GovChime
Notice ID: 046e9498f697466893eecc05ced5a5dcCombined Synopsis/Solicitation

J062--Facility Outdoor Lighting Contract

Archived on May 7, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−04:00
Posted
April 12, 2024
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
Place of performance
VAMC West Haven & Newington 950 Campbell Ave, West Haven, CT, 06516
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C24124Q0404
Notice ID
046e9498f697466893eecc05ced5a5dc

Description

Combined Synopsis-Solicitation for Commercial Products and Commercial Services Revision 01 Effective: 05/30/2023 Description This is a combined synopsis/solicitation for commercial products and services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as RFQ 36C24124Q0404. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-03. The associated North American Industrial Classification System (NAICS) code for this procurement is NAICS 238210 (Electrical Contractors and Other Wiring) size standard $19 Million. This is being bid as a SDVOSB set-aside. The VAMC West Haven 950 Campbell Ave West Haven, CT 06516 is seeking to identify any vendor capable of providing VAMC West Haven with providing Service/Maintenance to West Haven and Newington Campuses Outdoor lighting. This scope of work is to provide details related to a service contract to support this necessary work. Optional site visits can be set up through Todd Spangler todd.spangler@va.gov before 04/19/2024. When providing quotes please price out the base year and 4 option years. All interested companies shall provide quotations for the following: Statement of Work VA Connecticut Healthcare System FMS Department Service Contract for Facility Outdoor Lighting Scope: Provide Fixed Price Contract to Provide Service/Maintenance to West Haven and Newington Campuses Outdoor lighting. Please account for quarterly site visits after dark to assess for inoperable lights, labor hours for daytime and emergent after hours, plus materials for simple repairs any higher echelon repairs (Not typical Maintenance) should be quoted prior to work being started. The quantities are listed below: West Haven Campus: Total poles = 141, total lamps = 156 + 220 assorted wall pack lights Newington Campus: 4 40 Pole lights single head. 42 30 Pole lights single head. 10 30 Pole lights double head. 26 24 Pole lights single head. 6 24 Pole lights double head. 41 Wall packs. 18 Up lights (20 above ground level on exterior canopy). 26 Bollards. Description of services: All work will be performed by a Qualified Electrician Provide Repairs and Maintenance to All Outdoor Lighting in Both West Haven and Newington Campuses to include the following: Repairs of all Facility Pole Lighting. Repairs of all Facility Outside Building Wall Lights. Supply Bucket Truck Services needed to Repair and Maintain Facility Lighting. Perform an initial Detailed Inventory and Numbering of all Outdoor Lighting in West Haven and Newington Campuses. Periodic Site Visits during Evening/ Night hours to inspect and schedule repairs of site lighting deficiencies in West Haven and Newington Campuses. Emergency Response time of four hours or less for Emergent Situations All Labor and Materials shall be Supplied as part of Contract. Any Lighting that is Beyond Economical Repairs shall be replaced with LED Lighting option(s) if available. V.A. Supplied: Contractor Support to Include: Scheduling of repairs/ service on site lighting. Isolation of power/electrical feeds to safely work on De-energized Equipment. Vendor Supplied: Vendor Shall provide all materials and Labor. Vendor Shall supply Bucket Truck services when needed. Vendor shall Submit service reports and Invoices on all Completed Repairs. Vendor shall supply Estimates for repairs/replacements not covered under normal Contract Guidelines. Justification for Services: These Services are needed to ensure adequate outdoor lighting levels for the safety of all Personnel utilizing the West Haven and Newington Campuses. POP will be 05/01/2024 to 04/30/2025 with the option of 4 years. For site visits please reach out to Todd Spangler 203-932-5711 x3216 Evaluation Process Award will be made to the best price, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Vendors quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price, past performance, and capabilities. The following factors shall be used to evaluate offers: 1. Price (Follow these instructions): a. Vendor shall provide a quote for the scheduled drop off dates above. Vendors must also provide all applicable labor rates for the solicited services so they can be compared to the applicable wage determination for compliance with the Service Contract Labor Standards (SCLS) if applicable. b. Ensure your validation is current in the System for Award Management (SAM)( https://www.sam.gov). Federal Acquisition Regulations require that federal contractors register in the SAM database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their quotation. 2. Capable: The vendors quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services in accordance with the Statement of Work in a timely efficient manner. a. Contractor shall demonstrate their corporate experience and approach to meet all requirements. b. Contractor shall provide a list of all services included in the price. c. Contractor shall provide all current and relevant licenses and/or certifications for the State of Massachusetts if applicable. d. If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. e. Contractor shall state and/or demonstrate their ability to meet all requirements and deliverables stated in this solicitation and Statement of Work. Any additional information to further identify how the company is experienced and capable of performing the requested work is welcome. 3. Veterans Preference Factor (per 852.215-70): The Government will assign evaluation credit for an Offeror (prime contractor) which is a Service-Disabled Veteran-Owned (SDVOSB) or a Veteran-Owned Small Business (VOSB). Non-SDVOSB/VOSB Offerors proposing to use SDVOSBs or VOSBs as subcontractors will receive some consideration under this evaluation Factor. a. For SDVOSBS/VOSBs: In order to receive credit under this Factor, an Offeror shall submit a statement of compliance that it qualifies as a SDVOSB or VOSB in accordance with VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors . Offerors are cautioned that they must be registered and verified in Vendor Information Pages (VIP) database (http://www.VetBiz.gov). i. Verified SDVOSBs will receive a 5% price credit (e.g. if a SDVOSB submits an offer of $100.00, it will be evaluated as if it submitted an offer of $95.00). ii. Verified VOSBs will received a 2.5% price credit (e.g. if a VOSB submits an offer of $100.00, it will be evaluated as if it submitted an offer of $97.50). The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition in addition to the following addenda s to the clause: 52.252-2 Clauses Incorporated by Reference (FEB 1998), 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (JUN 2020), 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011), 52.204-13 System for Award Management Maintenance (OCT 2018), 52.204-18 Commercial Government Entity Code Maintenance (AUG 2020), 52.217-9 Option to Extend the Term of the Contract (MAR 2000), 52.228-5 Insurance-Work on a Government Installation (JAN 1997), 52.232-40 Providing Accelerated Payments to Small Business Subcontracting (DEC 2013), 852.212-70 Provisions and Clauses Applicable to VA Acquisitions of Commercial Items (APR 2020) 852.203-70 Commercial Advertising 852.219-74, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside 852.232-72 Electronic Submissions of Payment Requests 852.233-70 Protest Content/Alternative Dispute Resolution 852.233-71 Alternate Protest Procedure 852.270-1 Representatives of Contracting Officers 852.219-74 Limitations on Subcontracting Monitoring and Compliance (JUL 2018) As prescribed in 819.7203(a) insert the following clause: (a) This solicitation includes 852.219-74, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside, (b) Accordingly, any contract resulting from this solicitation is subject to the limitation on subcontracting requirements in 13 CFR 125.6. The Contractor is advised that in performing contract administration functions, the Contracting Officer may use the services of a support contractor(s) retained by VA to assist in assessing the Contractor s compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to Contractor s offices where the Contractor s business records or other proprietary data are retained and to review such business records regarding the Contractor s compliance with this requirement. (c) All support contractors conducting this review on behalf of VA will be required to sign an Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the Contractor s business records or other proprietary data reviewed or obtained in the course of assisting the Contracting Officer in assessing the Contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. (d) Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the Contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The Contractor is required to cooperate fully and make available any records as may be required to enable the Contracting Officer to assess the Contractor s compliance with the limitations on subcontracting or percentage of work performance requirement. (End of clause) 852.219-77 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction. As prescribed in 819.7009(c) insert the following clause: VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) (a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.] (i) [X] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-74 or VOSBs as set forth in 852.219-11. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (ii) [ ] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-74 or VOSBs as set forth in 852.219-11. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-74 or VOSBs as set forth in 852.219-11. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating section 1001 of title 18. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. The Contracting Officer may, at their discretion, require the Contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the Contracting Officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed, and returned with the offeror s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee: _________________________________ Printed Title of Signee: ________________________________ Signature: ______________________________________________ Date: ___________________________________________________ Company Name and Address: _____________________________________________________________________________________ (End of clause) 852.242-71 Administrative Contracting Officer. As prescribed in 842.271, insert the following clause: ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) The Contracting Officer reserves the right to designate an Administrative Contracting Officer (ACO) for the purpose of performing certain tasks/duties in the administration of the contract. Such designation will be in writing through an ACO Letter of Delegation and will identify the responsibilities and limitations of the ACO. A copy of the ACO Letter of Delegation shall be furnished to the Contractor. (End of clause) (xii) Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition and in addition to the following FAR clauses cited, which are also applicable to the acquisition: 52.203-6, 52.204-10, 52.209-6, 52.219-4, 52.219-8, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.222-40, 52.222-50, 52.223-18, 52.225-3, 52.225-13, 52.232-33, 52.222-41 (Wage Determination Central Western Massachusetts VAMC Hampshire County WD 2015-4095 (Rev-21), 52.222-42, 52.222-43, 52.222-55, 52.222-62 (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due NLT 04/22/2024 at 17:00 PM EST. RFQ responses must be submitted via email with RFQ #36C24124Q0404 in the subject line to: Nathan.Langone@va.gov Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is Nathan Langone (Nathan.Langone@va.gov)

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Apr 30, 2026

NAICS

238210

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24124Q0404
  1. Market Research
  2. Combined Synopsis
  1. Market ResearchMar 26, 2024

    J062--Facility Outdoor Lighting Contract

    Notice 58f8ec4b193845f9974212c44daa5459 on SAM.gov

  2. 3×
    Combined SynopsisCurrentApr 2, 2024

    J062--Facility Outdoor Lighting Contract

    Notice 046e9498f697466893eecc05ced5a5dc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Page 2 of 2 Combined Synopsis Solicitation West Haven VAMC Steam Station Replacement (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05. (iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 238220 and small business size standard is $16.5 million. (v) The Government intends to award a firm-fixed price award for Steam Station Replacement at West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission. (vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement IAW the attached (PerformancevWork Statement). Please see the attached PWS for full requirement details. (vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement). (viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Site Visit: 950 Campbell Ave, West Haven CT 06516 Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.   Please post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP. Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered. (2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov. (3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Evaluation Process: Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Price (Follow these instructions): Offeror shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces. Past Performance: Offeror shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. Technical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner. Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement). Contractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement). If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. VISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) Subcontracting Commitments - Monitoring and Compliance This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov. Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov) ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SERVICES QUANTITY UNIT UNIT PRICE AMOUNT Base REPLACE BUILDING 2 STEAM STATION 1.00 JB __________________ __________________ GRAND TOTAL __________________ ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors: ATTACHMENT 3 STATEMENT OF WORK STATEMENT OF WORK REPLACE BUILDING 2 STEAM STATION VA CONNECTICUT HEALTHCARE SYSTEM (VACHS) VA MEDICAL CENTER WEST HAVEN 950 CAMPBELL AVENUE WEST HAVEN, CT 06516 BACKGROUND VA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139. JUSTIFICATION Steam station failure has been identified to be impacting inpatient and critical care areas during winter months. Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures. PLACE OF PERFORMANCE The place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516. PERIOD OF PERFORMANCE The Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP). QUALIFICATIONS To be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System. Bidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract. Bidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System. Service Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations. Service Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein. Service Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site. Bidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work. A full boiler plant steam outage will be conducted prior to the start of this work. Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice. Mandatory Pre Bid: Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010. During the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work. At minimum, bidders shall verify: Existing steam pipe sizes. Existing 1/3 and 2/3 station pipe sizes. Existing regulator sizes. Existing valve sizes. Existing flange sizes, types, ratings, and configurations. Existing strainer sizes and configurations. Existing safety relief valve sizes and configurations. Existing pressure gauge arrangements. Existing condensate and drip piping. Existing support arrangements. Existing piping elevations. Available straight-pipe distances upstream and downstream of regulators. Existing cross tee configuration. Available physical space for the new steam station arrangement. Access into and out of the pit/crawl space. Confined-space access conditions. Rigging requirements. Material handling requirements. Removal path for demolished materials. Installation path for new materials and equipment. Working clearances. Existing interference with piping, structure, ductwork, electrical, equipment, or other utilities. Equipment access requirements. Existing insulation. Existing asbestos-containing or suspect materials. Flanges containing square-head bolts. Existing pipe supports and structural attachment points. Required temporary supports. Required permanent supports. Required access for future service and adjustment. Pressure gauge visibility from outside the pit/crawl space. Conditions affecting off-hours work. Conditions affecting the scheduled steam shutdown. All pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal. Dimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification. The bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price. All Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. Work shall be conducted during WHEN hours. A dedicated steam outage will be scheduled to perform this work to be included. SCOPE OF WORK The Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document. The intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work. The Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site. Description of Services: Service Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor. All LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075. Coordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service. Coordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations. All Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. Coordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service. Complete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval. Furnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA). Protect all equipment in place during replacement activities. In accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1). ASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable. Repair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary. All new steam and condensate line shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded. Tag all existing and new valves and label new piping and components replaced as part of this scope of work. Service provider shall perform all acceptance testing. Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work. Service provider shall clean up work area and all debris. Service provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center. Existing Conditions: The existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include: Existing 2-inch steam pressure reducing station is non-functional. Existing 2-1/2-inch steam pressure reducing station is non-functional. Both existing steam regulators are to be replaced. Existing steam stations are not presently installed in accordance with the required regulator manufacturer's piping arrangement. Existing cross tee is leaking and shall be removed and replaced. Existing pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space. Existing downstream safety relief valves shall be replaced. Existing flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material. Work is located within a restricted-access pit/crawl-space environment. These descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk. Steam Pressure Reducing Station Replacement: Service provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation. Service provider shall furnish and install new pressure reducing stations serving the exiting steam system. Remove existing steam regulators. Remove associating piping necessary to properly rebuild the stations. Remove the leaking cross tee. Remove existing components that prevent compliance with manufacturer required piping arrangements. Furnish and install new steam regulators. Furnish and install new upstream and downstream piping. Furnish and install new fittings and tees. Furnish and install new flanges, gaskets, and flange bolting. Furnish and install unions or breakable connections where appropriate. Furnish and install strainers where required. Furnish and install isolation valves where required by the station configuration. Furnish and install condensate/drip provisions where required. Furnish and install required pipe supports. Modify or replace of existing pipe supports as required. Furnish and install temporary support of existing piping during demolition and installation. Reconnect all existing steam piping. Furnish and install all miscellaneous piping modifications necessary for the completed installation. Steam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required: Upstream straight-pipe distance. Downstream straight-pipe distance. Valve arrangement. Strainer arrangement. Pressure sensing arrangement. Drip-leg arrangement. Condensate removal provisions. Gauge locations. Bypass configuration, if required. Regulator orientation. Service clearances. Maintenance clearances. Safety relief requirements. Existing conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid. Equipment and Pipe Sizing: All equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify: Existing pipe sizes. Required regulator inlet size. Required regulator outlet size. Required regulator capacity. Required steam pressure. Required downstream pressure. Required steam flow. Safety valve capacity. Safety valve set pressure. Strainer sizing. Valve sizing. Flange pressure class. Pipe schedule. Applicable steam pressure and temperature ratings. The contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection. Manufacturer Requirements Prior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application. The completed station shall comply with all manufacturer requirements. Pressure Gauges Provide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation. Steam-rated gauge. Gauge siphon. Isolation valve. Piping and fittings. Supports. Identification. Appropriate protection from damage. Gauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation. Safety Relief Valves Remove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations. Provide new safety relief valves properly selected and sized for the actual system conditions. The contractor shall verify: Required relieving capacity. Inlet pressure. Downstream operating pressure. Safety valve set pressure. Valve inlet size. Valve outlet size. Discharge pipe size. Required discharge arrangement. Safety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements. Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination. Cross Tee Replacement Remove the existing leaking cross tee. Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough. All associated piping modifications required to complete this work shall be included. Pipe Supports Provide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for: Pipe weight Valve weight Regulator weight Strainer weight Safety valve weight Thermal expansion Operating loads Maintenance loads Existing equipment shall not be improperly used as a pipe support. Any temporary supports necessary during demolition and installation shall be included. Insulation Remove existing insulation as necessary to perform the work. Provide new insulation at all disturbed or newly installed piping after successful testing and startup. New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced. Asbestos Abatement Existing flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM). Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM. Wrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange. Dispose of flanges as ACM. Abatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement. Rigging and Material Handling: The contractor shall include all rigging and material handling required to remove existing equipment and install new equipment. The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid. Testing: Following installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable: Pressure testing Leak testing Flange inspection Valve inspection Regulator inspection Gauge verification Safety valve verification Repair any leaks or deficiencies associated with the new work at no additional cost to the government. Startup and Commissioning: Following completion of the installation: Start the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor. Verify proper regulator operation. Adjust regulators to the required operating pressures. Set the 1/3 station. Set the 2/3 station. Verify proper transition and operation between the two regulators where applicable. Verify downstream pressures. Verify gauge readings. Verify valve operation. Verify safety valve installation. Verify proper condensate drainage. Inspect all new piping and connections for leakage. Make final adjustments required for proper system operation. The steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer. VA Specifications and Code Compliance: All materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope. Materials: All materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class. Substitutions shall not be made without approval. Demolition and Disposal Remove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations. The work area shall be broom-clean and free of construction debris following completion. Protection of Existing Conditions: The contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work. Any damage caused by the contractor shall be repaired at the contractor s expense. The bidder shall include reasonable temporary protection required to perform the work. Bidder Responsibility for Complete Scope: The bidder is responsible for providing a complete turnkey price based on: This Scope of Work Mandatory Site Inspection Existing Field Conditions Applicable VA Requirements Applicable Codes Manufacturer installation requirements Proper methods of constructing assemblies associated with the Scope of Work. The bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation. The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work. Bid Clarifications and Exceptions: Any ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer. Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price. The successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work. SUBMITTALS/DELIVERABLES Service provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work. Service provider shall furnish all material certifications for any replacement parts used. Service provider shall furnish a waste manifest as required. SPECIAL INSTRUCTIONS All service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours. General: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed. Approved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits. Site Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort. The service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation. The service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion. The service provider shall develop and provide to the VA the following: Safety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope. All applicable personnel on site are required to obtain an Occupational Safety and Health Administration (OSHA) 10 hour construction certification, and the site competent person for the service provider must obtain an OSHA 30 hour construction certification. Per VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees. No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time. Parking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others. Billing: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. Safety Codes / Certification / Licensing: Environmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist. The Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports. The C&A requirements do not apply and a Security Accreditation Package is not required. NARA Records Management Requirements The following standard items relate to records generated in executing this contract: Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. The Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.]. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. The Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
-Combined Synopsis12/03/2026
(i) This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. (ii) This solicitation is issued as a request for quotations (RFQ) # 36C24927Q0027. (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2026-01 (eff. 03/13/2026) FAR Deviation APR 2026 (eff. 04/23/2026) VAAR DEVIATION OCT 2026 (eff. 10/01/2026) VAAM Alert 26-01 (eff. 10/01/2025) Acquisition Policy Flash 27-02 eff. 10/01/2026). (iv) This procurement is a 100% Service-Disabled Veteran-Owned Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this requirement is NAICS Code 238210 Electrical Contractors and Other Wiring Installation Contractors ($19 million dollars) SBA Size Standard. Business size status shall be listed and verified with the US Small Business Administration's Small Business Search at https://search.certifications.sba.gov/, at the time of quote submission and award. (v) This is a base plus four one-year option service contract to provide annual preventative maintenance and load bank testing on power generators and fuel tanks as listed below. Below is a template for pricing. Contractors may provide their own pricing document, but it must be broken down to allow for lowest price technically acceptable determination. (vi) The following solicitation provisions apply to this acquisition: 1. FAR 52.212-1, Instructions to Quoters Commercial Items (Addendum attached) 2. FAR 52.212-2, Evaluation-Simplified Acquisition Procedures 3. FAR 52.212-3, Offerors Representations and Certifications Commercial Items (www.sam.gov registration is required to be complete at time of submission of response) (vii) The following clauses are applicable to this acquisition: FAR 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services and any addenda to the clause. FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services and regarding which, if any, of the additional FAR clauses cited in the clause are applicable to this acquisition. (viii) Quotes are due November 19, 2026 by 12:00 PM CT. Quotes shall be submitted via email to: adrian.king@va.gov. Quotes received after this date and time will be considered late in accordance with FAR Provision 52.212-1 and will not be evaluated unless the Contracting Officer determines the late quote will be accepted IAW FAR 52.212-1(f)(2)(i)(A-C). Instructions are listed on page 7-9. Quoters shall review the Statement of Work (SOW) below and provide pricing using the following Price/Cost Schedule.
-Combined Synopsis12/09/2026
2 | Page 1. This is a combined synopsis/solicitation for commercial services/items prepared in accordance with the format in FAR Subpart 12.2 in conjunction with FAR Part 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. 1.a. Project Title: Annual REC Solar Panel Maintenance 1.b. Description: VA Greater Los Angeles Healthcare System located at 11301 Wilshire Blvd; Los Angeles CA 90073 is seeking a contractor to provide preventive maintenance services on VA owned REC solar panels and solar inverters at the VA West Los Angeles Campus, 11301 Wilshire Blvd., Los Angeles, CA 90073. 1.c. Project Location: VA Greater Los Angeles Healthcare System, 11301 Wilshire Blvd, Los Angeles, CA 90073 1.d. Solicitation Type - Number: Request for Quotes (RFQ) - 36C26227Q0119. 1.e. Set Aside: This solicitation is issued as an SDVOSB set aside. 1.f. Applicable NAICS code: 238210 Electrical Contractors and Other Wiring Installation Contractors. 1.g. Small Business Size Standard: $19 million 1.h. Type of Contract: Firm Fixed Price 1.i. Period of Performance: Base year plus 4 option years 1.j. Wage Determination applicable to this project: SCA WD 2015-5613 revision 34 1.k. Questions regarding the solicitation should be submitted via email no later than 2pm PST Monday, November 30th, 2026, to ositadima.ndubizu@va.gov 1.l. Job walk will be conducted at 11am on Monday, November 23rd, 2026. Participants will meet with Ross Manoukian and Moses Dominguez in Bldg. 63 at the VA Greater Los Angeles Medical Center, 11301 Wilshire Blvd, Los Angeles, CA 90073. A location map is attached to this solicitation. Please reach out to Moses Dominguez at 310-904-4009 if you need to locate the meeting point. Please email ositadima.ndubizu@va.gov to indicate intent to participate 1.m. Company info and quote should be in the attached Enclosure 1 form. All other forms of offer will not be accepted. Your enclosure form and capabilities statement/experience should be sent in one email with 2 separate email attachments, or it will not be accepted 2. Statement of Work BACKGROUND. The purpose of this contract is to have a contractor provide training, maintenance, repair, inspection and cleaning of the VA WLA Solar PV inverters and arrays. Contractor shall provide all maintenance and services. The Contractor shall furnish all parts, labor, equipment, qualified personnel, qualified supervision, and transportation necessary. SCOPE. Contractor shall provide services as follows: Preventative Maintenance Service Description Service Frequency General Inspections: Visual inspection for signs of damage, overall wear and tear, module breakage, loose conduit, broken straps, etc. Sample check torque marks and tighten loose connections 2x/yr Electrical Inspections and Maintenance: Perform Check integrity of weather resistance (seals, hubs and weather stripping) Check electrical equipment housing for signs of corrosion Perform Infrared scans, as needed In Contract Year 1 only, four single-technician, one-day dispatches for labor only corrective maintenance as needed 1x/yr Inverter Inspections and Maintenance: Check integrity of weather resistance (seals, hubs and weather stripping) Check inverter housing for signs of corrosion Clean inverter air vents and heat sink clean filters Replace inverter filters in AE Solaron model 250, 333, 500 and Satcon model 75, 250 central inverters Perform Infrared scans, as needed 1x/yr Array Washing: Includes normally expected soiling conditions. Heavy cleaning, such as excessive soiling, debris removal, bird droppings and soot, not to exceed 10% of total array 2x/yr & Additional Upon request Carport Solar Panel Washing and Cleaning: Carport Solar Panel Washing & Cleaning to occur on a weekend. 2x/yr Vegetation Control: Remove or mow weeds and grasses located in accessible areas under the array. Turn off solar panels and ensure solar panels and inverters are not damaged. 1x/yr Contractor shall provide a completed maintenance checklist within 3 weeks following each visit, which includes a list of issues discovered, resolution, and accompanying photos as appropriate. Carport solar panel washing & cleaning needs to be performed on the weekends. Solar Panel Locations: Solar Array Location Solar Monitoring Inverters myPVData 333 KW Solaron Inverter Site 3- West of Building 304 Employee Parking Lot myPVData Two 333 KW Solaron Inverter Site 4- West of Building 402 Employee Parking Lot myPVData One 333 KW and one 250KW Solaron Inverters Site 5- Ground Mount North of Helipad myPVData 250 KW Solaron Inverter Building 500 Rooftop myPVData 250 KW Satcon Inverter Buildings 510 & 511 Rooftops myPVData 75 KW Satcon Inverter Building 213 Rooftop Draker (2) SMA SB 9000TL & (2) SMA SB 8000TL Building 218 Rooftop Draker (5) SMA SB 9000TL Building 222 Rooftop Draker (2) SMA SB 9000TL & (2) SMA SB 8000TL Building 401 Rooftop Draker (2) Refusol 016K & (2) Refusol 012K Building 304 Rooftop Draker (2) Refusol 020K & (2) Refusol 016K Building 508 Rooftop Draker (6) SMA SB7000TL Parking Lot 12 & 299 Draker (1) 250 KW Solaron Parking Lot 49 Draker (1) Refusol 024K, (4) Refusol 020K, & (2) Refusol 012K South of Heliport Ground Mount Draker 500 KW Solaron Inverter The Government will provide the following: Site access and a safe working environment. Facility contacts to provide real time information about site conditions (power outage, active construction, etc.). Coordination and closing the parking area for the washing and maintenance activities during the weekends. Contractor can use VA West LA outdoor water source but may have to provide means to transport water as needed and required if water source is not close to solar arrays. Contractor to verify water sources. Field work will be performed during local business hours unless otherwise agreed by the solar contractor and the VA COR The Contractor will not provide the following: Hardware or firmware upgrades or refurbishments Installation refurbishments to bring equipment in compliance with new code or revised manufacturer requirements. Cosmetic corrosion repair. Rules of the Station: Contractor shall comply with all rules of the facility, including security badging, non-smoking and privacy, and reporting to the COR upon arrival at the facility. The Contractor shall present a neat, well-groomed, professional appearance at all times. The Contractor personnel shall not wear sandals, flip-flop style footwear, or open-toed shoes. Safety: Contractor shall perform electrical safety measurements on all equipment in use under this contract. The standards to be used are those of the National Fire Protection Agency code 99. A copy of these codes shall be provided by the VA Engineering Department upon request. These standards shall be strictly enforced. Any equipment not meeting the minimum standards shall be considered inoperable until such time as its passes the minimum standards. All equipment shall be subject to inspection by VA Engineering personnel to verify compliance with these standards. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VA property shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract. Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Contractor shall take such safety precautions as necessary to protect the lives and health of the occupants of the building. Fire and safety deficiencies, which exist and are part of the responsibility of the Contractor shall be immediately corrected. If the Contractor fails or refuses to correct deficiencies promptly, the CO may issue an order stopping all, or any part, of the work. Contractor shall comply with all applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract. The Contractor personnel shall follow applicable facility policies concerning fire/disaster programs. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137 Contractor should provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employee s fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government. PERFORMANCE MONITORING. VA COR will be delegated to each facility to assist the Contracting Officer in the administration and monitoring of the resulting contract. A Delegation of Authority letter issued to the COR, a copy of which will be sent to the Contractor, states the responsibilities and limitations of the COR. The COR is not authorized to change any of the terms and conditions of the resulting order. The Contracting Office Representative (COR) will monitor contractor performance. The COR will certify the work was done in accordance with the SOW. COR will inspect the system once the service has been completed and the system is returned to normal operation. The Contractor shall comply with all applicable regulations and guidelines of the Joint Commission (JC), Occupational Safety and Health Administration (OSHA), California Public Utility Commission and/or any other pertinent federal, state, and local policies relating to the herein mentioned work. All tasks accomplished by the Contractor personnel shall be performed to preclude damage or defacement to patient or Government-owned property, equipment, and facilities. The Contractor shall report any damage caused by the Contractor personnel to the COR. The Contractor shall replace items or repair property, equipment, or facilities to previous condition, if the Contractor is determined to be at fault for the damage. Only those services specified herein are authorized under this contract. Before performing any service or repairs of a non-contract nature, the COR or Contracting Officer must be advised of the reasons for this additional work. If appropriate, the Contracting Officer or his/her designee may authorize the additional emergency and unforeseen repairs under a separate purchase authorization or this contract. The Vendor is cautioned that only the Contracting Officer may authorize additional services or repairs and that reimbursement will not be made unless this prior authorization is obtained. PERIOD OF PERFORMANCE. The period of performance is Base Year plus up to four (4) option years This project shall be completed Monday Through Friday, 7:00 AM to 5:00 PM, except on Federal holidays or any other holiday declared by the President of the United States as a national holiday. SERVICES OUTSIDE OF NORMAL SERVICES: Hours of Operation as agreed to in writing between the Contractor and Contracting, for solar cleaning of carports to be performed preferably during weekends. Solar carports will be washed and cleaned during the weekends The Vendor is not required to provide service on the following National holidays, nor shall the Vendor be paid for these holidays. The following national holidays observed by the Federal Government New Year s Day January 01 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 04 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 CONTRACTOR EMPLOYEES The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC). Badge. Contractor shall obtain a Contractor I.D Badge from the VA Police. All Contractor personnel are required to wear I.D Badge during the entire time on VA facility. The I.D Badge MUST have an identification picture and shall state the name of the individual and the company represented. PARKING: It is the responsibility of the contract personnel to park in the appropriate designated parking areas. Parking information is available from VA Police & Security Service Office. The Contractor assumes full responsibility for any parking violations. Smoking is strictly prohibited on the grounds of any VHA facility. Per VHA Directive 1085 dated March 5, 2019, it is VHA policy that all VHA health care facilities, including hospitals, community clinics, administrative offices, and Vet Centers, will be smoke-free for patients, visitors, contractors, volunteers, and vendors effective October 1, 2019. There will no longer be designated smoking areas. INSURANCE COVERAGE a. The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract. b. The Government shall be held liable for any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract. c. Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer. d. The Contractor shall furnish to the Contracting Officer within fifteen (15) days of award an Official Certification from the insurance company indicating that the coverage has been obtained and that it may not be changed or cancelled without guaranteed thirty (30) day notice to the Contracting Officer. New certifications shall be furnished at least thirty (30) days prior to the expiration date of the current insurance policy. The phrase will endeavor is not acceptable terms to the Government and such coverage carrying that phrase will be rejected and services may not be rendered until proper certificate is issued. e. SUPPLEMENTAL INSURANCE REQUIREMENTS In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract: (a) Workers' compensation and employer s liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (b) General Liability: $500,000.00 per occurrence. (c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage. (d) The successful bidder must present to the Contracting Officer, prior to the award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage. E.1 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES GENERAL INSTRUCTIONS TO OFFERORS: Submit written offers in accordance with the following instructions, as well as Addendum to FAR 52.212-1, Instruction to Offerors. Oral offers will not be accepted. Complete and submit enclosure 1 via email no later than 10am PST Monday, December 7th, 2026, to ositadima.ndubizu@va.gov. Ensure the following are completed and/or included in the quote packet: Vendor Information with UEI number (Company info and quote should be on Enclosure 1 form pg. 1) Acknowledgement of amendments (Enclosure 1 form pg. 1) Concurrence/non-concurrence with solicitation terms, conditions, and provisions (Enclosure 1 form pg. 1) Schedule of services (Enclosure 1 form pg. 2) FAR 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services (Enclosure 1 form pg. 4) VAAR 852.219-75, VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction (Enclosure 1 form pg. 2) Company info and quote should be on the attached Enclosure 1 form. All other forms of offer will not be accepted. Your enclosure form, capabilities statement/experience and any certifications/Training should be sent in one email on separate email attachments, or it will not be accepted. SPECIAL STANDARDS OF RESPONSIBILITY To assist the contracting officer in determining if the special standards of responsibility applicable to this procurement are met, offerors are asked to provide the following information with their [offers]. Failure to include this information could result in a contracting officer s determination that an otherwise successful offeror is not eligible for the contract award. SP1: Special Licensure. Offeror or proposed subcontractor shall submit evidence that they are an authorized service provider for REC Solar Commercial Corporation. SP2: Specialized Training. Offerors or proposed subcontractor shall submit evidence that they possess a 30-hour Occupational Safety and Health Administration (OSHA) safety card issued by the State of California. The Lead Solar PV Technician submit evidence that they possess a 10-hour Occupational Safety and Health Administration (OSHA) safety card issued by the State of California. Evidence of passing the NABCEP Entry Level Exam is preferred, not required. North American Board of Certified Energy Practitioners (NACEP) Certified PV Installation Professional is preferred (not required).  SP3: Specialized Experience. Contractor must have at least 7 years experience troubleshooting, repairing, obtaining necessary parts to repair Satcon 75KW, 250KW, AE Advanced Energy Solaron 250 KW, 333 KW, 500 KW, SMA and Refusol type of solar inverters. The Lead Solar PV Technician shall have at least 2 years of electrician experience; 7 years of Solar PV experience. Project Manager/Field Supervisor shall have at least 7 years of Solar PV experience with similar size solar projects over 3 MW of solar system. Offeror shall provide references for which the contractor has performed services as described in the scope. The narrative must include contract numbers or reference point of contact to include  telephone numbers and e-mail addresses. References will be contacted to verify technical capability to fulfil the requirements listed in the Scope of work. If Offeror intends to satisfy this requirement through use of a proposed subcontractor(s), Offeror must provide this information for each proposed subcontractor. (End of provision) ADDENDUM to 52.212-2 Evaluation Commercial Products and Commercial Services (NOV 2021) (a) Basis of Award. This procurement is being conducted pursuant to FAR Part [13] procedures. The Government intends to award a contract resulting from this solicitation to the responsible offeror whose [offer], conforming to the solicitation, [offers] the lowest price, whose [offered] price does not exceed the amount of funding available for the procurement, and whose [offered] price is found to be reasonable. Price alone is the sole evaluation factor. In addition to the general standards of responsibility found at FAR § 9.104-1, in accordance with FAR § 9.104-2, the special standards of responsibility described below apply to this procurement. Offerors who fail to meet any special standard of responsibility will not be eligible to receive a contract award.  (b) Evaluation Process. Quotes will be evaluated in the following manner. The lowest-priced quote will be identified. The lowest-priced quote will be evaluated to determine if the quoted price exceeds the amount of funding available for the procurement. If the quoted price does not exceed the amount of funding available for the procurement, the quoted price will be evaluated to determine if it is reasonable. If the quoted price is found to be reasonable, the offeror who submitted this quote will be identified as the successful offeror. The contracting officer will then determine if the successful offeror is responsible using the general standards of responsibility and the special standards of responsibility applicable to this procurement. If a contract award cannot be made to the successful offeror, the contracting officer will evaluate the next lowest-priced quote following the procedures described above. This process will continue until a contract award can be made, or the contracting officer determines that no contract award can be made. The contracting officer may find all quotes not acceptable and cancel the solicitation if the lowest-priced quote exceeds the amount of funding available for the procurement. The contracting officer may likewise find a quote under evaluation, as well as all remaining quotes, not acceptable and cancel the solicitation if the quote currently under evaluation exceeds the amount of funding available for the procurement. The Government intends to evaluate quotes and award a contract without discussions with offerors. However, the Government reserves the right to conduct discussions at any time if determined by the contracting officer to be in the Government s interest.   (c) Options. The Government will evaluate [offers / quotes] for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an [offer] is unacceptable if the option prices are significantly unbalanced or if the [offered] price for the basic requirement or any option exceeds the amount of funding available for any of those requirements. Evaluation of options should not oblige the Government to exercise the option(s).   (d) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before the award.  (End of provision) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-04, dated 6/11/2025. Full versions of the following provisions and clauses for this solicitation can be found in enclosure 2. 3.a. FAR 52.212-1, Instructions to Offerors Commercial Items 3.b. FAR 52.212-2, Evaluation -- Commercial Items 3.c. FAR 52.212-4, Contract Terms and Conditions -- Commercial Items 3.d. FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items 3.e. VAAR 852.219-73, VA Notice of Total Set-Aside for Verified Service-Disabled Veteran-Owned Small Businesses 3.f. VAAR 852.219-75, VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction. 3.g. FAR 52.233-2, Service of Protest 3.h. VAAR 852.233-70, Protest Content/Alternative Dispute Resolution 3.i. VAAR 852.233-71, Alternative Protest Procedure 3.j VAAR 852.222-71 Compliance with Executive Order 13899
-Combined Synopsis12/07/2026
1. General: Project Location: C.W. Bill Young VA Medical Center located at, 10000 Bay Pines Blvd. Bay Pines, FL. 33744. These nine (9) emergency exit signs fixtures are for the Laundry Building (Building 13) by the Project Manager: Dale McDowell, Fire Protection Engineer. 2. Purpose: Provide all labor, materials, equipment, supervision, and testing necessary to furnish and install nine (9) illuminated emergency exit signs throughout Laundry Building, to improve occupant egress identification and life safety. This solicitation will be a Firm Fixed Price SDVOSB set aside, this solicitation will start on or about the 10th of November.
-Pre-Solicitation11/11/2026
This amendment is to address typographical errors regarding offer due date and the site visit information on RFQ 36C24927Q0038 page 2, replaced entirely below: Offer due date: 11/30/2026 @11:00am CT Site visits are scheduled on Monday 11/16/2026 at 08:30am ET for the Lexington Sousley Campus 2250 Leestown Road, Lexington, KY 40511, Bldg. 20 and Tuesday 11/17/2026 at 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby. No other changes are made at this time.
-Combined Synopsis11/30/2026

Additional Details

Solicitation Number

36C24124Q0404

Archive Date

May 7, 2024

Office Address

TOGUS, ME, 04330