Notice ID: a3d1441e558144ee85a8e7f920f1cfbcSolicitation
Pine Creek Road Comprehensive Resurfacing And Safety Improvements
Archived on September 21, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−05:00
- Posted
- September 3, 2024
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA FOREST SERVICE-SPOC SW
- Place of performance
- San Diego, CA
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 12970224R0059
- Notice ID
- a3d1441e558144ee85a8e7f920f1cfbc
Description
The purpose of this contract is to replace existing aged and broken HMA of Pine Creek Road (System Road 14S05 on the Descanso Ranger District (DRD) of the Cleveland National Forest to improve public traffic safety, access for fire management and recreation use. Unescorted sited visits may be conducted during the solicitation period, contact: Foster Kuramata, foster.kuramata@usda.gov, 858-395-2745 Prior to conducting unescorted site visits. 1. Set Aside: 100% Small Business Concerns 2. NAICS: 237310 Highway, Street, and Bridge Construction 3. PSC: Y1LB Construction of Highways, Roads, Streets, Bridges, and Railways 4. SBA Size Standard: $45.0M 5. Disclosed Magnitude: The total contract amount for all construction services is estimated to be between $1,000,000 and $5,000,000 Submit RFI's to derek.lavey@usda.gov prior to 8/23/2024.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12970224R0059- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 19, 2024
Pine Creek Road Comprehensive Resurfacing And Safety Improvements
- 4×SolicitationCurrentAug 2, 2024
Pine Creek Road Comprehensive Resurfacing And Safety Improvements
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
12363N23Q4035 This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and proposals are being requested. PROJECT DESCRIPTION: California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement The California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement is a National BPA that will consist of a variety of work including both Road Maintenance service types of work and Road Construction types of work. The BPA will have a period of performance from early spring 2023 through March 2033 and can be utilized on all California Federal Forests and Grasslands and is available for all federal agencies to utilize. This solicitation is issued as a request for quotation (RFQ). This solicitation will remain Open and Continuous to add vendors when determined necessary for the 10-year period it is active. Make sure your firm is updated and registered in the System for Award Management system (SAM) and current to conduct government business. Due to recent storm damage, emergency repairs are necessary to repair road infrastructure and we expect to issue calls before the closing date. As vendors are being evaluated for zones, we may issue call orders to early offerors before the due date. Please read the entire solicitation thoroughly to ensure all requirements in your response are included. PROJECT LOCATION: Projects shall covers the state of California including the following forests; Angeles, Cleveland, Eldorado, Humboldt-Toiyabe, Inyo, Klamath, Lake Tahoe Basin Management Unit, Lassen, Los Padres, Mendocino, Modoc, Plumas, San Bernardino, Sequoia, Shasta-Trinity, Sierra, Six Rivers, Stanislaus, and Tahoe National Forests and Butte Valley National Grassland. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around March 15, 2023. Engineering point of contact is Douglas Anderson, telephone: (707) 373-6265. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business. ALL QUOTES SHALL BE EMAILED TO: chad.bullock@usda.gov; james.kaminski@usda.gov & B_01_QU.r8ld7xo1wy1sggsv@u.box.com on or BEFORE MARCH 15, 2023, 4:30 PM PACIFIC TIME. All documents will be submitted electronically; follow this naming convention for your 2 attachments California FERM-VendorName-Quote AND California FERM-VendorName-Technical. | 77% | Combined Synopsis | 03/15/2023 |
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 | 75% | Solicitation | 11/17/2026 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0003 is issued as a Request for Quotation (RFQ) for all equipment, labor, materials, tools, and other incidentals and execute all work necessary to perform the required road rehabilitation on the designated National Forest roads in accordance with the specifications, and bidder’s technical proposal which is incorporated by reference. The work consists of, but is not limited to, installing erosion and sedimentation controls (E&S Controls), traffic control, ditch work, repairing/replacing/placing new guide rail, removing existing culverts, installing new culverts, milling and overlaying existing asphalt, full depth replacement of asphalt, full depth asphalt spot repairs, asphalt shoulder repairs, line painting, constructing accessibility features, and placing and compacting road base and driving surface aggregate. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than October 19, 2026, at 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. Amendment 0001 has been executed to incorporate 100% Design and Quantity Sheet attachments, as well as extend the quote due date to 10/29/2026 @ 1:00 PM ET. Amendment 0002 has been executed to extend the quote due date to 11/05/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Amendment 0003 has been executed to extend the quote due date to 11/11/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Quotes shall be submitted electronically via e-mail to christopher.malley@usda.gov and pps.proposals@usda.gov and are due NLT Novenber 11, 2026, at 1:00 PM Eastern Time. | 72% | Combined Synopsis | 11/11/2026 |
Current Award Information posted 2/13/2023. See Attachment. Solicitation is open continous and award information will be updated as needed. Amendment 1- 11/17/2022 See attachments for details (Amendment 01, Revised NM FERM Quote Package, and E_PSR-REVIE_C-GROUP 3 G3-4 EARTHEN BARRIER G3-4 (1). No extension to due date. Update to posting 2/5/242-Updated BPA contact information. No other changes. New Mexico Forest Engineering and Road Maintenance (FERM). This solicitation is for road maintenance and construction work to be performed within the New Mexico National Forest area composed of the Carson, Cibola, Gila, Lincoln, Santa Fe, and Kiowa Forests. This solicitation and any resultant Blanket Purchase Agreements may incorporate service, construction, emergency work, and potential for other complex work requirements. See Attachments for more information. | 72% | Solicitation | 01/31/2028 |
PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement Typical Service Activities Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow. Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. Typical Construction Activities Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization. Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business. | 72% | Solicitation | 01/09/2023 |
Additional Details
Solicitation Number
12970224R0059
Archive Date
Sep 21, 2024
Office Address
Washington, DC, 20250