Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator
Awarded on September 22, 2026. Full description on SAM.gov.
Overview
- Posted
- September 22, 2026
- Notice type
- Award Notice
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 335312: Motor and Generator Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND
- Place of performance
- Ottawa, Illinois, 61350
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 22, 2026
- Award amount (SAM.gov award notice)
- $159.4K
Identifiers
- Solicitation number
- W912EK26PA091
- Notice ID
- d3e463121d5e4840abb1b9498b1ddb2b
- Award number (PIID)
- W912EK26PA091
Description
The U.S. Army Corps of Engineers, Rock Island District, requires the contractor to provide, set in place, and test run a 500 kW generator. Supply and delivery of spooled cable, and other listed supplies, is required. This is a turn-key installation of the generator, with exception of the cable and conduit. USACE will install the cable and conduit prior to delivery of the generator. The contractor shall provide the crane or any other delivery equipment to set the generator in place. All equipment and materials, including the enclosure and sub-base fuel tank, shall meet the specifications provided
Award Overview
Award Number
W912EK26PA091
Award Amount (SAM.gov award notice)
$159.4K
Award Date
Sep 22, 2026
Awardee
Awardee UEI
GNY6JEXTZM89
Awardee CAGE Code
7VKN1
Awardee Address
Austin, TX 78702, UNITED STATES
Original Solicitation
Notice ID: d3e463121d5e4840abb1b9498b1ddb2b
Posted Date: Sep 22, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Lifecycle
- 2Version 2SolicitationArchived
Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Illinois Waterway Project Office - Starved Rock Lock and Dam - Generator
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The abstract for this requirement is uploaded. The contractor shall supply and install a new minimum 48 kW propane-fueled generator set, propane fuel tank, and automatic transfer switch (ATS). | 86% | Solicitation | 03/04/2026 |
LOCK and DAM 24 and 25 MITER GATE MOTORS, ADJUSTABLE SPEED DRIVES, AND MACHINERY BRAKES REPLACEMENT SUPPLY CONTRACT, LOCKS 24 and 25, MISSISSIPPI RIVER BETWEEN MO. RIVER AND MINNEAPOLIS, MN. | 86% | Combined Synopsis | 01/27/2026 |
GENERATORS - Stationary and Mobile; 1. Stationary - Mounted on less than 190 gal (plus or minus 5 gal) #2 Diesel fuel tank. (Must have hole for conduit access); Runs on #2 Diesel Fuel; 60kVA (plus or minus 10kVA); 120/208 3-phase, 60Hz; Controls compatible with Generac GTS Series Transfer Switch; Equipped with Main Breaker, Batteries, Block Heater, Battery charger 2. Mobile - 60kVA (plus or minus 10kVA); 120/208, 3-phase, 60Hz; Mounted on 150gal (plus or minus10gal) #2 Diesel Fuel Tank; Runs on #2 Diesel Fuel; Prepared for mobile use with temporary connection ports; 100 feet (plus or minus 10 feet) of cables for each phase, neutral, and ground; Cables must come equipped with all coupling/connector ends installed; Integrally secured to a Heavy Duty Steel Trailer with 2 inch Ball hitch; DOT Towing package with Electric Breaks | 74% | Combined Synopsis | 09/04/2026 |
Reason for amendment 0002 is to update the not to exceed dimensions, part number, as well as slight update to the salient characteristics. Generators. | 74% | Combined Synopsis | 03/28/2026 |
150 kW Generator Dual FuelStandby Generator120/2083 Phase Type of Enclosure is NEMA 3R Rated; No tank required, natural gas is available at the site; Receiving facility and forklift available, so no offloading required. Battery and Battery Charger required. Amendment 0001 - Due date change. Amendment 0002 - EPA requirement correction. | 73% | Combined Synopsis | 09/18/2026 |
Additional Details
Solicitation Number
W912EK26PA091
Archive Date
Oct 7, 2026
Office Address