GovChime
Notice ID: d1b5609b14c146d8b1c88e9ff2a85776SolicitationArchived

Additional RFI's for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado

Archived on October 3, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM MDT
Posted
September 15, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
334519: Other Measuring and Controlling Device Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH PACIFIC.W075 ENDIST ALBUQUERQUE
Place of performance
Albuquerque, New Mexico, 87109
Last updated
Nov 8, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912PP25QA044
Notice ID
d1b5609b14c146d8b1c88e9ff2a85776

Description

Weather Station Upgrade:

  • Abiquiu Lake Dam, New Mexico
  • Cochiti Lake Dam, New Mexico
  • Conchas Lake Dam, New Mexico
  • John Martin Lake Dam, Colorado
  • Santa Rosa Lake Dam, New Mexico
  • Trinidad Lake Dam, Colorado

In accordance with these specifications the Contractor must supply all plant, labor, materials, appurtenances, equipment, shop facilities, supervision, tools, staging, and any other items necessary to procurement, installation, programming, and configuration of updated meteorological monitoring system equipment. The system will consist of a new weather sensor suite measuring key parameters including, but not limited to, temperature, precipitation, wind speed and direction, and solar radiation. Data will be collected by a satellite linked data logger and transmitted via a GOES satellite antenna to the National Weather Service (NWS) in accordance with established data submission standards. Additionally, a new evaporative gauge with an automatic refill system will be installed to provide accurate measurements of evaporation rates. This system upgrade is critical for enhancing flood risk management capabilities, improving the accuracy of hydrological modeling, and supporting informed decision-making regarding reservoir operations and dam safety. The contractor will be responsible for all aspects of the installation, including site preparation, equipment mounting, electrical connections, data configuration, system testing, and documentation, ensuring full compliance with USACE and NWS regulations and cybersecurity protocols. The Contractor must verify all existing conditions, dimensions, and quantities prior to start of work.

Current weather monitoring infrastructure is aging and has limited measurement capability. These accuracy improvements will enhance assessment of hydrologic conditions and improve prediction and response to extreme weather events. This project addresses this need by upgrading and expanding the existing weather station network, ensuring consistent, high-quality data transmission to the NWS via GOES satellite, and providing critical input for improved hydrologic modeling, ultimately bolstering the USACE’s ability to fulfill its mission through cooperative efforts with the NWS.

***Please remember to sign (aknowledge) each amendment and include in submission of quote.*** 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • Additional RFIs (Santa Rosa Site Specific).pdf

    64 KBAdded in Solicitation version 5Posted
    Download
  • Solicitation Amendment W912PP25QA0440002 SF 30.pdf

    3.1 MBAdded in Solicitation version 3Posted
    Download
  • Solicitation Amendment W912PP25QA0440001 SF 30.pdf

    3.3 MBAdded in Solicitation version 2Posted
    Download
  • RFIs.pdf

    75 KBAdded in Solicitation version 2Posted
    Download
  • Solicitation - W912PP25QA044.pdf

    2.9 MBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado

    Notice 100e8b70fe554ba5b030609b0b9dd240 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    AMD 0001 & RFI's for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado

    Notice 731d2989a3684cbe804ad28617099c67 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    AMD 0002 (Submission Instructions) for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado

    Notice be13a4da2f084d33af8b27ca01502949 on SAM.gov

  4. 5
    Version 5SolicitationArchivedCurrent

    Additional RFI's for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado

    Notice d1b5609b14c146d8b1c88e9ff2a85776 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912PP25QA044

Archive Date

Oct 3, 2025

Office Address

ALBUQUERQUE, NM, 87109-3435