GovChime
Notice ID: 18d407f353c64bfda512abcea285eb7aPresolicitation

Forage Animal Production Research Laboratory

Archived on March 11, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−05:00
Posted
June 8, 2021
Notice type
Presolicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST LOUISVILLE
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912QR21R0029
Notice ID
18d407f353c64bfda512abcea285eb7a

Description

Architect/ Engineer Indefinite Delivery Indefinite Quantity Contract for ARS USDA Forage Animal Production Research Laboratory, Lexington, KY 1. SYNOPSIS: Architect and Engineering services, procured in accordance with PL 92-582 (Brooks A-E Act) and FAR Part 36, are required to plan and design a new ARS USDA Forage Animal Production Research Laboratory and other associated improvements in the vicinity of Lexington, Kentucky. Work will be considered to be performed primarily at the Architect/Engineer’s (A/E) office. However, site visits and meetings are anticipated to be conducted at facilities owned by the University of Kentucky. These meetings may be held in facilities at the main University of Kentucky Lexington campus or in facilities owned by the University of Kentucky in the areas surrounding Lexington Kentucky that support agricultural research. Awards will be made as Firm-Fixed-Price Task Orders during the period of performance. The total combined contract capacity under the Single Award Task Order Contract (SATOC) pool is not to exceed $10,000,000 over a five-year period. This is a five-year contract, with no option years. There is no limit on the value of individual task orders, but the total value of task orders awarded will not exceed the overall SATOC capacity. Work will be issued by negotiated firm-fixed-price task orders. The Firm that is selected for negotiation of a contract may be required to submit additional information at a later time for use in the evaluation of qualifications for specific Task Orders. The period of performance for task orders issued under these contracts may extend beyond the five-year ordering period. In accordance with FAR 36.604 and the supplements thereto, and upon final acceptance or termination, all task orders above $35,000 will receive a performance evaluation. A performance evaluation may be prepared for lesser task orders and interim performance evaluations may be prepared at any time. Performance evaluations will be maintained for use in future source selections for Architect-Engineer Services. Amendment 0001 ***************************************************************** ****************************************************Amendment 0001 Evaluation for Contract Award Selection Criteria - The selection criteria in descending order of importance are listed below. Specialized Experience/Past Performance (Sections E, F and G from the submitted SF330) Design Quality Management Plan (Section D and H from the submitted SF330) Submission Requirements: Offerors must submit one (1) electronic copy of the SF 330, Part l, and one copy of the SF330, Part II for the prime firm. Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Offerors must submit a current and accurate SF 330, Part II, for each proposed sub-consultant. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting (866) 705-5711, or via the internet at http://fedgov.dnb.com/webform. The proposal shall be submitted as one file using Adobe Acrobat (.pdf). Font size shall be 10 or larger on white letter-sized paper (8 inches by 11 inches). The SF 330 will be no longer than 50 pages in length (excluding the SF 330, Part IIs). Resumes in Section E can be no more than two pages in length, and individual projects in Section F can be no more than three pages in length. Section H shall be 10 pages or less in length and shall include the requested information as part of this solicitation. Any additional information included in the proposal not specifically required may not be evaluated or considered. Each printed side of a page will count as one page. Dividers, bindings and cover sheets do not count against the total page count of the response to the RFP. Do not furnish design portfolios, prints, magazines, newspaper clippings, or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows: Send an email to the Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date. Josh Westgate, Contract Specialist at Joshua.K.Westgate@usace.army.mil You will receive an email with the link to submit your drop-off. The link will be provided no later than two (2) business days prior to the proposal due date. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter W912QR21R0029-FIRMNAME. Click Upload button to send documents. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required). File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below. File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: W912QR21R0029-FIRMNAME Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see example above. File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor. Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208. Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked). Any information presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e). The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations. Additional instructions and clarifications for SF330: SF330 Section D: The offerors shall submit an organizational chart as required by SF330 Section D. Offerors can submit a folded 11”x 17” organizational chart as part of their submission. This will be considered only one page of their submission. SF330 Section E: Offerors shall only provide individual resumes in SF330 Section E for each of the individuals listed below in lines 1 through 3. Individuals included in SF330 Section E must possess the certifications and registrations listed below and must have performed i n their respective role (i.e. project manager, architect designer, etc.) on projects similar to this solicitation; this shall be demonstrated in Block 19. Proposals that strongly demonstrate, in lieu of just listing, the specialized experience and technical competence will be evaluated more favorably. For all designer roles, the resume shall clearly indicate features of work of the project for which the individual was the legal designer of record. Project Manager, Registered Architect or Professional Engineer, Indicate years of experience leading multidisciplinary teams (Architect, Civil/Site, Mechanical, Electrical, Plumbing, Structural) in vertical construction projects. Lead Architect/Designer, Registered Architect Lead Mechanical Engineer, Registered Professional Engineer SF330 Section F: In this section, the offeror shall provide up to five (5) previous projects which are similar in size and/or scope to this solicitation. Offerors may use the examples of format that are included at the end of this document or they may use their own format. However, at a minimum, the information that is indicated on the example forms must be clearly presented on any project detail sheet that is used. Projects included in SF330 Section F will be considered more relevant if construction is substantially complete, and projects that achieved substantial completion more recently will be considered more relevant. Substantially complete is defined as a construction project and/or facility that can be used for its intended purposes. Projects considered similar in scope to this project include complex university agricultural research facilities that include greenhouses or headhouses and agricultural research facilities associated with industry research that include greenhouse or headhouses. Projects considered similar in size to this project include projects similar in scope that contain 30,000 Square Feet (SF) of total space with 10,000 SF of laboratory/research space. Of the up to five projects included in SF330 Section F, a minimum of two must be fully designed by the offeror. Base MATOC or IDIQ contract awards may not be used as projects, only individual task orders that resulted in actual design effort from these base MATOC and IDIQ contracts may be used. For all projects included in Section F, the offeror must indicate what percentage by dollar value of the overall work was self-performed by the team being submitted as a part of this SF330. This percentage shall only include the work that was performed by individuals who were employed by the firms listed in this SF330, even if the work was performed as a part of a joint-venture or a team of A-E contractors. Also in Section F, the offeror shall indicate at least one (1) reference for each project that was identified for project specialized experience/past performance. Reference information must include project name, location, at least one point of contact, telephone number, and email address (for the point of contact). Also include any ratings, letters, awards, etc. that support past performance on these projects. Past Performance Questionnaires attached to this document are provided as an example of the information that shall be provided by the Offeror to identify business references that can be contacted for the purpose of verifying past performance. A blank Past Performance Questionnaire Template is attached for your convenience and reference. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. Performance evaluation information will not be counted against the page limits previously stated. SF330 Section G: It is acceptable for Section G to be 11”x17”. SF330 Section H: In SF330 Section H, each offeror shall produce a detailed Design Quality Management Plan including the following items: An explanation of the firm's project specific management approach. This would include an explanation of the firm’s management of sub-consultants (if applicable). Design Quality Control procedures for the completion of plans, specification, design analysis and electronic documents Risk management and risk mitigation processes, as well as procedures to ensure that internal resources are not over committed. This could include a discussion of project specific risks and potential mitigation processes that might be utilized to manage those risks. Procedures for performing either planning and/or design charrettes. Amendment 0001 ***************************************************************** In SF 330 Section H, all large businesses shall present a Small Business Subcontracting Plan in accordance with Public Law 95-507 as part of the response to this RFP. The number of pages of the Small Business Subcontracting Plan do not count against the total page count for the response to the RFP. **********************************************************************Amendment 0001 Evaluation Criteria Content and Rating. Proposals shall be specific and complete in every detail and shall contain the information necessary to properly assess and evaluate the Contractor's capability to perform the specified contract services, based upon the following factors: Specialized Experience/Past Performance Design Quality Management Plan The information provided on the SF330s will be used to evaluate each Offeror’s proposal. The Government will evaluate the proposals in accordance with the criteria described herein, and award an Indefinite Delivery Indefinite Contract (IDIQ) contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and who is deemed the most highly qualified. Task orders will be negotiated against the IDIQ contract. Proposals will be evaluated in accordance with the factors contained in the following paragraphs. Specialized Experience/Past Performance. Offerors will be evaluated on the following: The Source Selection Evaluation Board (SSEB) will evaluate the relevancy of the submitted projects in comparison to the project description for this solicitation. Projects that are determined to be very relevant will receive more consideration than projects that are considered to be relevant or somewhat relevant. The government will also evaluate how well the offeror performed on the projects that were submitted as evidence of specialized experience/past performance. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references. In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. The Government will consider information in the Past Performance Questionnaires completed by personnel for whom the Offeror has performed work, and any information obtained from other sources. Evaluation of specialized experience/past performance will be based on subjective assessment based on a consideration of all relevant facts and circumstances. It will not be based on absolute standards of acceptable performance. The Government's conclusions about the overall quality of the Offeror's past performance may influence the selection of the proposal. Offerors may receive additional consideration if they have successfully completed previous design experience work with either the USDA or the USACE. Offerors may also receive additional consideration for professionals identified in Section E. that have worked previously on any of the submitted projects from Section F. Offerors that demonstrate experience with planning and/or design charrettes, especially on projects that involve scientific research or construction project in a University setting may receive additional consideration. Offerors that demonstrate expertise in the planning and design of complete veterinary facilities that could support the housing, monitored feeding, removal of waste, medicating, hoisting, euthanizing, and diagnosing of small and large farm animals may also receive additional consideration. Design Quality Management Plan. Offerors will be evaluated on the following: Design Quality Management Plan narratives will be evaluated based on the level of understanding of the design process and the involvement the lead designers will have in the management, oversight, control, and coordination of the design work performed during the design of the project. Narratives that demonstrate a clear understanding of the design process involved in agricultural research facilities and provide a thorough approach for successfully managing the specialized requirements for agricultural research facilities may receive additional consideration by the SSEB. The offeror’s organizational chart will be evaluated based on the clarity, adequacy, and capabilities for successfully managing the solicited project. Evaluation Process The SSEB will be comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel. Offerors are advised that the evaluation and rating of proposals will be conducted in strict confidence. Reviews of non-price factors will be conducted prior to any rates or pricing being submitted. The number and identities of offerors will not be revealed to anyone who is not involved in the evaluation and award process or to other offerors. The evaluation process will consist of the following two parts: Specialized Experience and past performance evaluation The SSEB will evaluate and rate the proposals against the solicitation requirements. Using the relevancy ratings and confidence assessments defined in the tables below, these non-price factors will be evaluated based on the extent of recent and relevant past experience, and the quality of the offeror’s performance during that experience. Design Quality Management Plan The SSEB will evaluate and rate the proposals against the solicitation requirements. Amendment 0001 Changes Project Description - Removed for clarity. Section H - Removed reference to a Small Disadvantaged Subcontracting Plan Amendment 0002 Changes 1. Added More Questions and Answers

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912QR21R0029
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 4×
    Pre-SolicitationCurrentJan 25, 2021

    Forage Animal Production Research Laboratory

    Notice 18d407f353c64bfda512abcea285eb7a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Updated to extend the proposal response date to 5 November 2025. ***** Amendment 0002 has been published****** Architect/Engineer (A/E) services for District-wide Federal Bureau of Prisons (BOP) projects primarily within the Mid-Atlantic Region mission boundaries.
71%
Combined Synopsis11/05/2025
CONTRACT INFORMATION: This contract is being procured in accordance with the Selection of Architect Engineers Act, the provisions outlined in FAR Subpart 36.6 and the procedures provided in Engineer Pamphlet (EP) 715-1-7, section 3-16. Architect-Engineers (A-E) will be selected for negotiations based on demonstrated competence and qualifications for the type of professional services required. Work will be performed for the Corps of Engineers and its customers to include other Government agencies, and State and local entities. Orders may only be issued for Flood Control Dam and Levee work. Work will predominantly occur within the boundaries of the continental United States and its territories though limited work may potentially occur outside the continental United States when such work is assigned to the U.S. Army Corps of Engineers (USACE). Architect-Engineering services are required for diverse types of Flood Control Dam and Levee Safety Civil Works and MILCON support projects assigned to or by the Dam Safety Modification Center (DSMC). The contract will also provide capacity within the USACE Flood Control Dam and Levee Safety community requesting Architect-Engineering assistance through the Dam Safety Modification Center. A minimum of (3) firm-fixed price indefinite delivery contracts will be negotiated and awarded with a base period of one year and four option periods, one year each. The award amount will not exceed $250,000,000.00 combined capacity over the life of the contracts and work will be issued by negotiated firm-fixed price task orders with the most highly qualified in the pool selected via the Task Order Requirements Notice Process. Task Orders may be awarded between $2,500 and $120,000,000 in value. The contracts are expected to be awarded in July 2026. North American Industrial Classification System code is 541330, which has a size standard of $25.5 million in average annual receipts. This announcement is open to all businesses regardless of size. Large businesses must comply with FAR clause 52.219-9 (DEVIATION 2018-O00018) regarding the requirement for a subcontracting plan on the part of work it intends to subcontract; this is only required by the most highly qualified A-Es and is not part of the submittal for this synopsis. The A-Es found most highly qualified will be required to submit a Small Business Subcontracting Plan meeting the statutory small business limits of 23% overall, 5% small disadvantaged (including 8(a)), 5% woman owned and 3% each for Service-Disabled Veteran-Owned Small Business, and HUBZone businesses prior to award. The A-Es corporate Quality Control Plan is required with this submittal and will be evaluated as outlined in factor E. Each task order with site work will require a Site-Specific Safety and Health Plan and all require an individual task order specific Quality Control plan. To be eligible for contract award, each A-E must be registered in the System Award Management (SAM). Register via the SAM website at https://www.sam.gov/portal/public/SAM. Multiple contracts are being awarded under this synopsis, at least the three most highly qualified firms will each receive a Request for Proposal to allow development and submission of a price proposal. Task Orders will be awarded in accordance with the Selection of Architect Engineers Act guidance to ensure fair distribution of awards using the Task Order Requirements Notice procedures to the most highly qualified out of the pool of awarded contractors. PROJECT INFORMATION: The A-E services to be provided under this contract will be to provide Engineering Services for Flood Control Dam and Levee Safety efforts nationally. The A-E services will be multidisciplinary (see paragraph on Specialized Experience and Technical Competence below) in nature to support our mission to plan, design, construct, oversee construction, modify, operate, and control flood control reservoirs, dams, and levees. The A-E shall provide the appropriate personnel, materials, equipment, management, quality, and cost controls to perform all phases of engineering, and architectural services to include, but not limited to, planning studies; engineering investigations; risk assessments; designs; reports; construction plans and specifications; preliminary cost estimates; general construction and engineering type surveys and related services; Computer-Aided Design and Drafting (CADD); and construction consultation and inspection/quality assurance including engineering during construction. Work shall be accomplished in full compliance with established USACE manuals, policies, standards and practices and other professional practices and standards as necessitated by project conditions or job requirement. CADD information shall conform to paragraph (E) below. Capability for scanning hard copy into the CADD and 3D design system is also required. Work may require using the metric system. All work shall be prepared to be compatible with MS Office 365, and all specifications shall use SPECSINTACT format. Services shall also include any or all of the following based on need: Site characterization studies, Engineering evaluations and analyses in support of hydrologic (e.g. Inflow Design Flood) and seismic loading, consequence studies, Dam and Levee screenings, feasibility studies, preliminary and/or final designs, value engineering, constructability reviews, preparation of construction plans and specifications, or other analyses or studies related to the dam and levee safety programs. Services will be required to evaluate flood control dams and levee appurtenances including bridges, gates, spillways, pumping stations and other appurtenant structures attached to dams and levees as necessary to characterize the project. Earth embankment and foundation seepage analyses, inspection, assessment and design of concrete hydraulic structures and hydraulic steel structures associated with dam and levee safety projects. The A-E will be required to provide dam and levee safety experts to participate in highly complex dam and levee safety risk based Independent Expert Peer Reviews (IEPR), Expert Opinion Elicitations (EOE), for consultation, review of in-progress dam and levee safety design and construction activities, completed dam and levee safety construction, Risk Assessment and Analyses, Potential Failure Modes Analysis (PFMA), and numerical modeling of features associated with dam and levee safety projects. SELECTION CRITERIA: The selection criteria for this particular contract are listed below in descending order of importance. Criteria (i) through (vi) are primary. Criteria (vii) and (viii) are secondary and will only be used as a tiebreaker among firms that are essentially technically equal. i. Specialized Experience and Technical Competence: Firms must demonstrate specialized experience allowing objective evaluation and ranking of A-E capabilities on the following criteria/elements, which are listed in descending order of importance. For the proposed team, provide a maximum of ten (10) specific, completed projects that best illustrate overall team experience. Projects submitted shall have been completed as the prime A-E and be within the past five (5) years from the date qualifications submittals are due. Include a brief narrative for each project. Discuss conformance to scope, adherence to performance schedules, limiting changes, and delivering a product that satisfies the requirements. The A-E must only describe its exact efforts on the project and not appear to have made more effort than it did and be specific about firms effort. Dam Safety Design and Analysis to include experience with Risk Assessments, Issue Evaluation Studies, Dam Safety Modification Studies, Dam Modification Alternatives Development and Evaluation, Design Documentation Reports, Rehabilitation Reports, Plans and Specifications, Engineering Support During Construction, Geotechnical studies, Hydrologic and Hydraulic studies to include Computational Fluid Dynamics, Inflow Design Flood modeling, sediment transport modeling, scour evaluations and modeling, and cavitation assessments and modeling. Flood Damage Reduction Engineering to include experience with Planning and Design of floodwalls, levees and appurtenant structures, Design Documentation Reports, Rehabilitation Reports, Hydrologic and Hydraulic Studies, Plans and Specifications, Engineering Support during Construction. Engineering during construction and construction project evaluation of work in progress to report to the USACE work of others meeting contract requirements. Civil Engineering to include experience in civil site layout (preparation of applications for NPDES, as well as, construction permits, performing civil site layout to derive a reasonable and logical sequence of construction activities).Other Engineering, Architectural and Planning Services in support of Flood Control Dam and Levee Safety (each of equal importance) to include: Hydrologic and Hydraulic Studies Structural Analysis and Design Geotechnical and Engineering Geology Analysis and Design Electrical/Mechanical Design and Analysis Design of Sanitary and Water Projects Design, Inspection and Assessment of Bridges Roadway Design and Analysis Cost development of designs Scheduling of work ii. Professional Qualifications: The evaluation of professional qualifications will consider relevant experience, education, training, professional registration, organizational certifications, and longevity with the firm. The firm should indicate professional registrations/licenses, certifications from commercial organizations, professional recognition, professional associations, advanced training, and specific work experience of key personnel. The firm must staff the necessary Registered/Licensed Engineers, Geologists, Scientists, Architects and Surveyors having professional qualifications and specialized experience to perform and/or oversee that all work is accomplished as required by law and professional engineering architectural and surveying practices. Firms will be ranked on the above qualified registered professional personnel in the following key disciplines: Disciplines in the following group (Group A) are of equal importance: Structural Engineers, Geotechnical Engineers, Geologists, Hydraulic Engineers, Civil Engineers, Mechanical Engineers, Cost Engineers, and Electrical Engineers.Disciplines in the following group (Group B) are also of equal importance but are of lesser importance than the previous group (Group A): Specification Writers, Cost Engineers, Estimators, Engineering Technicians (Draftsmen/CADD Operators/GIS), Sanitary Waste Engineers, Planners, Architects, Professional Surveyors, Environmental Engineers, Environmental Geologists, Biologists (Ecologist), Safety Professionals, Hydrogeomorphologists, Industrial Hygienists and Construction Inspectors/Quality Assurance. Personnel proposed for Dam Safety Design and Analysis shall be shown in the Levels of Experience listed below. Provide appropriate documentation to justify their experience level. Level 1 experience includes five to ten (5-10) years of conventional engineering experience for dam/levee safety planning, engineering, design and/or construction in structural, geotechnical, engineering geology, hydraulic, civil, electrical, or mechanical engineering. Level 2 experience includes ten to fifteen (10-15) years of conventional engineering experience in dam/levee safety, and at least 5 years of risk-based/risk-informed engineering experience in dams and levee systems. Experience must include all experience within Level 1, plus participation on risk analysis teams for dam and levee systems, facilitation or participation in potential failure mode analysis (PFMA), or estimation of conditional probabilities of failure for static, hydrologic, and seismic failure modes, and estimating loss of life and economic consequences. Level 3 experience includes more than fifteen (15+) years of conventional engineering experience in dam/levee safety, and at least 5 years of risk-based/risk-informed engineering experience in dams and levee systems. Experience must include all experience within Levels 1 and 2, plus leading risk analysis teams, leading and/or participating in Expert Opinion Elicitations, and constructing event trees or using risk-based models to estimate risks for dam and levee projects. Experience conducting external peer review, quality control review, and consistency of decision and action review of Risk Analysis Reports and corrective action studies for dam and levee modifications is required. The criteria will include a review of projects submitted to determine relevant experience for both personnel and the firm, as well as Quality Management of engineering products. iii. Capacity: The PDT divided the NTE amount of $249,500,000.00 by the five-year period to arrive at the $49,900,000.00 capacity for the firm to perform within a one-year period in a satisfactory and efficient manner. The evaluation will consider the availability of an adequate number of personnel in key disciplines. The firm should have one point of contact for this contract and demonstrate past/projected-working relationships with subcontractors. Subcontracting with firms with specialized experienced areas is encouraged. Include an organization chart of the key personnel assigned to the contract. Firms should demonstrate strong ability to provide comprehensive program and project management for complex work; strong ability to provide comprehensive complex technical support; ability to provide necessary personnel for expedited, complex and unexpected work; ability to initiate, manage and complete multiple concurrent task orders; ability to meet unforeseen schedule changes and maintain delivery of a quality product on a timely schedule. iv. Past Performance: Past Performance during the past 5 years from the date the synopsis is posted to SAM.gov on similar contracts with respect to cost control, quality of work, ability to work independently and compliance with performance schedules as determined from Contractor Performance Assessment Reporting System (CPARS), FAPIIS data in SAM.gov, and other sources. However, any credible, documented evaluations may be considered, but the government is not required to seek other information on the past performance of a firm if none is available from CPARS. Relevant information to provide includes the following: Similar or equal work in terms of complexity in scope and size. Key personnel, offices, and subcontractors to be utilized on this contract. Firms role in the contract if a team such as a joint venture or prime-subcontractor relationship. Each A-Es past performance will be evaluated individually as well as in a team. The most recent projects will be given preference as they are indicative of current knowledge and abilities. Trends in performance as identified in PPIRS and FAPIIS. Credibility and detail in firms past performance report. Formal federal evaluations will be given more weight. High ratings on former DoD A-E contracts will be given a higher rating. v. Quality Management System: The evaluation will consider the firms Quality Management System. Firms must describe their quality control and quality assurance procedures with any subcontracts and procedures for continual improvement and ensuring customer satisfaction. State any experience with the International Standards Organization (ISO) 9001 standard and the DrChecks automated comment and response system. vi. CADD and Office Automation: All drawings and exhibits for design work, surveying work, drawings, maps, and details to be provided under this contract shall be accomplished and developed using computer-aided design (CAD) software and procedures conforming to the following criteria and most current versions of Target Software: National CAD Standard A/E/C CAD Standard Bentley ProjectWise most current version Autodesk AutoCAD Autodesk Revit Autodesk Civil 3DAutodesk Map 3DAutodesk Inventor Autodesk InfraWorks Autodesk Navisworks Autodesk ReCap Autodesk 3ds Max Bentley ProjectWise InterPlot Server and Client Bentley Open Ground Cloud Windows 11 operating system Microsoft Office Suite 365Adobe Acrobat Professional7z or compatible zip program Micro-Computer Aided Cost Estimating System II (MCACES)Bentley Products Legacy software may be required to convert or utilize documents. Consideration will be given to offerors that indicate compatibility with the above CAD standards, but preference will be given to offerors that demonstrate experience with the above standards. vii. Small Business Participation: SB and SDB Participation: The extent of participation of small businesses (including women-owned, HUBZone, small disadvantaged and service-disabled veteran-owned businesses) measured as a percentage of the total anticipated contracted effort, regardless of whether the small business is a prime contractor, subcontractor, or joint venture partner. viii. Equitable Distribution of DOD Contracts: Volume of DoD A-E contract awards in the last 12-months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including Small Business and Small Disadvantaged Business. SUBMISSION REQUIREMENTS: ALL RESPONSES TO THIS REQUIREMENT SHOULD BE SUBMITTED ELECTRONICALLY. Offerors shall submit SF330 Part I and Part II through the PIEE Solicitation Module at https://piee.eb.mil/ and reference the Solicitation number, W9123726RA007. Electronic submissions shall be maximum 2-pages per individual resumes and maximum 4-pages per project information, front-only, and 12-point, Times New Roman font except where mandated fillable forms require smaller fonts. Not to exceed 200 pages total (past performance is not included in page count). No paper copies, CD, DVD, thumb drives, email, or facsimile will be accepted. Electronic submissions must be received to the Government NLT, 5:00 PM Eastern Time on June 17, 2026. Electronic submissions shall be based on 8.5 x11 page size. The only exceptions are Organization Chart or Experience/Qualification matrix which may be based on a 11x17 page size. Personnel resumes shall be limited to two electronic pages (one page front and back equivalent) per person. Any information on a resume beyond the two electronic pages (one page front and back equivalent) will not be considered. Include the A-Es Cage or UEI number. Solicitation packages are not provided, and no additional project information will be given to A-Es during the announcement period. This is not a Request for Proposal. The POC for this procurement is Lillie V. Bodie, lillie.v.bodie@usace.army.mil.
68%
Combined Synopsis06/17/2026
CONTRACT INFORMATION: This contract is being procured in accordance with the Selection of Architect Engineers Act, the provisions outlined in FAR Subpart 36.6 and the procedures provided in Engineer Pamphlet (EP) 715-1-7, section 3-16. Architect-Engineers (A-E) will be selected for negotiations based on demonstrated competence and qualifications for the type of professional services required. Work will be performed for the Corps of Engineers and its customers to include other Government agencies, and State and local entities. Orders may only be issued for Flood Control Dam and Levee work. Work will predominantly occur within the boundaries of the continental United States and its territories though limited work may potentially occur outside the continental United States when such work is assigned to the U.S. Army Corps of Engineers (USACE). Architect-Engineering services are required for diverse types of Flood Control Dam and Levee Safety Civil Works and MILCON support projects assigned to or by the Dam Safety Modification Center (DSMC). The contract will also provide capacity within the USACE Flood Control Dam and Levee Safety community requesting Architect-Engineering assistance through the Dam Safety Modification Center. A minimum of (3) firm-fixed price indefinite delivery contracts will be negotiated and awarded with a base period of one year and four option periods, one year each. The award amount will not exceed $250,000,000.00 combined capacity over the life of the contracts and work will be issued by negotiated firm-fixed price task orders with the most highly qualified in the pool selected via the Task Order Requirements Notice Process. Task Orders may be awarded between $2,500 and $120,000,000 in value. The contracts are expected to be awarded in July 2026. North American Industrial Classification System code is 541330, which has a size standard of $25.5 million in average annual receipts. This announcement is open to all businesses regardless of size. Large businesses must comply with FAR clause 52.219-9 (DEVIATION 2018-O00018) regarding the requirement for a subcontracting plan on the part of work it intends to subcontract; this is only required by the most highly qualified A-Es and is not part of the submittal for this synopsis. The A-Es found most highly qualified will be required to submit a Small Business Subcontracting Plan meeting the statutory small business limits of 23% overall, 5% small disadvantaged (including 8(a)), 5% woman owned and 3% each for Service-Disabled Veteran-Owned Small Business, and HUBZone businesses prior to award. The A-E’s corporate Quality Control Plan is required with this submittal and will be evaluated as outlined in factor E. Each task order with site work will require a Site-Specific Safety and Health Plan and all require an individual task order specific Quality Control plan. To be eligible for contract award, each A-E must be registered in the System Award Management (SAM). Register via the SAM website at https://www.sam.gov/portal/public/SAM. Multiple contracts are being awarded under this synopsis, at least the three most highly qualified firms will each receive a Request for Proposal to allow development and submission of a price proposal. Task Orders will be awarded in accordance with the Selection of Architect Engineers Act guidance to ensure fair distribution of awards using the Task Order Requirements Notice procedures to the most highly qualified out of the pool of awarded contractors. PROJECT INFORMATION: The A-E services to be provided under this contract will be to provide Engineering Services for Flood Control Dam and Levee Safety efforts nationally. The A-E services will be multidisciplinary (see paragraph on Specialized Experience and Technical Competence below) in nature to support our mission to plan, design, construct, oversee construction, modify, operate, and control flood control reservoirs, dams, and levees. The A-E shall provide the appropriate personnel, materials, equipment, management, quality, and cost controls to perform all phases of engineering, and architectural services to include, but not limited to, planning studies; engineering investigations; risk assessments; designs; reports; construction plans and specifications; preliminary cost estimates; general construction and engineering type surveys and related services; Computer-Aided Design and Drafting (CADD); and construction consultation and inspection/quality assurance including engineering during construction. Work shall be accomplished in full compliance with established USACE manuals, policies, standards and practices and other professional practices and standards as necessitated by project conditions or job requirement. CADD information shall conform to paragraph (E) below. Capability for scanning hard copy into the CADD and 3D design system is also required. Work may require using the metric system. All work shall be prepared to be compatible with MS Office 365, and all specifications shall use SPECSINTACT format. Services shall also include any or all of the following based on need: Site characterization studies, Engineering evaluations and analyses in support of hydrologic (e.g. Inflow Design Flood) and seismic loading, consequence studies, Dam and Levee screenings, feasibility studies, preliminary and/or final designs, value engineering, constructability reviews, preparation of construction plans and specifications, or other analyses or studies related to the dam and levee safety programs. Services will be required to evaluate flood control dams and levee appurtenances including bridges, gates, spillways, pumping stations and other appurtenant structures attached to dams and levees as necessary to characterize the project. Earth embankment and foundation seepage analyses, inspection, assessment and design of concrete hydraulic structures and hydraulic steel structures associated with dam and levee safety projects. The A-E will be required to provide dam and levee safety experts to participate in highly complex dam and levee safety risk based Independent Expert Peer Reviews (IEPR), Expert Opinion Elicitations (EOE), for consultation, review of in-progress dam and levee safety design and construction activities, completed dam and levee safety construction, Risk Assessment and Analyses, Potential Failure Modes Analysis (PFMA), and numerical modeling of features associated with dam and levee safety projects. SELECTION CRITERIA: The selection criteria for this particular contract are listed below in descending order of importance. Criteria (i) through (vi) are primary. Criteria (vii) and (viii) are secondary and will only be used as a “tiebreaker” among firms that are essentially technically equal. Specialized Experience and Technical Competence: Firms must demonstrate specialized experience allowing objective evaluation and ranking of A-E capabilities on the following criteria/elements, which are listed in descending order of importance. For the proposed team, provide a maximum of ten (10) specific, completed projects that best illustrate overall team experience. Projects submitted shall have been completed as the prime A-E and be within the past five (5) years from the date qualifications submittals are due. Include a brief narrative for each project. Discuss conformance to scope, adherence to performance schedules, limiting changes, and delivering a product that satisfies the requirements. The A-E must only describe its exact efforts on the project and not appear to have made more effort than it did and be specific about firms’ effort. Dam Safety Design and Analysis to include experience with Risk Assessments, Issue Evaluation Studies, Dam Safety Modification Studies, Dam Modification Alternatives Development and Evaluation, Design Documentation Reports, Rehabilitation Reports, Plans and Specifications, Engineering Support During Construction, Geotechnical studies, Hydrologic and Hydraulic studies to include Computational Fluid Dynamics, Inflow Design Flood modeling, sediment transport modeling, scour evaluations and modeling, and cavitation assessments and modeling. Flood Damage Reduction Engineering to include experience with Planning and Design of floodwalls, levees and appurtenant structures, Design Documentation Reports, Rehabilitation Reports, Hydrologic and Hydraulic Studies, Plans and Specifications, Engineering Support during Construction. Engineering during construction and construction project evaluation of work in progress to report to the USACE work of others meeting contract requirements. Civil Engineering to include experience in civil site layout (preparation of applications for NPDES, as well as, construction permits, performing civil site layout to derive a reasonable and logical sequence of construction activities). Other Engineering, Architectural and Planning Services in support of Flood Control Dam and Levee Safety (each of equal importance) to include: Hydrologic and Hydraulic Studies Structural Analysis and Design Geotechnical and Engineering Geology Analysis and Design Electrical/Mechanical Design and Analysis Design of Sanitary and Water Projects Design, Inspection and Assessment of Bridges Roadway Design and Analysis Cost development of designs Scheduling of work Professional Qualifications: The evaluation of professional qualifications will consider relevant experience, education, training, professional registration, organizational certifications, and longevity with the firm. The firm should indicate professional registrations/licenses, certifications from commercial organizations, professional recognition, professional associations, advanced training, and specific work experience of key personnel. The firm must staff the necessary Registered/Licensed Engineers, Geologists, Scientists, Architects and Surveyors having professional qualifications and specialized experience to perform and/or oversee that all work is accomplished as required by law and professional engineering architectural and surveying practices. Firms will be ranked on the above qualified registered professional personnel in the following key disciplines: Disciplines in the following group (Group A) are of equal importance: Structural Engineers, Geotechnical Engineers, Geologists, Hydraulic Engineers, Civil Engineers, Mechanical Engineers, Cost Engineers, and Electrical Engineers. Disciplines in the following group (Group B) are also of equal importance but are of lesser importance than the previous group (Group A): Specification Writers, Cost Engineers, Estimators, Engineering Technicians (Draftsmen/CADD Operators/GIS), Sanitary Waste Engineers, Planners, Architects, Professional Surveyors, Environmental Engineers, Environmental Geologists, Biologists (Ecologist), Safety Professionals, Hydrogeomorphologists, Industrial Hygienists and Construction Inspectors/Quality Assurance. Personnel proposed for Dam Safety Design and Analysis shall be shown in the Levels of Experience listed below. Provide appropriate documentation to justify their experience level. Level 1 experience includes five to ten (5-10) years of conventional engineering experience for dam/levee safety planning, engineering, design and/or construction in structural, geotechnical, engineering geology, hydraulic, civil, electrical, or mechanical engineering. Level 2 experience includes ten to fifteen (10-15) years of conventional engineering experience in dam/levee safety, and at least 5 years of risk-based/risk-informed engineering experience in dams and levee systems. Experience must include all experience within Level 1, plus participation on risk analysis teams for dam and levee systems, facilitation or participation in potential failure mode analysis (PFMA), or estimation of conditional probabilities of failure for static, hydrologic, and seismic failure modes, and estimating loss of life and economic consequences. Level 3 experience includes more than fifteen (15+) years of conventional engineering experience in dam/levee safety, and at least 5 years of risk-based/risk-informed engineering experience in dams and levee systems. Experience must include all experience within Levels 1 and 2, plus leading risk analysis teams, leading and/or participating in Expert Opinion Elicitations, and constructing event trees or using risk-based models to estimate risks for dam and levee projects. Experience conducting external peer review, quality control review, and consistency of decision and action review of Risk Analysis Reports and corrective action studies for dam and levee modifications is required. The criteria will include a review of projects submitted to determine relevant experience for both personnel and the firm, as well as Quality Management of engineering products. Capacity: The PDT divided the NTE amount of $249,500,000.00 by the five-year period to arrive at the $49,900,000.00 capacity for the firm to perform within a one-year period in a satisfactory and efficient manner. The evaluation will consider the availability of an adequate number of personnel in key disciplines. The firm should have one point of contact for this contract and demonstrate past/projected-working relationships with subcontractors. Subcontracting with firms with specialized experienced areas is encouraged. Include an organization chart of the key personnel assigned to the contract. Firms should demonstrate strong ability to provide comprehensive program and project management for complex work; strong ability to provide comprehensive complex technical support; ability to provide necessary personnel for expedited, complex and unexpected work; ability to initiate, manage and complete multiple concurrent task orders; ability to meet unforeseen schedule changes and maintain delivery of a quality product on a timely schedule. Past Performance: Past Performance during the past 5 years from the date the synopsis is posted to SAM.gov on similar contracts with respect to cost control, quality of work, ability to work independently and compliance with performance schedules as determined from Contractor Performance Assessment Reporting System (CPARS), FAPIIS data in SAM.gov, and other sources. CPARS is the primary source of information on past performance. However, any credible, documented evaluations may be considered, but the government is not required to seek other information on the past performance of a firm if none is available from CPARS. Relevant information to provide includes the following: Similar or equal work in terms of complexity in scope and size. Key personnel, offices, and subcontractors to be utilized on this contract. Firm’s role in the contract if a team such as a joint venture or prime-subcontractor relationship. Each A-Es past performance will be evaluated individually as well as in a team. The most recent projects will be given preference as they are indicative of current knowledge and abilities. Trends in performance as identified in PPIRS and FAPIIS. Credibility and detail in firm’s past performance report. Formal federal evaluations will be given more weight. High ratings on former DoD A-E contracts will be given a higher rating. Quality Management System: The evaluation will consider the firm’s Quality Management System. Firms must describe their quality control and quality assurance procedures with any subcontracts and procedures for continual improvement and ensuring customer satisfaction. State any experience with the International Standards Organization (ISO) 9001 standard and the DrChecks automated comment and response system. CADD and Office Automation: All drawings and exhibits for design work, surveying work, drawings, maps, and details to be provided under this contract shall be accomplished and developed using computer-aided design (CAD) software and procedures conforming to the following criteria and most current versions of Target Software: National CAD Standard A/E/C CAD Standard Bentley ProjectWise most current version Autodesk AutoCAD Autodesk Revit Autodesk Civil 3D Autodesk Map 3D Autodesk Inventor Autodesk InfraWorks Autodesk Navisworks Autodesk ReCap Autodesk 3ds Max Bentley ProjectWise InterPlot Server and Client Bentley OpenGround Cloud Windows 11 operating system Microsoft Office Suite 365 Adobe Acrobat Professional 7z or compatible zip program Micro-Computer Aided Cost Estimating System II (MCACES) Bentley Products Legacy software may be required to convert or utilize documents. Consideration will be given to offerors that indicate compatibility with the above CAD standards, but preference will be given to offerors that demonstrate experience with the above standards. Small Business Participation: SB and SDB Participation: The extent of participation of small businesses (including women-owned, HUBZone, small disadvantaged and service-disabled veteran-owned businesses) measured as a percentage of the total anticipated contracted effort, regardless of whether the small business is a prime contractor, subcontractor, or joint venture partner. Equitable Distribution of DOD Contracts: Volume of DoD A-E contract awards in the last 12-months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including Small Business and Small Disadvantaged Business. SUBMISSION REQUIREMENTS: ALL RESPONSES TO THIS REQUIREMENT SHOULD BE SUBMITTED ELECTRONICALLY. Offerors shall submit SF330 Part I and Part II through the PIEE Solicitation Module at https://piee.eb.mil/ and reference the Solicitation number of W9123726RA007. Electronic submissions shall be maximum 2-pages per individual resumes and maximum 4-pages per project information, front-only, and 12-point, Times New Roman font except where mandated fillable forms require smaller fonts. Not to exceed 200 pages total (past performance is not included in page count). No paper copies, CD, DVD, thumb drives, email, or facsimile will be accepted. Electronic submissions must be received to the Government NLT, 5:00 PM Eastern Time on 12 June 2026. Electronic submissions shall be based on 8.5 x11 page size. The only exceptions are Organization Chart or Experience/Qualification matrix which may be based on a 11x17 page size. Personnel resumes shall be limited to two electronic pages (one page front and back equivalent) per person. Any information on a resume beyond the two electronic pages (one page front and back equivalent) will not be considered. Include the A-E's Cage or UEI number. Solicitation packages are not provided, and no additional project information will be given to A-Es during the announcement period. This is not a Request for Proposal. The POC for this procurement is Lillie V. Bodie, lillie.v.bodie@usace.army.mil. This contract is being procured in accordance with the Selection of Architect Engineers Act, the provisions outlined in FAR Subpart 36.6 and the procedures provided in Engineer Pamphlet (EP) 715-1-7, section 3-16. Architect-Engineers (A-E) will be selected for negotiations based on demonstrated competence and qualifications for the type of professional services required. Work will be performed for the Corps of Engineers and its customers to include other Government agencies, and State and local entities. Orders may only be issued for Flood Control Dam and Levee work. Work will predominantly occur within the boundaries of the continental United States and its territories though limited work may potentially occur outside the continental United States when such work is assigned to the U.S. Army Corps of Engineers (USACE). Architect-Engineering services are required for diverse types of Flood Control Dam and Levee Safety Civil Works and MILCON support projects assigned to or by the Dam Safety Modification Center (DSMC). The contract will also provide capacity within the USACE Flood Control Dam and Levee Safety community requesting Architect-Engineering assistance through the Dam Safety Modification Center. A minimum of (3) firm-fixed price indefinite delivery contracts will be negotiated and awarded with a base period of one year and four option periods, one year each. The award amount will not exceed $250,000,000.00 combined capacity over the life of the contracts and work will be issued by negotiated firm-fixed price task orders with the most highly qualified in the pool selected via the Task Order Requirements Notice Process. Task Orders may be awarded between $2,500 and $120,000,000 in value. The contracts are expected to be awarded in July 2026. North American Industrial Classification System code is 541330, which has a size standard of $25.5 million in average annual receipts. This announcement is open to all businesses regardless of size. Large businesses must comply with FAR clause 52.219-9 (DEVIATION 2018-O00018) regarding the requirement for a subcontracting plan on the part of work it intends to subcontract; this is only required by the most highly qualified A-Es and is not part of the submittal for this synopsis. The A-Es found most highly qualified will be required to submit a Small Business Subcontracting Plan meeting the statutory small business limits of 23% overall, 5% small disadvantaged (including 8(a)), 5% woman owned and 3% each for Service-Disabled Veteran-Owned Small Business, and HUBZone businesses prior to award. The A-E’s corporate Quality Control Plan is required with this submittal and will be evaluated as outlined in factor E. Each task order with site work will require a Site-Specific Safety and Health Plan and all require an individual task order specific Quality Control plan. To be eligible for contract award, each A-E must be registered in the System Award Management (SAM). Register via the SAM website at https://www.sam.gov/portal/public/SAM. Multiple contracts are being awarded under this synopsis, at least the three most highly qualified firms will each receive a Request for Proposal to allow development and submission of a price proposal. Task Orders will be awarded in accordance with the Selection of Architect Engineers Act guidance to ensure fair distribution of awards using the Task Order Requirements Notice procedures to the most highly qualified out of the pool of awarded contractors. PROJECT INFORMATION: The A-E services to be provided under this contract will be to provide Engineering Services for Flood Control Dam and Levee Safety efforts nationally. The A-E services will be multidisciplinary (see paragraph on Specialized Experience and Technical Competence below) in nature to support our mission to plan, design, construct, oversee construction, modify, operate, and control flood control reservoirs, dams, and levees. The A-E shall provide the appropriate personnel, materials, equipment, management, quality, and cost controls to perform all phases of engineering, and architectural services to include, but not limited to, planning studies; engineering investigations; risk assessments; designs; reports; construction plans and specifications; preliminary cost estimates; general construction and engineering type surveys and related services; Computer-Aided Design and Drafting (CADD); and construction consultation and inspection/quality assurance including engineering during construction. Work shall be accomplished in full compliance with established USACE manuals, policies, standards and practices and other professional practices and standards as necessitated by project conditions or job requirement. CADD information shall conform to paragraph (E) below. Capability for scanning hard copy into the CADD and 3D design system is also required. Work may require using the metric system. All work shall be prepared to be compatible with MS Office 365, and all specifications shall use SPECSINTACT format. Services shall also include any or all of the following based on need: Site characterization studies, Engineering evaluations and analyses in support of hydrologic (e.g. Inflow Design Flood) and seismic loading, consequence studies, Dam and Levee screenings, feasibility studies, preliminary and/or final designs, value engineering, constructability reviews, preparation of construction plans and specifications, or other analyses or studies related to the dam and levee safety programs. Services will be required to evaluate flood control dams and levee appurtenances including bridges, gates, spillways, pumping stations and other appurtenant structures attached to dams and levees as necessary to characterize the project. Earth embankment and foundation seepage analyses, inspection, assessment and design of concrete hydraulic structures and hydraulic steel structures associated with dam and levee safety projects. The A-E will be required to provide dam and levee safety experts to participate in highly complex dam and levee safety risk based Independent Expert Peer Reviews (IEPR), Expert Opinion Elicitations (EOE), for consultation, review of in-progress dam and levee safety design and construction activities, completed dam and levee safety construction, Risk Assessment and Analyses, Potential Failure Modes Analysis (PFMA), and numerical modeling of features associated with dam and levee safety projects. SELECTION CRITERIA: The selection criteria for this particular contract are listed below in descending order of importance. Criteria (i) through (vi) are primary. Criteria (vii) and (viii) are secondary and will only be used as a “tiebreaker” among firms that are essentially technically equal. Specialized Experience and Technical Competence: Firms must demonstrate specialized experience allowing objective evaluation and ranking of A-E capabilities on the following criteria/elements, which are listed in descending order of importance. For the proposed team, provide a maximum of ten (10) specific, completed projects that best illustrate overall team experience. Projects submitted shall have been completed as the prime A-E and be within the past five (5) years from the date qualifications submittals are due. Include a brief narrative for each project. Discuss conformance to scope, adherence to performance schedules, limiting changes, and delivering a product that satisfies the requirements. The A-E must only describe its exact efforts on the project and not appear to have made more effort than it did and be specific about firms’ effort. Dam Safety Design and Analysis to include experience with Risk Assessments, Issue Evaluation Studies, Dam Safety Modification Studies, Dam Modification Alternatives Development and Evaluation, Design Documentation Reports, Rehabilitation Reports, Plans and Specifications, Engineering Support During Construction, Geotechnical studies, Hydrologic and Hydraulic studies to include Computational Fluid Dynamics, Inflow Design Flood modeling, sediment transport modeling, scour evaluations and modeling, and cavitation assessments and modeling. Flood Damage Reduction Engineering to include experience with Planning and Design of floodwalls, levees and appurtenant structures, Design Documentation Reports, Rehabilitation Reports, Hydrologic and Hydraulic Studies, Plans and Specifications, Engineering Support during Construction. Engineering during construction and construction project evaluation of work in progress to report to the USACE work of others meeting contract requirements. Civil Engineering to include experience in civil site layout (preparation of applications for NPDES, as well as, construction permits, performing civil site layout to derive a reasonable and logical sequence of construction activities). Other Engineering, Architectural and Planning Services in support of Flood Control Dam and Levee Safety (each of equal importance) to include: Hydrologic and Hydraulic Studies Structural Analysis and Design Geotechnical and Engineering Geology Analysis and Design Electrical/Mechanical Design and Analysis Design of Sanitary and Water Projects Design, Inspection and Assessment of Bridges Roadway Design and Analysis Cost development of designs Scheduling of work Professional Qualifications: The evaluation of professional qualifications will consider relevant experience, education, training, professional registration, organizational certifications, and longevity with the firm. The firm should indicate professional registrations/licenses, certifications from commercial organizations, professional recognition, professional associations, advanced training, and specific work experience of key personnel. The firm must staff the necessary Registered/Licensed Engineers, Geologists, Scientists, Architects and Surveyors having professional qualifications and specialized experience to perform and/or oversee that all work is accomplished as required by law and professional engineering architectural and surveying practices. Firms will be ranked on the above qualified registered professional personnel in the following key disciplines: Disciplines in the following group (Group A) are of equal importance: Structural Engineers, Geotechnical Engineers, Geologists, Hydraulic Engineers, Civil Engineers, Mechanical Engineers, Cost Engineers, and Electrical Engineers. Disciplines in the following group (Group B) are also of equal importance but are of lesser importance than the previous group (Group A): Specification Writers, Cost Engineers, Estimators, Engineering Technicians (Draftsmen/CADD Operators/GIS), Sanitary Waste Engineers, Planners, Architects, Professional Surveyors, Environmental Engineers, Environmental Geologists, Biologists (Ecologist), Safety Professionals, Hydrogeomorphologists, Industrial Hygienists and Construction Inspectors/Quality Assurance. Personnel proposed for Dam Safety Design and Analysis shall be shown in the Levels of Experience listed below. Provide appropriate documentation to justify their experience level. Level 1 experience includes five to ten (5-10) years of conventional engineering experience for dam/levee safety planning, engineering, design and/or construction in structural, geotechnical, engineering geology, hydraulic, civil, electrical, or mechanical engineering. Level 2 experience includes ten to fifteen (10-15) years of conventional engineering experience in dam/levee safety, and at least 5 years of risk-based/risk-informed engineering experience in dams and levee systems. Experience must include all experience within Level 1, plus participation on risk analysis teams for dam and levee systems, facilitation or participation in potential failure mode analysis (PFMA), or estimation of conditional probabilities of failure for static, hydrologic, and seismic failure modes, and estimating loss of life and economic consequences. Level 3 experience includes more than fifteen (15+) years of conventional engineering experience in dam/levee safety, and at least 5 years of risk-based/risk-informed engineering experience in dams and levee systems. Experience must include all experience within Levels 1 and 2, plus leading risk analysis teams, leading and/or participating in Expert Opinion Elicitations, and constructing event trees or using risk-based models to estimate risks for dam and levee projects. Experience conducting external peer review, quality control review, and consistency of decision and action review of Risk Analysis Reports and corrective action studies for dam and levee modifications is required. The criteria will include a review of projects submitted to determine relevant experience for both personnel and the firm, as well as Quality Management of engineering products. Capacity: The PDT divided the NTE amount of $249,500,000.00 by the five-year period to arrive at the $49,900,000.00 capacity for the firm to perform within a one-year period in a satisfactory and efficient manner. The evaluation will consider the availability of an adequate number of personnel in key disciplines. The firm should have one point of contact for this contract and demonstrate past/projected-working relationships with subcontractors. Subcontracting with firms with specialized experienced areas is encouraged. Include an organization chart of the key personnel assigned to the contract. Firms should demonstrate strong ability to provide comprehensive program and project management for complex work; strong ability to provide comprehensive complex technical support; ability to provide necessary personnel for expedited, complex and unexpected work; ability to initiate, manage and complete multiple concurrent task orders; ability to meet unforeseen schedule changes and maintain delivery of a quality product on a timely schedule. Past Performance: Past Performance during the past 5 years from the date the synopsis is posted to SAM.gov on similar contracts with respect to cost control, quality of work, ability to work independently and compliance with performance schedules as determined from Past Performance Information Retrieval System (PPIRS), FAPIIS data in SAM.gov, and other sources. PPIRS is the primary source of information on past performance. However, any credible, documented evaluations may be considered, but the government is not required to seek other information on the past performance of a firm if none is available from PPIRS. Relevant information to provide includes the following: Similar or equal work in terms of complexity in scope and size. Key personnel, offices, and subcontractors to be utilized on this contract. Firm’s role in the contract if a team such as a joint venture or prime-subcontractor relationship. Each A-Es past performance will be evaluated individually as well as in a team. The most recent projects will be given preference as they are indicative of current knowledge and abilities. Trends in performance as identified in PPIRS and FAPIIS. Credibility and detail in firm’s past performance report. Formal federal evaluations will be given more weight. High ratings on former DoD A-E contracts will be given a higher rating. Quality Management System: The evaluation will consider the firm’s Quality Management System. Firms must describe their quality control and quality assurance procedures with any subcontracts and procedures for continual improvement and ensuring customer satisfaction. State any experience with the International Standards Organization (ISO) 9001 standard and the DrChecks automated comment and response system. CADD and Office Automation: All drawings and exhibits for design work, surveying work, drawings, maps, and details to be provided under this contract shall be accomplished and developed using computer-aided design (CAD) software and procedures conforming to the following criteria and most current versions of Target Software: National CAD Standard A/E/C CAD Standard Bentley ProjectWise most current version Autodesk AutoCAD Autodesk Revit Autodesk Civil 3D Autodesk Map 3D Autodesk Inventor Autodesk InfraWorks Autodesk Navisworks Autodesk ReCap Autodesk 3ds Max Bentley ProjectWise InterPlot Server and Client Bentley OpenGround Cloud Windows 11 operating system Microsoft Office Suite 365 Adobe Acrobat Professional 7z or compatible zip program Micro-Computer Aided Cost Estimating System II (MCACES) Bentley Products Legacy software may be required to convert or utilize documents. Consideration will be given to offerors that indicate compatibility with the above CAD standards, but preference will be given to offerors that demonstrate experience with the above standards. Small Business Participation: SB and SDB Participation: The extent of participation of small businesses (including women-owned, HUBZone, small disadvantaged and service-disabled veteran-owned businesses) measured as a percentage of the total anticipated contracted effort, regardless of whether the small business is a prime contractor, subcontractor, or joint venture partner. Equitable Distribution of DOD Contracts: Volume of DoD A-E contract awards in the last 12-months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including Small Business and Small Disadvantaged Business. SUBMISSION REQUIREMENTS: ALL RESPONSES TO THIS REQUIREMENT SHOULD BE SUBMITTED ELECTRONICALLY. Offerors shall submit SF330 Part I and Part II through the PIEE Solicitation Module at https://piee.eb.mil/ and reference the Solicitation number of W9123726RA007. Electronic submissions shall be maximum 2-pages per individual resumes and maximum 4-pages per project information, front-only, and 12-point, Times New Roman font except where mandated fillable forms require smaller fonts. Not to exceed 200 pages total (past performance is not included in page count). No paper copies, CD, DVD, thumb drives, email, or facsimile will be accepted. Electronic submissions must be received to the Government NLT, 5:00 PM Eastern Time on 12 June 2026. Electronic submissions shall be based on 8.5 x11 page size. The only exceptions are Organization Chart or Experience/Qualification matrix which may be based on a 11x17 page size. Personnel resumes shall be limited to two electronic pages (one page front and back equivalent) per person. Any information on a resume beyond the two electronic pages (one page front and back equivalent) will not be considered. Include the A-E's Cage or UEI number. Solicitation packages are not provided, and no additional project information will be given to A-Es during the announcement period. This is not a Request for Proposal. The POC for this procurement is Lillie V. Bodie, lillie.v.bodie@usace.army.mil.
68%
Pre-Solicitation06/12/2026
Architect-Engineer (A-E) Services – Environmental Quality (EQ) Program U.S. Army Corps of Engineers, Mobile District THIS IS A SOURCES SOUGHT SYNOPSIS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR REQUEST FOR PROPOSALS. The purpose of this Market Research and Sources Sought Notice is to gain knowledge of potential qualified Small Business, HUBZone, 8(a), Service-Disabled Veteran Owned, and Women Owned Small Business firms. Responses to this Sources Sought Synopsis will be used by the government in making appropriate acquisition decisions. The U.S. Army Corps of Engineers (USACE), Mobile District, anticipates a future Indefinite Delivery/Indefinite Quantity (IDIQ) procurement to acquire Architect-Engineer (AE) Services under individual task orders for Mobile Districts Environmental Quality (EQ) Program which meets the definition of AE Services as defined in 40 U.S.C. 1101 and FAR 2.101 for Military, Civil, and Federal Agencies. The anticipated contracts will support military installations, Federal agencies, and other authorized customers, primarily within the Mobile Districts Area of Responsibility (AOR) and the South Atlantic Divisions (SAD) AOR. The Government anticipates a total program capacity of $600,000,000 over a five-year ordering period, allocated as follows: $500,000,000: Anticipated capacity for requirements administered by the USACE Mobile District. $100,000,000: Reserved capacity for use by other USACE districts within SAD to support mission-critical environmental requirements, including emerging or previously unplanned requirements not otherwise supported by existing contract vehicles. The anticipated capacity represents the maximum potential value of the procurement and does not constitute a guarantee of work or funding. The Government reserves the right to modify the acquisition strategy, contract structure, capacity allocation, and scope of the anticipated procurement based on market research findings and mission requirements. AE Services will provide a full range of comprehensive support for the Environmental Quality Program including but not limited to: Resource Conservation and Recovery Act (RCRA); Clean Air Act (CAA); Safe Drinking Water Act (SDWA); Clean Water Act (CWA); Toxic Substances Control Act (TSCA); Comprehensive Environmental Response, Compensation and Liability Act (CERCLA); National Environmental Policy Act (NEPA); Energy Policy Act 2005; compliance; source reduction/waste minimization; conservation; restoration; Department of Defense Instruction; Executive Orders; policy, guidance, programmatic and operational program execution strategy; planning; permitting and technical support; environmental management systems; information technology tool refinement, customization, population and implementation; environmental training, outreach, strategy, and awareness; water compliance and reuse plans; vulnerability assessments; compliance assessments; multimedia and single media facility audits; environmental baseline surveys; DoD Services; Medical Departments and health services support; audits and assessments; planning studies and evaluations; geographic information system support; compliance monitoring, recordkeeping and reporting. Additional projects may include range and training program support, solid waste, RCRA evaluations, and management plans; DoD awards development; sustainability program initiatives and planning; ozone depleting substance (ODS) evaluations and elimination plans; energy studies and audits; facility evaluations and audits; Leadership in Energy and Environmental Design (LEED) technical support and building commissioning; programmatic support of installation restoration and munitions response compliance cleanup programs; greenhouse gas initiatives; air quality monitoring, testing and permitting; air dispersion modeling; asbestos and lead-based paint sampling and report preparation; and real estate site assessments; perform Quality Control, Quality Assurance, Technical Assistance and Technical Review of planning and environmental products. Sources are being sought for firms with a North American Industry Classification System (NAICS) Code of 541330 with a Small Business Size Standard of no greater than $25,500,000 average annual receipts over five years. NO RESPONSES WILL BE ACCEPTED BY FAX OR MAIL. ALL RESPONSES MUST BE SENT via PIEE, DIRECTED to: Danielle Kachele and Kenneth Harlan. Should you have any questions, please reach out to Danielle Kachele at Danielle.l.kachele@usace.army.mil. Submittals are due no later than 2:00 pm CT on Thursday, December 3, 2026. Submittals will not be returned. Telephonic responses will not be honored. This is not a Request for Proposal, only a Request for Information. No award will result from this Sources Sought. This notice does not constitute any commitment by the Government. Note 1: This is not a Request for Proposal, only a Request for Information. No award will result from this Sources Sought. Note 2: This sources sought synopsis is not to be construed as a commitment by the Government, nor will the Government pay for the information solicited. Note 3: Large Businesses need not respond. *** End of Sources Sought Notice ***
68%
Market Research12/03/2026
URGENT: Alternative Submission Instructions for Solicitation W912PP25RA009 due to Microsoft Outage Due to the widespread Microsoft Outlook/Exchange outage, the Government is aware that offerors are experiencing technical difficulties. To ensure all offerors have a secure and fair opportunity to submit their proposals prior to the deadline on November 13, 2026, the Government is authorizing DoD Safe Access File Exchange (DoD SAFE) as an alternative submission method. Please follow the instructions below: Immediately send an email requesting a DoD SAFE drop-off invitation to Diana.M.Keeran@usace.army.mil. If your corporate email is down, you may send this request from an alternative email address. You will receive an automated email notification from DoD SAFE containing a unique link and transaction code to drop off files. Click on the link, upload your complete proposal files, and click “Submit”. Note: Do not attempt to encrypt the files within DoD SAFE if they are already pass-word protected; let the system handle transit security. Once submitted, notify the Contract Specialist via email that your drop-off has been successfully completed. The submission deadline remains 2:00 PM MST on November 13, 2026.
68%
Special Notice11/13/2026

Additional Details

Solicitation Number

W912QR21R0029

Archive Date

Mar 11, 2021

Office Address

LOUISVILLE, KY, 40202-2230