Remediation and Restoration

Archived on June 23, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM EDT
Posted
May 24, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of TransportationOFFICE OF THE SECRETARY

Notice details

Office
6913G6 VOLPE NATL TRANS SYS CNTR
Place of performance
Bloomingdale, Georgia, 31302
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
6913G626Q300028
Notice ID
0c5bf868b66843be962084096bbfeec4

Description

The purpose of this solicitation/quote is to provide support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at two facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination sites as cited hereunder. The FAA facilities to be addressed are located in Conyers, GA and Bloomingdale, GA. The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites. 

The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirementThe Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.. 

This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2.

The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work.

Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. (see SOW for more details).

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (11)

  • RFQ 6913G626Q300028.pdf

    227 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • TABLE OF CONTENTS Pg 4.pdf

    117 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachments I-III 5-22-26.pdf

    362 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment IV- SAV OM-PASI Report -Final.pdf

    33 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment V -SAV OM-RI Report Final 2-22-25.pdf

    22 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment VI - QYL RTR PASI Report .pdf

    943 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment VII - QYL-RTR-RI Report 11-12-25.pdf

    1.7 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment VIII - SAV-WD- 2105-4491.pdf

    68 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment IX - CON-WD 2015-4471 5-13-26.pdf

    68 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment X Instructions (rev-1) 5-23-26 .pdf

    215 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment XI Pricing 5-22-26.pdf

    95 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Demolition, Remediation and Restoration

    Notice 186e18cc2c9d4e9788a64d3921dfec4b on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Remediation and Restoration

    Notice 484813f6ef024c1ca06fce1ef55c6435 on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    Remediation and Restoration

    Notice 0c5bf868b66843be962084096bbfeec4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.
94%
Combined Synopsis11/23/2026
SOLICITATION NOTICE: The RFP and all attachments for the Standard Chlorine of Delaware- Remediation Services Single Award Task Order Contract (SATOC) are attached as part of this solicitation posting. Site Visit: Site visit is scheduled for 02 October 2025 starting at 9:30AM EST. Address: 745 Governor Lea Road, New Castle, DE 19720Point of Contact for site visit: Bishel Baby, Bishel.Baby@usace.army.mil Proposals are due: 21 October 2025 5:00PM EST. AMENDMENT 0001- This amendment provides responses to some RFIs, outline site visit instructions, and extends the proposal due date to 29 October 2025 5:00PM EST. RFI phone inquiries will not be accepted. AMENDMENT 0002- The purpose of Amendment 0002 is to incorporate the Governments responses to the Requests for Information (RFIs) and to update the Statement of Work (SOW) for the Base SATOC for the Standard Chlorine of Delaware project. All other terms and conditions shall remain unchanged. (Please note that responses Amendment 0001 response are also included in the Amendment 0002 RFI response document.) AMENDMENT 0003- The purpose of this amendment is to extend the closing date to 1:00 pm (EST) 19 November 2025 and extend the deadline for RFI submissions to 3:00 pm (EST) 27 October 2025. All other terms and conditions remain unchanged. AMENDMENT 0004- The purpose of this amendment is to provide additional Government responses to RFIs. The proposal deadline is extended to Tuesday 25 November 2025 by 3PM EST. Additional RFIs may be submitted by Friday November 7, 2025 3PM EST. All other terms and conditions remain unchanged. UPDATE NUMBER 0005- This update provide a list of contractors interested in networking for the SCDE project (see attachment). AMENDMENT 0005- The purpose of this amendment is to provide Government responses to RFIs. Please take note of all revised attachments as part of this amendment. All other terms and conditions remain unchanged. UPDATE NUMBER 0007- The purpose of this update is to remove the RFI responses and the document provided with Amendment 0005 and provide a revised document with Government responses. As a result, the document titled |W912BU25RA015_Amendment_0005_Responses| is removed from this solicitation, and is now replaced with revised government responses to the RFIs submitted under Amendment 0005-. The revised document title is |W912BU25RA015_Amendment_0005_Responses_rev1|. Please use the most updated document to provide responses/proposals to this RFP. All other terms and conditions remain unchanged. AMENDMENT 0006- The purpose of this amendment is to extend the proposal deadline for Solicitation No: W912BU25RA015 from 25 November, 2025 3:00PM EST to 05 December 2025 by 3:00PM EST. All other terms and conditions remain unchanged. Note- A conformed copy of the solicitation has been uploaded/included with this amendment. ALL Amendments MUST be acknowledged when submitting a final proposal. AMENDMENT 0007- The purpose of this amendment is to restore the _Sample Task Order Proposal Spreadsheet / Work Breakdown_ language under Section L, Volume IV, Factor 3 - Total Evaluated Price. This language was inadvertently removed in Amendment 0006. The due date for proposals is now extended to Monday, 8 December, 2025 by 5PM EST. CLIN 0001 is a placeholder CLIN only to provide flexibility at the task order level. Should this CLIN be utilized post award, pricing will be negotiated at the order level at which time funds will be realigned from CLIN 0002, as required. Conformed copy is uploaded with highlighted changes.
42%
Solicitation12/08/2025
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service. The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS). See attachments for full requirements. QA 11_04_2026 Uploaded 11-04-2026 Amendment A001 Posted 11-04-2026
38%
Combined Synopsis11/17/2026
** EFFECTIVE JUNE 1, 2026: The government has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE MAY 28, 2026: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE MAY 27, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE MAY 19, 2026: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ** ** This Solicitation Notice, relates to Pre-Solicitation W912P626RA009, and is being issued by the United States Army Corps of Engineers - Chicago District for Upper Des Plaines River and Tributaries Phase II - Aquatic Ecosystem Restoration - Pollack Lake and Hastings Creek (Raven Glen), Antioch, Lake County, Illinois. ** PROJECT DESCRIPTION: The project involves restoring approximately 429 acres of historically significant natural communities, including wetlands, prairies, savannas, woodlands, and stream habitats. Major actions include remaindering Hastings Creek, eradicating invasive plant species, restoring instream habitat, disabling existing agricultural drain tiles, and establishing native plant communities based on site-specific hydrology and topography. Objectives are to enhance native habitat, biodiversity, and ecological connectivity; improve water quality and flood resilience; and expand recreational opportunities. All work will occur on lands owned by the Lake County Forest Preserve District. ** ACQUISITION INFORMATION: Competition for this acquisition is FULL AND OPEN, UNRESTRICTED TOBUSINESS SIZE. The North American Industry System Classification Code is 238910, with a small business size standard in dollars of $19.0 Million. The requirement is for five (5) years. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. **The solicitation is downloadable from PIEE only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. ** IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID/PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid/proposal in response to the Solicitation. Use the PIEE System Registration link: https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. ** ** Offeror Inquiries. A. Mandatory use of PROJNET. All bid questions must be submitted via the Bidder Inquiry in ProjNet at https://www.ProjNet.org/ProjNet. Projnet is NOT a substitute for the submission of proposals in PIEE. If Offerors are not a current Projnet registered user then they must self-register into the system. The Projnet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) and maybe contacted via phone a 1-800-428-HELP.B. New ProjNet User Instructions. i. From the ProjNet home page, click on Quick Add on the upper right side of the screen. ii. Identify the Agency. This should be marked as USACE. iii. Enter the Bidder Inquiry Key: 6X8M9H-HUA35S. iv. Email. Enter the email address you would like to use for communication. v. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form. vi. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. vii. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. C. Previous ProjNet User Instructions. i. Prior user of ProjNet should have received an email any type of password. Use your previously Secret Answer to a Secret Question to log in. ii. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. iii. Identify the Agency. This should be marked as USACE. iv. Key. Enter the Bidder Inquiry Key listed above. v. Email. Enter the email address you used to register previously in ProjNet. vi. Select Continue. A page will then open asking you to enter the answer to your Secret Question. vii. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. viii. From this page you may view all bidder inquiries or add an inquiry. D. Limitations. i. Offerors should review the specification in its entirety and answers to previously submitted inquires in the Bidder Inquiry System prior to submission of a new inquiry. When the technical team answers an inquiry, the system will provide the government response via email to the inquirer. ii. Offerors may submit only one question per inquiry. All inquiries containing multiple questions will be rejected. iii. Information concerning the status of the evaluation and/or award will NOT be entertained. Only questions pertaining to the Contract will be entertained. iv. Government responses are not binding on the Government unless an amendment is issued on PIEE.gov/SAM.gov. In the case of any conflicts, the last posted notice or, if applicable, amendment posted to PIEE.gov/SAM.gov governs. Any changes or revisions to the solicitation Notice will be issued on PIEE.gov/SAM. gov. v. The ability to enter technical inquiries and questions relating to proposal procedures will be disabled May 18, 2026. ** ** The Point of Contacts for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil, and Sara King at sara.t.king@usace.army.mil. ** Please include Solicitation number W912P626RA009 on all correspondence. **
35%
AwardedOpen
** EFFECTIVE JUNE 1, 2026: The government has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE MAY 28, 2026: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE MAY 27, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE MAY 19, 2026: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ** ** This Solicitation Notice, relates to Pre-Solicitation W912P626RA009, and is being issued by the United States Army Corps of Engineers - Chicago District for Upper Des Plaines River and Tributaries Phase II - Aquatic Ecosystem Restoration - Pollack Lake and Hastings Creek (Raven Glen), Antioch, Lake County, Illinois. ** PROJECT DESCRIPTION: The project involves restoring approximately 429 acres of historically significant natural communities, including wetlands, prairies, savannas, woodlands, and stream habitats. Major actions include remaindering Hastings Creek, eradicating invasive plant species, restoring instream habitat, disabling existing agricultural drain tiles, and establishing native plant communities based on site-specific hydrology and topography. Objectives are to enhance native habitat, biodiversity, and ecological connectivity; improve water quality and flood resilience; and expand recreational opportunities. All work will occur on lands owned by the Lake County Forest Preserve District. ** ACQUISITION INFORMATION: Competition for this acquisition is FULL AND OPEN, UNRESTRICTED TOBUSINESS SIZE. The North American Industry System Classification Code is 238910, with a small business size standard in dollars of $19.0 Million. The requirement is for five (5) years. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. **The solicitation is downloadable from PIEE only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. ** IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID/PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid/proposal in response to the Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. ** ** Offeror Inquiries. A. Mandatory use of PROJNET. All bid questions must be submitted via the Bidder Inquiry in ProjNet at https://www.ProjNet.org/ProjNet. Projnet is NOT a substitute for the submission of proposals in PIEE. If Offerors are not a current Projnet registered user then they must self-register into the system. The Projnet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) and maybe contacted via phone a 1-800-428-HELP.B. New ProjNet User Instructions. i. From the ProjNet home page, click on Quick Add on the upper right side of the screen. ii. Identify the Agency. This should be marked as USACE. iii. Enter the Bidder Inquiry Key: 6X8M9H-HUA35S. iv. Email. Enter the email address you would like to use for communication. v. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form. vi. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. vii. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. C. Previous ProjNet User Instructions. i. Prior user of ProjNet should have received an email any type of password. Use your previously Secret Answer to a Secret Question to log in. ii. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. iii. Identify the Agency. This should be marked as USACE. iv. Key. Enter the Bidder Inquiry Key listed above. v. Email. Enter the email address you used to register previously in ProjNet. vi. Select Continue. A page will then open asking you to enter the answer to your Secret Question. vii. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. viii. From this page you may view all bidder inquiries or add an inquiry. D. Limitations. i. Offerors should review the specification in its entirety and answers to previously submitted inquires in the Bidder Inquiry System prior to submission of a new inquiry. When the technical team answers an inquiry, the system will provide the government response via email to the inquirer. ii. Offerors may submit only one question per inquiry. All inquiries containing multiple questions will be rejected. iii. Information concerning the status of the evaluation and/or award will NOT be entertained. Only questions pertaining to the Contract will be entertained. iv. Government responses are not binding on the Government unless an amendment is issued on PIEE.gov/SAM.gov. In the case of any conflicts, the last posted notice or, if applicable, amendment posted to PIEE.gov/SAM.gov governs. Any changes or revisions to the solicitation Notice will be issued on PIEE.gov/SAM. gov. v. The ability to enter technical inquiries and questions relating to proposal procedures will be disabled May 18, 2026. ** ** The Point of Contacts for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil, and Sara King at sara.t.king@usace.army.mil. ** Please include Solicitation number W912P626RA009 on all correspondence. **
35%
Solicitation06/04/2026

Additional Details

Solicitation Number

6913G626Q300028

Archive Date

Jun 23, 2026

Office Address

CAMBRIDGE, MA, 02142