Notice ID: 81b2e05824cf419bb09ee8ebd72ff7f4Award NoticeAwardedArchived
Atlantic Intracoastal Waterway (AIWW) Snows Cut Shoreline Erosion Bank Stabilization
Awarded on July 16, 2026. The description is published on SAM.gov: Full description on SAM.gov.
Awarded tounder W912PM26CA015 (source: SAM.gov award notice)• $7.0M
Overview
- Posted
- July 16, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST WILMINGTON.W074 ENDIST WILMINGTON
- Place of performance
- Norfolk, Virginia
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jul 16, 2026
- Award amount (SAM.gov award notice)
- $7.0M
Identifiers
- Solicitation number
- W912PM26CA015
- Notice ID
- 81b2e05824cf419bb09ee8ebd72ff7f4
- Award number (PIID)
- W912PM26CA015
Description
No description in the SAM.gov data feed for this notice.
Award Overview
Award Number
W912PM26CA015
Award Amount (SAM.gov award notice)
$7.0M
Award Date
Jul 16, 2026
Awardee
Awardee UEI
ECJEACNDYMC6
Awardee CAGE Code
0FJP0
Awardee Address
Charleston, SC 29492, UNITED STATES
Line Item Number
W912PM26CA015
Original Solicitation
Notice ID: 81b2e05824cf419bb09ee8ebd72ff7f4
Posted Date: Jul 16, 2026
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $320.4KSigned Jan 30, 2026
- $320.4KSigned Jan 6, 2026
- $320.4KSigned Dec 4, 2025
- $320.4KSigned Dec 1, 2025
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Rosalind Shoemaker
Documents
Files (2)
Links (4)
- PIEE Solicitation Module Link for W912PM26BA001piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Solicitation
Atlantic Intracoastal Waterway (AIWW) Snows Cut Shoreline Erosion Bank Stabilization
- 4Version 4Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Atlantic Intracoastal Waterway (AIWW) Snows Cut Shoreline Erosion Bank Stabilization
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a pre-solicitation notice. This is NOT a solicitation. Do NOT submit proposals or questions in response to this notice. It is anticipated that the solicitation will be posted on Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ by the end of November 2026. The solicitation is anticipated to be posted for 30 calendar days. The U.S. Army Corps of Engineers (USACE) Norfolk District (NAO) intends to issue an Invitation for Bid (IFB) acquisition for the NASA Wallops Shoreline Breakwaters Project in Accomack County, Virginia. This procurement will be conducted in accordance with FAR Part 14, Invitation for Bid (IFB). The Government intends to award a firm-fixed-price (FFP) contract. The requirement will be solicited as a 100% small business set aside. The applicable NAICS code is 237990, Other Heavy and Civil Engineering Construction (Dredging and Surface Cleanup Activities), with a small business standard of $45 million. In accordance with DFARS 236.204 - Disclosure of the Magnitude of Construction Projects, the magnitude of construction is between $10,000,000 and $25,000,000. DESCRIPTION OF WORK The U.S. Army Corps of Engineers – Norfolk District is seeking eligible firms capable of constructing breakwaters along the beach of Wallops Island. The number of proposed breakwaters for this project will be between two to four and placed approximately 200 feet offshore (from Mean High Water elevation). Each breakwater will be constructed of Type II rip rap for armor stone and VDOT Class III stone for core stone. The weight of material for each breakwater is approximately 10,000 tons. Breakwaters are to be placed on 12-inch-thick marine mattress with geotextile fabric. Water depths for breakwater placement range between -9.5 ft and -12.0 ft NAVD88. Each breakwater will be constructed to a crest height of +7 ft NAVD88. Material for breakwaters may be transported to the project site either by land or sea. Construction of breakwaters may occur either by land or sea. Various work restrictions are expected due to active rocket launches within the vicinity of the project site, which will require all construction activities to stop and personnel to vacate the premises for hours to day(s). The construction completion date will be approximately 325 calendar days from the issuance of Notice to Proceed (NTP). Contractors will be required to submit bid bonds documents with the proposal. The successful awardee will be required to provide 100% payment and performance bonds for the project. The effort will be solicited and awarded utilizing the Sealed Bid procedures under FAR Part 14. Anticipated solicitation issuance time frame is on or about the end of November 2026. THIS PROJECT IS A 100% SMALL BUSINESS SET ASIDE PROCUREMENT INVITATION FOR SEALED BID. The Government intends to award a firm fixed price contract using INVITATION FOR BID WITH PRE-AWARD SURVEY and procedures outlined in FAR 36 and FAR 14. Pre-award survey will determine contractor responsibility in accordance with FAR 9.104. Bidders will be evaluated on both pre-award survey and conformance to the solicitation and price. The Government reserves the right to reject any or all Bids; and to award the contract to other than the lowest total price and to award to the bidder submitting the lowest bid determined by the Government to be responsible. Bid bonds will be required with bid submittals. In addition, the awardee must be found responsible in accordance with FAR 9.1. The below Pre-Award Survey Information will be requested of the apparent low offeror. This information is not required to be responsive to the Invitation for Bid. a) Current commitments and expected dates of completion. b) One (1) signed bank reference demonstrating adequate financial resources. If bidder’s firm has a line of credit – provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required). c) The bidder shall provide the latest three (3) complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. Definitive Responsibility Crieteria: This requirement will use Definitive Responsibility Criteria (DRC) which are specific and objective standards established to inform the Contracting Officer. In accordance with FAR 9.104. These criteria will be used to assess whether the apparent low bidder can demonstrate the expertise and specialized facilities needed for adequate contract performance. The inability of a contractor otherwise eligible for award to demonstrate minimally acceptable experience as measured by the DRC may result in the Contracting Officer determining the contractor is not responsible. The Definitive Responsibility Criteria will assess the following work items: 1. The apparent low bidder shall provide one documented experience of underwaterplacing at least 5,000 square yards of geotextile fabric or marine mattresses within the last 7 years. 2. The apparent low bidder shall provide documented experience proving successfully built at least one marine stone structure of at least 15,000 tons within the last 7 years. This notice does not constitute an invitation for bid. The IFB and accompanying documents will be issued electronically and will be uploaded to the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ on or about the end of November 2026. Notification of any changes to this pre-solicitation will only be made on this website. Therefore, it is the offerors responsibility to check the website regularly for any posted changes to the pre-solicitation notice, release of the solicitation, specification, drawings, and all subsequent amendments. Telephone calls or written requests for the IFB package will NOT be accepted. Prospective bidders are responsible for monitoring at https://piee.eb.mil/ to respond to the solicitation and any amendments or other information regarding this acquisition. IT IS THE SOLE RESPONSIBILITY OF THE OFFEROR TO CONTINUALLY VIEW THE WEBSITE FOR CHANGES. No hard copies will be available. Prospective bidders are responsible for monitoring SAM.gov to respond to the solicitation and any amendments or other information regarding this acquisition. Prospective bidders are required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment of any contract. NOTE: Online Representations and Certifications Applications apply to this solicitation. Inquires must be directed to ProjNet in accordance with the forthcoming Solicitation document. | - | Pre-Solicitation | 11/24/2026 |
Amendment 0006: An amendment has been made to Solicitation W9123626BA0008. Please see attachment SF30, Solicitation Amendment W9123626BA008_0006, extending the bid due date and bid opening date. The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the Design-Bid-Build construction of maintenance requirements at the Fort Eustis Dredge Material Management Area (FEDMMA), located at JBLE - Eustis with provisions to include Regrading/raising the disposal site berms to an elevation of 36 ft. The berms are currently at elevation 34 ft and have settled in a few places to below 34 ft. The work will also include the relocation of two existing spill boxes 50 - 60 feet into the disposal site. The existing access dirt and stone access ramp will need to be regraded, as well, to meet the new top-of-berm elevation. | - | Solicitation | 12/01/2026 |
The U.S. Army Corpos of Engineers (USACE), Norfolk District hosted a Virtual Industry Day event on 18 November 2025, from 10:00 a.m. to 11:00 a.m. for the dredging industry contractors interested in the aniticipated James River Maintenance Dredging IDIQ contract and seed project. Attached are the files for Attendance, Scope Presentation, and the Q&A session. POC: Susan Ellis, Contract Specialist at susan.k.ellis@usace.army.mil and Nikki Kirtsey, Contracting Officer at tiffany.n.kirtsey@usace.army.mil | - | Special Notice | 11/24/2026 |
10/30/2026 - Dear Participants, Thank you for your active participation and invaluable support during our Norfolk CSRM PH1A Industry Day! We hope you found the session informative and walked away with valuable insights about our ongoing initiatives. To help you stay connected and informed, we have compiled the event materials for your reference: Industry Day Slides - Attached for you review and future reference. Industry Day Handout - Attached for your review and future reference. Session Recording - Watch the full presentation on YouTube--link provided below! Attendance Sheet - Now updated and attached to this record. Questions FROM Industry - Responses pending. Please continue to follow our program updates as we move forward. We appreciate your continued partnership and look forward to working with you on future milestones! REMINDER: We are still accepting responses for our Questions TO Industry, see attached below. 10/20/2026 - Questions TO Industry added as attachment. Response requested NLT 04 NOVEMBER 2026. 10/07/2026 - Update made to the Eventbrite attachment to remove FAR reference 36.3, which is a reference to DB and is not applicablle to this procurement. The U.S. Army Corps of Engineers (USACE) Norfolk District is scheduled to host an “Industry Day” event on October 29, 2026, from 9:30 a.m. to 11:30 a.m., Eastern Daylight Time (EDT) for construction contractors interested in the Norfolk CSRM Phase 1A Project. The event will provide an opportunity for Large and Small Business contractors to learn about the upcoming construction project. The one-day event will include a presentation encompassing a brief overview of the Norfolk CSRM program, Phase 1A contracts with a focus on Phase 1A Floodwall SATOC, followed by a live Q&A session. Please submit questions by close of business (COB) on 22 October to provide for a productive discussion (see below instructions to submit questions). Due to interests in the project and space constraints, participants may attend in-person or virtually. The Industry Day will be held at the USACE Norfolk District Building (803 Front Street, Norfolk, VA 23510) on the first floor. Call-in information will be sent to participants prior to the event. Please see attached document for more information on the project and how to RSVP. | - | Special Notice | 10/22/2026 |
The U.S. Army Corps of Engineers, Kansas City District, anticipates issuing Request for Proposals No. W912DQ27RA004 for a total small-business set-aside Multiple Award Task Order Contract (MATOC) supporting the Missouri River Bank Stabilization and Navigation Project. The requirement includes the repair, modification, and construction of river-training structures, including dikes and revetments, through placement of quarry-run stone and excavation of notches. Work will be performed by floating plant along the Missouri River between River Miles 0-542. The scope of work includes, but is not limited to, the construction, modification, and repair of stone dikes and revetments; bank paving and hard points; revetment overlays; and excavation of notches. The work requires the capability of mobilizing, loading, and unloading barges from accessible quarries with graded stone along the Missouri River. Structures are located between the high banks of the Missouri River to include side channel chutes. All work to be performed will be completed by floating plant as no land access will be available. Stone is typically placed by way of track-hoe from a work barge. Contractor equipment shall be capable of accessing designated structures in water depths of four feet or greater.The Government anticipates awarding four (4) to five (5) firm-fixed-price indefinite-delivery, indefinite-quantity (IDIQ) contracts within the MATOC. The Government also anticipates awarding one concurrent seed task order within the MATOC pool. The MATOC will have a shared aggregate maximum capacity of $50,000,000 for all awards, consisting of a three-year base ordering period and two one-year option periods. The minimum guarantee is $2,500 for each awarded IDIQ contract.This acquisition is a total small-business set-aside under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. The applicable small-business size standard is $45 million.The solicitation is anticipated to be issued on or about January 2027. The solicitation will establish the proposal due date and time; the Government anticipates allowing approximately 30 calendar days for proposal submission. A bid guarantee is required with the seed task order proposal in an amount equal to 20 percent of the proposed seed task order price or $3,000,000, whichever is less. The successful seed task order awardee will be required to furnish performance and payment bonds, each in the amount of 100 percent of the seed task order award amount, before issuance of the Notice to Proceed. Currently, a Pre-Solicitation Conference is not scheduled. If the Government decides to hold a conference, this announcement will be amended accordingly.The solicitation will use a best-value tradeoff source-selection process. The Government intends to award without discussions but reserves the right to conduct discussions if determined necessary. The solicitation will identify the official posting location and the authorized electronic proposal-submission method. Electronic proposals will be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. Offerors are responsible for establishing and maintaining the required PIEE access, including the Proposal Manager role, sufficiently in advance of the proposal due date.Notice is given that it has been determined a consolidation of contract requirements is necessary and justified for this action. The determination will be published with the solicitation.Offerors must maintain an active System for Award Management registration and current representations and certifications, as required by the solicitation and applicable regulations.Prospective offerors are responsible for monitoring the official posting location for amendments and other updates.Prospective offerors shall submit contracting and technical questions through ProjNet Bidder Inquiry. The solicitation will provide the Bidder Inquiry Key and establish the deadline for questions. The Government will address questions through formal solicitation procedures. | - | Pre-Solicitation | Open |
Additional Details
Solicitation Number
W912PM26CA015
Archive Date
Jul 31, 2026
Office Address
WILMINGTON, NC, 28403-1343