FY26 GIWW Matagorda Bay to Corpus Christi Bay Maintenance Dredging with Goose Island Beneficial
Archived on November 25, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM CST
- Posted
- October 30, 2025
- Notice type
- Sources Sought
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTHWESTERN.W076 ENDIST GALVESTON
- Place of performance
- Corpus Christi, Texas
- Last updated
- Nov 6, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912HY-26-S-1AU9
- Notice ID
- e9794b86247c4eb59f83c2068225a198
Description
SOURCES SOUGHT SYNOPSIS
TITLE: FY26 GIWW Matagorda Bay to Corpus Christi Bay Maintenance Dredging with Goose Island Beneficial
Notice Type: SOURCES SOUGHT SYNOPSIS
Source Sought Number: W912HY-26-S-1AU9
The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS ANNOUNCEMENT SEEKS INFORMATION FROM INDUSTRY, WHICH WILL BE USED FOR PRELIMINARY PLANNING PURPOSES. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE U.S ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT. REPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. RESPONDENTS WILL NOT BE NOTIFIED OF THE RESULTS OF THE EVALUATION.
The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) and Woman-Owned Small Business (WOSB). The Government must ensure there is adequate competition of responsible firms.
Project Information: The work consists of maintenance dredging via pipeline:
Schedule - Maintenance dredging of the Gulf Intracoastal Waterway (GIWW) between Matagorda Bay to Corpus Christi Bay totaling approximately 950,000 CY. Placement areas are primarily open water (OWPAs 122-125), and semi-confined beneficial use sites (BUS B).
Option 1 - approximately 150,000 CY with placement at Goose Island (beneficial use marsh placement). An additional 30 calendar days will be added to contract duration if awarded.
Option 2 - Lydia Ann Channel. Maintenance dredging of approximately 150,000 CY with open water placement. An additional 30 calendar days will be added to contract duration if awarded. Placement will be in open water PAs 141-144.
Period of performance: Complete the entire work ready for use not later than 145 calendar days after the date the Contractor receives the Notice to Proceed with 60 Calendar days of optional line items. The contractor will be required to maintain an average production rate of 12,000 Cubic Yards (CY) a day.
In accordance with FAR 36 / DFARs 236, the estimated construction price range for this project is Between $5,000,000 and $10,000,000.
All construction performance must comply with the USACE Safety and Health Requirements Manual, (EM 385-1-1, and must also comply with all Federal, State, and local laws, ordinances, codes and/or regulations.
The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37.5 million.
The Product Service Code is Z1KF.
Small Businesses are reminded under FAR 52.219-14, (Deviation 2019-O0003), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded.
Prior Government contract work is not required for submitting a response to this announcement.
Contractor should be experienced with pipeline dredging operations. Contractor should provide examples of being a prime contractor dredging deep draft navigation channels utilizing a pipeline dredge and provide production rates.
Bonding Requirements: Performance and Payment Bonds are required within 5 calendar days after award and the contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed.
If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the amount of $4,200 for each calendar day of delay until the work is completed or accepted.
FIRMS RESPONSE SHALL INCLUDE THE FOLLOWING INFORMATION:
Unique Entity Identifier (UEI) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov.
Name of firm with address, telephone number, fax, e-mail address, and point of contact.
Indicate whether your firm will submit a bid for this project if set-aside for Small Business (SB), 8(a) Small Business Development Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) Woman-Owned Small Business (WOSB).
Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable.
Qualifications: Responses to this source sought announcement shall indicate specialized experience and technical competence in: Pipeline Dredging
Demonstrate experience in completing work outlined under the paragraph above for “Project Information.”
Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above or comparable work performed within the past five years.
Brief description of each project, customer name, and dollar value of the project - provide at least three examples.
Firm’s Bonding Capacity - Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount) bonding level per contract and aggregate construction bonding level, both expressed in dollars.
Firms responding to this announcement, who fail to provide ALL required information requested and outlined above, may be excluded from further consideration in the review and analysis for acquisition strategy determination.
Anticipated solicitation issuance date is on or about 26 May 2026 and the estimated proposal due date will be on or about 10 June 2026. Estimated award on or about date is 28 July 2026. The official synopsis citing the solicitation number will be issued on Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ inviting firms to register electronically to receive a copy of the solicitation when it is issued.
Interested Firm’s shall respond to this announcement no later than 10 November 2026, at 10:00 AM (Central Time). All interested firms must be registered in SAM.gov to be eligible for award of Government contracts. Email your response to Mr. Baskovic at wesley.n.baskovic@usace.army.mil and Ms. Tudor at Mirian.R.Tudor@usace.army.mil
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
FY26 GIWW Matagorda Bay to Corpus Christi Bay Maintenance Dredging with Goose Island Beneficial
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Solicitation W912HY26BA023 - Gulf Intracoastal Waterway, Texas Matagorda to Corpus Christi Bay with Goose Island BUS Placement Pipeline Dredging | 95% | Solicitation | 05/27/2026 |
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1-2 foot of allowable over depth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 – 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed. THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 July 2026. | 81% | Pre-Solicitation | 07/10/2026 |
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed. THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 JULY 2026. | 81% | Pre-Solicitation | 07/10/2026 |
FY26 USACE Galveston District. FY26 Double Bayou Maintenance Dredging. This Solicitation is being issued as 100% Small Business set-aside. | 80% | Solicitation | 01/06/2026 |
As of 14 July 2026: Bid Abstract posted. As of 29 June 2026: Amendment 0003 posted. As of 29 June 2026: Amendment 0002 posted. The New York District (NAN) of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Hudson River Federal Navigation Project. The dredged material shall be transported to and placed at the federally approved Historic Area Remediation Site (HARS) located at the New York Bight Apex in the Atlantic Ocean. The proposed maintenance dredging will require the removal of approximately 200,000 cubic yards of critical shoals from the Federal Navigation Channel (FNC) at Haverstraw Bay, NY. The dredge area is located at RM 35 - 40 of the Hudson River and is approximately 60 miles from the HARS. Dredging is required to a depth of -32 feet Mean Lower Low Water (MLLW) datum plus 1-foot allowable over depth. The dredge material is expected to consist primarily of silt and clay. Dredging at the Haverstraw area will require the use of a mechanical dredge with a closed clamshell environmental bucket. The Contractor may also require the use of hopper barges, tugboat(s) and attendant plant(s) to perform dredging, transport and unloading/placement operations. All necessary permits required for the dredging and dredged material placement will be provided by the Government. The Contractor will be required to meet all conditions pertaining to dredging and dredge material placement as specified in these permits. Water Quality Certification restrictions prohibit performing any in-water dredging work earlier than August 15th or later than October 31st. The Contractor will be required to commence work within five (5) calendar days after receipt of the Notice to Proceed and shall prosecute work diligently to substantially complete all work within the time periods provided. Plans and Specifications for the subject project will be available June 2026, with bid opening on/about July 2026. It is the intention of the Government to award on Aug 2026 and issue the NTP on/about 10 Aug 2026.Liquidated Damages are expected to be $2,015.00 per calendar day of delay until all work under the contract is accepted. | 79% | Solicitation | 07/14/2026 |