GovChime
Notice ID: f24e967d727c4b808c05e1c9d4d10729Combined Synopsis/Solicitation

CINCH HOOK CRUSH AND STOCKPILE

Archived on October 15, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 AM UTC−04:00
Posted
September 11, 2021
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Southwestern Regional Office, Region 3
Place of performance
AZ
Last updated
Dec 4, 2025

Identifiers

Solicitation number
127EAX21Q0035
Notice ID
f24e967d727c4b808c05e1c9d4d10729

Description

Amendment 0001 Cinch Hook Pit Crush and Stockpile Project, Coconino National Forest: This project will include mobilization, clearing and grubbing, drilling, blasting, sampling and testing, stockpile surveying for quality control and crushing and stockpiling of an aggregate material in accordance with the plans and specifications.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:127EAX21Q0035
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentAug 29, 2021

    CINCH HOOK CRUSH AND STOCKPILE

    Notice f24e967d727c4b808c05e1c9d4d10729 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement Typical Service Activities Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow. Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. Typical Construction Activities Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization. Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
73%
Solicitation01/09/2023
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0003 is issued as a Request for Quotation (RFQ) for all equipment, labor, materials, tools, and other incidentals and execute all work necessary to perform the required road rehabilitation on the designated National Forest roads in accordance with the specifications, and bidder’s technical proposal which is incorporated by reference. The work consists of, but is not limited to, installing erosion and sedimentation controls (E&S Controls), traffic control, ditch work, repairing/replacing/placing new guide rail, removing existing culverts, installing new culverts, milling and overlaying existing asphalt, full depth replacement of asphalt, full depth asphalt spot repairs, asphalt shoulder repairs, line painting, constructing accessibility features, and placing and compacting road base and driving surface aggregate. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than October 19, 2026, at 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. Amendment 0001 has been executed to incorporate 100% Design and Quantity Sheet attachments, as well as extend the quote due date to 10/29/2026 @ 1:00 PM ET. Amendment 0002 has been executed to extend the quote due date to 11/05/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Amendment 0003 has been executed to extend the quote due date to 11/11/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Quotes shall be submitted electronically via e-mail to christopher.malley@usda.gov and pps.proposals@usda.gov and are due NLT Novenber 11, 2026, at 1:00 PM Eastern Time.
67%
Combined Synopsis11/11/2026
This project involves the repair and resurfacing of three parking lots on the Arapaho and Roosevelt National Forest and Pawnee National Grassland including crack sealing, pavement patching, seal coating and re-striping. NAICS code 237310 - Highway, Street, and bridge Construction as a 100% SB Set Aside. Size standard $45 Million. PSC Code Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, Questions Due: November 6th, 2026 at 14:00 Eastern Standard Time(EST). Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST). All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above. Late quotes will be rejected.
67%
Solicitation11/23/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445527Q0001 is issued as a Request for Quotation (RFQ) For the Removal and replacement of an existing concrete bridge with a 70 foot (overall length) single span concrete I-girder bridge with a concrete deck, concrete abutments, and H-pile foundations. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 Highway, Street, and Bridge Construction. The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
67%
Combined Synopsis10/26/2026
12363N23Q4035 This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and proposals are being requested. PROJECT DESCRIPTION: California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement The California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement is a National BPA that will consist of a variety of work including both Road Maintenance service types of work and Road Construction types of work. The BPA will have a period of performance from early spring 2023 through March 2033 and can be utilized on all California Federal Forests and Grasslands and is available for all federal agencies to utilize. This solicitation is issued as a request for quotation (RFQ). This solicitation will remain Open and Continuous to add vendors when determined necessary for the 10-year period it is active. Make sure your firm is updated and registered in the System for Award Management system (SAM) and current to conduct government business. Due to recent storm damage, emergency repairs are necessary to repair road infrastructure and we expect to issue calls before the closing date. As vendors are being evaluated for zones, we may issue call orders to early offerors before the due date. Please read the entire solicitation thoroughly to ensure all requirements in your response are included. PROJECT LOCATION: Projects shall covers the state of California including the following forests; Angeles, Cleveland, Eldorado, Humboldt-Toiyabe, Inyo, Klamath, Lake Tahoe Basin Management Unit, Lassen, Los Padres, Mendocino, Modoc, Plumas, San Bernardino, Sequoia, Shasta-Trinity, Sierra, Six Rivers, Stanislaus, and Tahoe National Forests and Butte Valley National Grassland. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around March 15, 2023. Engineering point of contact is Douglas Anderson, telephone: (707) 373-6265. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business. ALL QUOTES SHALL BE EMAILED TO: chad.bullock@usda.gov; james.kaminski@usda.gov & B_01_QU.r8ld7xo1wy1sggsv@u.box.com on or BEFORE MARCH 15, 2023, 4:30 PM PACIFIC TIME. All documents will be submitted electronically; follow this naming convention for your 2 attachments California FERM-VendorName-Quote AND California FERM-VendorName-Technical.
67%
Combined Synopsis03/15/2023

Additional Details

Solicitation Number

127EAX21Q0035

Archive Date

Oct 15, 2021

Office Address

ALBUQUERQUE, NM, 87102