Notice ID: dbc9122202f44f7793f3b2c9623ed99bCombined Synopsis/SolicitationArchived
54--2026 SPRNCA FENCING MATERIALS
Archived on July 2, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM MDT
- Posted
- June 11, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 331110: Iron and Steel Mills and Ferroalloy Manufacturing
- Agency
- Department of the InteriorBUREAU OF LAND MANAGEMENT
Notice details
- Office
- ARIZONA STATE OFFICE
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 140L6426Q0013
- Notice ID
- dbc9122202f44f7793f3b2c9623ed99b
Description
2026 SPRNCA FENCING MATERIALS
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (7)
- Download
Sol_140L6426Q0013_Amd_0002.pdf
211 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Sol_140L6426Q0013_Amd_0001.pdf
210 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment_4_Revised_Specifications_0001.pdf
476 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Sol_140L6426Q0013.pdf
249 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment_1_Specifications.pdf
510 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment_2_Instructions_to_Offerors.pdf
132 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment_3_Clauses_and_Provisions.pdf
183 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
2026 SPRNCA FENCING MATERIALS
- 2Version 2Combined Synopsis/SolicitationArchived
54--2026 SPRNCA FENCING MATERIALS
- 4Version 4Combined Synopsis/SolicitationArchivedCurrent
54--2026 SPRNCA FENCING MATERIALS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
STEEL BARS AND PLATE | 55% | Combined Synopsis | 09/10/2026 |
5? wide x 6? high x 51.7? length Box Culvert to include: Approximately (51.7) Lineal feet of 5? (span) x 6? (rise) I.D. of Box Culvert (8sections). Cutoff Walls for (2) Culvert ends and (4) wingwalls. (4) L-shaped cantilever wingwalls 8?long. (2) Headwalls, one at each end 1? wide x 1? high on each end section. Neoprene gaskets will be installed on each box section prior to delivery. Exterior waterproofing by others. Level 1 black bar reinforcing carried. HL-93 Live Load Rating assumed (NY PE stamp w/ supporting Calculations provided). Class 100 Tracked and Class 120 Wheeled in accordance with UFC 3-310-08 in attached PDF. Skew angle of the culvert with the road will be 24 degrees. Drawings/submittals stamped by a PE licensed in NY with supporting engineering. | 38% | Combined Synopsis | 06/22/2026 |
5? wide x 6? high x 51.7? length Box Culvert to include: Approximately (51.7) Lineal feet of 5? (span) x 6? (rise) I.D. of Box Culvert (8sections).Cutoff Walls for (2) Culvert ends and (4) wingwalls. (4) L-shaped cantilever wingwalls 8?long. (2) Headwalls, one at each end 1? wide x 1? high on each end section. Neoprene gaskets will be installed on each box section prior to delivery. Exterior waterproofing by others. Level 1 black bar reinforcing carried. HL-93 Live Load Rating assumed (NY PE stamp w/ supporting Calculations provided). Class 100 Tracked and Class 120 Wheeled in accordance with UFC 3-310-08 in attached PDF. Skew angle of the culvert with the road will be 24 degrees. Drawings/submittals stamped by a PE licensed in NY with supporting engineering. | 38% | Combined Synopsis | 05/13/2026 |
5? wide x 6? high x 57.1? length Box Culvert to include:Approximately (57.1) Lineal feet of 5? (span) x 6? (rise) I.D. of Box Culvert (8 sections).Cutoff Walls for (2) Culvert ends and (4) wingwalls. (4) L-shaped cantilever wingwalls 8?long. (2) Headwalls, one at each end 1? wide x 1? high on each end section. Neoprenegaskets will be installed on each box section prior to delivery. Exterior waterproofing byothers. Level 1 black bar reinforcing carried. HL-93 Live Load Rating assumed (NY PEstamp w/ supporting Calculations provided). Drawings/submittals stamped by a PElicensed in NY with supporting engineering | 38% | Combined Synopsis | 02/03/2026 |
AMENDMENT 0001 TECHNICAL SPECIFICATION CORRECTION AND EXTENSION OF RESPONSE DATE. - STEEL PLATE | 35% | Combined Synopsis | 11/17/2026 |
Additional Details
Solicitation Number
140L6426Q0013
Archive Date
Jul 2, 2026
Office Address
PHOENIX, AZ, 85004