date change. Amendment 0002 - EPA requirement correction.
73%
Combined Synopsis09/18/2026

Additional Details

Solicitation Number

W912EK26PA091

Archive Date

Oct 7, 2026

Office Address

ROCK ISLAND, IL, 61299-5001