Rosebud Lift Station Construction
Archived on September 30, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM PDT
- Posted
- September 9, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of Health and Human ServicesINDIAN HEALTH SERVICE
Notice details
- Office
- DIV OF ENGINEERING SVCS - SEATTLE
- Place of performance
- Rosebud, South Dakota, 57570
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 75H70126R00030
- Notice ID
- 4e96251733a74db497c4451408ca5ca7
Description
Amendment 4: Cancellation Notice
The Government hereby cancels Solicitation No.75H70126R00030 for Rosebud Lift StationConstruction in its
entirety.
After evaluation of proposals received, the Government has determined that cancellation of the solicitation is
in the best interest of the Government.
The Government intends to review the requirement and may reissue a revised solicitation at a later date.
Amendment 3: Add the Geotech Report.
1. The purpose of this amendment is to add a geotechnical repost from 300 feet away from the site.
2. Attachment J02a RB Geotech Report from 300 feet away is added.
3. All other terms and conditions remain unchanged.
Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC.
1. The purpose of this solicitation amendment A02 is to:
a. Update the pump requirements.
2. Attachment J03 Tech Specs RLSC, paragraph 2.4 Sewage Pumps, F. Pump Performance Requirements is amended as follows:
- Item 1. Capacity is changed from 95 gpm to 125 GPM .
- Item 3. Total Dynamic head is changed from 63 feet to 80 feet .
3. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for
acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.
4. All other terms and conditions remain unchanged.
----------------------------------------------------------------------------
Amendment 1: Add attachment J03a Plans RLSC and the corresponding SF-30.
----------------------------------------------------------------------------
Request For Proposals (RFP)
Rosebud Lift Station Construction
75H70126R00030
Set-Aside: Total Small Business set-aside.
Product Service Code: Y1ND - Construction of Sewage And Waste Facilities
NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction
- Size Stdr: $45 million
Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd
POP: 240 calendar days
Construction Magnitude: Between $500,000 and $1,000,000
Contract Type: firm-fixed-priced
TERO: TERO is applicable. See Section H.50.
Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.
A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.
This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.
Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.
Primary Point of Contact:
- Daniel Cotto
- Email: daniel.cotto@ihs.gov
- Phone Number: 2404617841
Alternative Point of Contact: (Please don't add unless the primary is unavailable.)
- Andrew E. Hart
- Email: andrew.hart@ihs.gov
- Phone Number: 206-375-4443
Attachments: Refer to the Attachments section.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (15)
- Download
J02a RB Geotech Report from 300 feet away.pdf
1.0 MBAdded in Solicitation version 8Posted - Download
A03 Add Geotech Report from 300 fT Away RLSC.pdf
125 KBAdded in Solicitation version 8Posted - Download
A02 Pump Specs RLSC.pdf
183 KBAdded in Solicitation version 4Posted - Download
A01 Add Attachment RLSC.pdf
123 KBAdded in Solicitation version 3Posted - Download
J03a Plans RLSC.pdf
5.4 MBAdded in Solicitation version 3Posted - Download
J03 Tech Specs RLSC.pdf
3.2 MBAdded in Solicitation version 2Posted - Download
B01 RFP RLSC 75H70126R00030.pdf
3.0 MBAdded in Solicitation version 2Posted - Download
Optional Company Specialized Experience Form.pdf
489 KBAdded in Solicitation version 2Posted - Download
J06 WH-347 Payrolls Exp 31Jan2028.pdf
298 KBAdded in Solicitation version 2Posted - Download
Optional Past Performance Questionnaire.docx
30 KBAdded in Solicitation version 2Posted - Download
J05 Self Performed Calculation Sheet.docx
28 KBAdded in Solicitation version 2Posted - Download
J04 Wage Det SD20260018 18May2026.pdf
62 KBAdded in Solicitation version 2Posted - Download
J01 SOW Rosebud Lift Station Construction.docx
37 KBAdded in Solicitation version 2Posted - Download
J07 Release of Claims.docx
14 KBAdded in Solicitation version 2Posted - Download
J02 Block 17 Support Schedule RLSC.docx
28 KBAdded in Solicitation version 2Posted
Lifecycle
- 6Version 6PresolicitationArchived
Rosebud Lift Station Construction
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
Rosebud Lift Station Construction
- 3Version 3SolicitationArchived
Rosebud Lift Station Construction
- 4Version 4SolicitationArchived
Rosebud Lift Station Construction
- 8Version 8SolicitationArchived
Rosebud Lift Station Construction
- 9Version 9SolicitationArchived
Rosebud Lift Station Construction
- 11Version 11SolicitationArchivedCurrent
Rosebud Lift Station Construction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system. | - | Solicitation | 12/01/2026 |
| - | Awarded | Open | |
Bill Parkin (MAK) | - | Awarded | Open |
Jennifer Brown (COW) | - | Awarded | Open |
| - | Awarded | Open |
Additional Details
Solicitation Number
75H70126R00030
Archive Date
Sep 30, 2026
Office Address
SEATTLE, WA, 98121