GovChime
Notice ID: af69b1bc8b4ee6bcf5ff4e111d102bebCombined Synopsis/Solicitation

Northern Service Center Operations Division (NSCOD) Indefinite Delivery Indefinite Quantity (IDIQ) Contracts for Architectural and Engineering Services (A/E)

Archived on January 1, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
June 7, 2018
Notice type
Combined Synopsis/Solicitation
Set-aside
Partial Small Business Set-Aside (FAR 19.5)
NAICS
541310: Architectural Services
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R5 ACQUISITION MANAGEMENT DIVISION
Place of performance
Acquisition Management Division, Northern Construction Contracts Team (5P1QCA-SF), Springfield, IL, 62703
PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Dec 4, 2025

Identifiers

Solicitation number
47PF0018R0061
Notice ID
af69b1bc8b4ee6bcf5ff4e111d102beb

Description

Solicitation Number: 47PF0018R0061 Notice Type: Combined - Synopsis/Solicitation This notice is a Request for Qualifications only. The Government may award to design teams led by either an Architectural or an Engineering firm. The request for qualifications will be conducted in accordance with FAR Part 36, construction and architect-engineer contracts. The Request for Qualifications due date and time is: Wednesday, May 9, 2018, no later than 2pm (CST) Contracting Office Address: General Services Administration Public Buildings Service 520 S. Eighth Street Springfield, IL 62703 Place of Performance: General Services Administration (GSA) Region 5, the States of Minnesota, Wisconsin, and Michigan. In the event of additional GSA needs for A/E Services within Region 5, (Illinois, Indiana, Ohio and Michigan) but outside of a contractors designated zone - a mutual agreement between GSA and the prospective firm may be proposed. Offer and/or acceptance of such a request would not be mandatory or required. Primary Point of Contact: Jesse L. Jones Contracting Officer U.S. General Services Administration Acquisition Management Division Northern Construction Contracts Team 520 S. Eighth Street Springfield, IL 62703 Office: (217) 492-4290 Cell: (217) 494-1263 Secondary Point of Contact: Matthew DeLeonardis Contract Specialist U.S. General Services Administration Acquisition Management Division Northern Construction Contracting Team 230 S. Dearborn St. Chicago, IL 60604 Office: (312) 385-3061 Cell: (312) 257-7536 Synopsis: This contract will result in multiple, indefinite delivery, indefinite quantity (IDIQ) contracts to provide the “States of Minnesota, Wisconsin, and Michigan” with Architecture and Engineering (AE/EA) services led by either an architectural or an engineering firm. These services are to be consistent with the Guiding Principles of GSA's Design Excellence program http://www.gsa.gov/portal/category/21079 for a variety of project types across a wide range of project budgets. Assembled teams should be well rounded and clearly identify relevant concentrated areas of expertise. Architectural and Engineering (AE/EA) Services will be rendered for projects primarily managed by GSA’s Northern Service Center Operations Division (NSCOD). This is an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide professional Architecture and Engineering (AE/EA) services for projects on or within federal properties and facilities, owned and/or leased, in GSA Region 5 NSCOD. This IDIQ contract will be broken out between two (2) distinct zones: Zone 1 contracts will cover the entire States of Minnesota and Wisconsin and Zone 2 contracts will cover the entire State of Michigan. However both zones 1 and 2 will be required to cover Michigan’s Upper Peninsula. Firms submitting qualifications in each zone will be evaluated independent of the other zone using the same evaluation factors. If a firm is planning to submit qualifications for both zones, they must have a production office in each zone and meet the business size standard identified for that zone. Additionally, if a firm plans to submit qualifications for both zones, that firm will need to prepare two packages, one for each zone. The NAICS codes are 541330 - Engineering Services, with a small business size standard of $15 million and 541310 - Architectural Services, with a small business size standard of $7.5 million. As this procurement is a “Partial Small Business Set-Aside”, Zone 1 is open to all business concerns, while Zone 2 will be restricted to small businesses only. The lead firm must have an existing active production office within the planned geographic zone previously defined so as to minimize direct travel costs on resulting task orders. In the event of additional GSA needs for A/E Services within Region 5 (Illinois, Indiana, and Ohio) but outside of a contractor’s designated zone - a mutual agreement between GSA and the prospective team may be proposed. Offer and/or acceptance of such a request would not be mandatory or required. Most work orders will be executed for repair and alteration projects within existing buildings. The estimated cost of construction at award (ECCA) can range from $2,000 to approximately $3,095,000 (or the current Prospectus Project Threshold), however it is anticipated that the majority of projects will have an ECCA between $50,000 and $500,000. In accordance with Federal Acquisition Regulation (FAR) 15.404-4(c)(4)(i)(B), fees for design services cannot exceed 6% of the ECCA. For general guidance describing included and excluded services, in regards to the 6% fee limitation, see PIB 13-04 Attachment (1). A broad range of services potentially requested under this IDIQ contract may include but are not limited to the following: ? Feasibility, pre-design, and project development studies ? Field investigation, Site surveys ? Concept design, Design development and Construction document development (both engineering and architectural) ? Estimating ? Constructability review and evaluation ? Submittal and shop drawing review ? Historic Preservation ? MEP services, ? Mechanical system assessments and design ? Mechanical component assessments and designs (such as pumps, fans, air handlers, water distribution systems) ? Air distribution assessment and design ? Post Construction Contract Services (PCCS) ? Management and inspection (M&I) services during construction ? Record and close-out documents ? Master planning ? Façade evaluation and remediation design ? Structural evaluation and design ? Historic building assessment, materials review and repair solution/ remediation ? Building condition survey evaluation reports (exterior and interior) ? Fire and Life Safety evaluation and design ? Existing conditions surveys ? Building standard documents ? Interior design including FFE ? Temperature control assessment and design ? BAS system assessment and integration ? Building and system commissioning ? Water infiltration investigation and mitigation design Architectural and engineering disciplines and other specialized expertise that may be required to accomplish the scopes of the task orders include but are not limited to: ? Architecture ? Mechanical Engineering ? Electrical Engineering ? Structural & Civil Engineering ? Plumbing ? Fire Protection ? Life Safety ? Security ? Seismic & Blast ? Vertical Transportation ? Space Planning & Workplace ? Interior Architecture ? Real Estate Market Analysis ? Historic Preservation ? Cost Estimating ? Scheduling ? Master Planning ? Report writing ? Quality control review ? Surveying ? Sustainability & LEED Certification ? Building Information Modeling ? 3-D rendering ? Code Compliance ? Environmental Services The duration of the base period will be one (1) year. The contract will include a clause for four (4) options, each of which could extend the contract for an additional one (1) year period and may be exercised at the option of the Government. The maximum order limitation is $2,000,000 for each one year period. The minimum guarantee for this contract is $2,500 for the base year only. The selected firms must negotiate overhead, profit and hourly rates for major anticipated disciplines to be used in negotiating fixed price task orders in phase II as described below. The AE/EA may be expected to handle multiple projects simultaneously, without compromising timeliness and quality of service to GSA. Professional services for task orders shall be overseen or performed by individuals licensed in the relevant discipline, with a current registration in the state in which the project's construction will occur. Joint ventures and/or consulting arrangements will be considered and evaluated on the demonstrated interdependency of the team members to provide a cohesive quality design effort. In order to encourage participation in this request for qualifications, two pre-submission teleconferences have been scheduled for April 19, 2018. The first call will commence at 9:00am CST for Zone 1 (MN/WI) and the second at 2:00pm CST for Zone 2 (MI). The meeting will be available via teleconference only. Attendance is completely voluntary and will not positively or negatively impact a team’s evaluation. The purpose of the meeting is to answer any industry questions regarding this procurement. Those wishing to attend should RSVP to Jesse Jones, Contracting Officer, at jesse.jones@gsa.gov. In the e-mail, please provide the names of those wishing to attend no later than April 17th, 2018 by 2pm (CST). A conference call-in number will be provided in your RSVP reply. TEAM SELECTION: Team selection is executed through a two-step process where the first step is qualification based and the second step is fee based. This notice is a Request for Qualifications only. No fee information is requested at this time. STEP I: In the first step, teams will submit qualification based on the criteria identified below. A source selection board will review each team’s qualifications and establish a shortlist of firms. The shortlist may be composed of architect-led OR engineering-led teams OR a combination of both. The Government reserves the right to hold interviews with each of the short-listed firms to clarify and confirm submitted information. EVALUATION FACTORS: I. Specialized Experience and Technical Competence (45%): Provide no more than ten (10) example projects. Examples should demonstrate a range of repair and alterations work of similar budgets and complexities as anticipated for the task orders off of the IDIQ contracts. Teams must demonstrate that they are adept at solving a variety of issues and note where their specialized experience is evident, highlighting concentrated areas of expertise such as, work in occupied buildings, building system upgrades, historical preservation, or other (previously noted in this solicitation). Teams must demonstrate success in appropriately addressing a variety of complex as well as routine design issues that seamlessly incorporate architecture and engineering. Each example may be supplemented with photographs, sketches and drawings, or additional information not to exceed 2 double-sided pages. Excellence in architecture and engineering should be addressed through problem solving within existing buildings and achieving creative solutions considering function, scale, image, engineering, and community context, under the constraints of budget, schedule etc. Examples of using emerging, or innovative design and construction processes must be demonstrated. II. Management Plan, Team Structure and Quality Control (25%): Teams must demonstrate a clear and efficient management plan and team structure (which includes sub-consultants) that addresses roles and responsibilities, lines of authority, coordination and communication. Assembled teams should be well rounded and clearly identify relevant concentrated areas of expertise. The management plan should clearly describe: ? The team’s overall design approach. ? The team’s ability to staff and manage task orders on an as-needed basis; accounting for the unpredictable issuance of task orders in terms of number, size, importance and urgency. ? The team’s plan for designing within a negotiated fee in accordance with the 6% fee limitation. Consideration will be given to teams that demonstrate a wide range of experience levels, in multiple disciplines, proving the ability to flexibly staff projects based on complexity and budget constraints. Team must demonstrate processes for quality control and commitment to quality control standards while designing within the project’s budget and schedule limitations. The plan should specifically address coordination efforts with sub-consultants. III. Professional Qualifications (15%) Key Personnel must possess the education, qualifications and project experience that will provide the best opportunity for the successful completion of task orders under this contract. Team’s design philosophy should be balanced and their intent/involvement for accomplishing task orders under this contract should be appropriate. IV. Past Performance (15%) Teams must be able to demonstrate successful past performance on example projects. This can be from the point of view of the client, professional peers and project teammates. Demonstrated success at collaborative relationships with consultants will be positively considered. The Government has the right to use corporate knowledge when evaluating this factor. REQUIRED DOCUMENTS for QUALIFICATION SUBMISSION: Interested firms having the qualifications to meet these requirements are invited to submit three (3) hard copies and one (1) electronic version, that should include the PDF copies of all the required documents including the Standard Form 330 along with a letter of interest. Additionally, please provide only the information requested supplemental information will not be evaluated. Documents should be sent to: Jesse L. Jones Contracting Officer U.S. General Services Administration Acquisition Management Division Northern Construction Contracts Team 520 S. Eighth Street Springfield, IL 62703 Required form 330 information/instructions: Section C: Do not modify the form by providing more than six proposed team members. Prioritize team members and provide those that are the most important to creating the most well rounded team or show your concentrated areas of expertise. It is recommended that firms responsible for the majority of the work submitted in section F be included. Section E: Do not provide any more than 6 key personnel. You will have to prioritize and provide those that best represent your ability to accomplish the requirements of this contract. CEOs and other executive personnel should not be submitted unless they will have direct responsibility for accomplishing the task orders under this contract. It is required that you include the Lead Architectural/Engineering Designer and the Primary Point of Contact that would be responsible for managing this contract and assigning task orders. It is recommended that the Key Personnel directly responsible for work submitted in section F should also be included. Section F: Form can be modified. Each example project should be no more than 3 single sided pages. Photographs, sketches and drawings are strongly encouraged. Only provide 10 total example projects. Projects should demonstrate ability to successfully accomplish a wide range of project types, sizes and budgets. Majority of projects should be constructed; all should be designed within the last 5 years. 3 out of the 10 have to be directly attributable to the Key Designer or Engineer. Section G: Only indicate that Key personnel participated in example projects when they will be performing the exact same role on this contract. Section H: 1. Management Plan (not to exceed 3 single-sided pages) to include the team's overall Management Philosophy and Intent including project assignment, communication, roles and responsibilities, etc. 2. Quality Control Plan (not to exceed 5 single-sided pages) - providing services within the negotiated fee in compliance with the Brooks Act (see attachment PBS Procurement Instructional Bulletin PIB 13-04), meeting design schedule, designing a project within budget, plan for managing and scheduling the Government’s unpredictable issuance of task orders in terms of number, size and urgency, plan for efficiently covering the entire NSCOD area including locations where work will be accomplished. Plans should be tailored directly to this procurement. 3. Past Performance Documentation (for each sample project submitted in section F): Provide copies of any performance evaluations or owner review of firms performance, provide an accessible owner point of contact including name, title, address and current phone number, provide copies (or listing) of awards, provide copies of letters of appreciation/commendations 4. Teams Design Philosophy and Design Intent (not to exceed 2 single-sided pages) All responsive offers will be considered. This is not a request for proposal. The government intends to award multiple contracts from this notice but reserves the right to vary that number based on number and quality of submissions. The prime contractor must be registered in the System for Award Management (www.sam.gov). STEP II – Please note, these documents are not required at this time; they will be requested at a later date, if necessary. After the interviews are complete, firms on the short-list will be required to submit the following documents: ? Labor rates for all pertinent categories/job titles (base rates only, not loaded) for the firm and all subcontractors (to be submitted on a GSA Form 2630). ? Current report from payroll accounting system to include: explanation of pay period and a list to include employee name, corresponding labor category and salary or hourly rate for those employees that will be working on the Contract (base rates only, not loaded). ? Overhead rates (to be submitted on a GSA Form 2630). ? Financial reports that outline the direct and indirect expenses of the firm. The report should allow GSA to determine what expenses are classified as direct or indirect and used in the computation of the overhead rate. The report shall cover the firm’s last completed fiscal year and shall illustrate how you have computed your overhead rate.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:47PF0018R0061
  1. Combined Synopsis
  1. 5×
    Combined SynopsisCurrentApr 9, 2018

    Northern Service Center Operations Division (NSCOD) Indefinite Delivery Indefinite Quantity (IDIQ) Contracts for Architectural and Engineering Services (A/E)

    Notice af69b1bc8b4ee6bcf5ff4e111d102beb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a Sources Sought Notice only. This notice does not constitute a Request for Qualifications (RFQ), Request for Proposals (RFP), or Invitation for Bids (IFB), nor does it represent a commitment by the Government to issue a solicitation or award a contract. This Sources Sought Synopsis is issued solely for market research and planning purposes to determine the availability and adequacy of potential sources. It is not a Request for Proposals or Quotes and imposes no obligation on the Government to acquire any goods or services. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government reserves the right to determine the appropriate acquisition approach based on the results of this market research. Responders should not anticipate feedback regarding their submissions. The Government will not pay for any costs incurred in responding to this Synopsis; all costs associated with responding are solely at the responding party's expense. The information provided herein is subject to change and is non-binding on the Government. The purpose of this notice is to conduct market research to identify potential and qualified sources, assess industry capabilities, and establish effective acquisition strategies, including potential small business set-aside opportunities. No reimbursement will be provided for any costs associated with submitting information in response to this announcement or any follow-up information requests. Overview The General Services Administration (GSA), Public Buildings Service (PBS), is conducting market research to establish Multiple-Award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts for comprehensive, multidisciplinary Architect-Engineer (A/E) services. These contracts are intended to provide integrated, sustainable, and adaptive design solutions across federally owned and leased real property nationwide. The Government anticipates awarding multiple contracts with multi-year ordering periods (5 year base with one 5 year option) to support GSA zones and client agencies across the United States and its territories. Expected typical project size is to be above the simplified acquisition threshold of $350,000. The potential place of performance for services rendered under this contract is on an as-needed basis for federal projects anywhere in the United States and its territories. This will require the capability to travel to GSA and other Government agency office locations nationwide. In some instances, performance of services is expected to require the capability for contractors to dispatch personnel to multiple locations simultaneously. The applicable North American Industry Classification System (NAICS) code for this requirement is 541310 (Architectural Services) & 541330 (Engineering Services), which has a small business size standard of $12.5 million and $25.5 million respectively. Scope of Services Services provided under the resulting IDIQ contracts will encompass a comprehensive range of professional A/E design and engineering disciplines. Scopes of work for individual task orders may include, but are not limited to, the following: 1. Core Project Life Cycle Services - These services cover the entire project lifecycle, from initial concept to post-construction closeout. Planning and Pre-Design Feasibility, pre-design, and project development studies Master planning Cost Estimating Real Estate Market Analysis Assessment and Investigation Existing conditions surveys, and field investigation Building condition survey evaluation reports (exterior and interior) Environmental investigation, reviews, inventories, and audits Energy audits and studies Design and Documentation Concept design, Design development, and Construction document development (both architectural and engineering) Interior design, including Furniture, Fixtures, and Equipment (FFE) Building standard documents Construction Support and Closeout Constructability review and evaluation Submittal and shop drawing review Management and inspection (M&I) services during construction and Construction inspection Building and system commissioning Post Construction Contract Services (PCCS); Record and close-out documents 2. Specialized Technical & System Design - Work requested often involves the assessment, repair, and upgrade of existing complex building systems. Mechanical, Electrical, and Plumbing (MEP) Full MEP services, including design of HVAC systems and electrical systems and lighting Assessment and design for mechanical components (e.g., pumps, fans, air handlers, water distribution systems) and air distribution Design of water and waste water systems, including performance of sanitary inspections Temperature control assessment and design and BAS system assessment and integration Building Structure and Envelope Structural evaluation and design Façade evaluation and remediation design Water infiltration investigation and mitigation design Safety, Security, and Compliance Fire and Life Safety evaluation and design Rehabs to improve energy efficiency and safety concerns Seismic & Blast protection and Vertical Transportation Code Compliance 3. Required AE Disciplines and Expertise - AE firms will need staff with licensed and/or specialized expertise in the following disciplines: Core Architectural and Engineering Disciplines Architecture and Interior Architecture Mechanical Engineering, Electrical Engineering, Structural & Civil Engineering, and Plumbing Historic Preservation Specialized Expertise A Qualified/Licensed Fire Protection Engineer (NCEES)* Security Space Planning & Workplace Cost Estimating and Scheduling Environmental Services Modernization and Quality Control Building Information Modeling (BIM) Quality control review and Report writing Submission Requirements Interested firms are invited to submit a written Capability Statement. Submissions must not exceed five (5) pages in length and must address the following elements: A. Company Profile Official company name, street address, telephone number, and primary website URL. Unique Entity Identifier (UEI) and Commercial and Government Entity (CAGE) Code. Office location(s) and primary design production facilities. Business size status under NAICS 541310 or 541330 (Large Business or Small Business). Applicable SBA socio-economic certifications (e.g., 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business [SDVOSB], Woman-Owned Small Business [WOSB], or Economically Disadvantaged WOSB [EDWOSB]). B. Relevant Experience Summarize three to five (3–5) relevant projects completed within the past ten (10) years. Demonstrate experience in projects of similar scale, scope, and complexity, such as federal workplace design, major repairs and alterations, or complex building systems. Include project title, customer/agency point of contact, contract value, role (Prime or Subcontractor), and a brief narrative of the work performed. C. Nationwide Capacity Demonstrate organizational capacity to manage and execute multiple task orders simultaneously across diverse geographic locations nationwide. Describe key disciplines maintained in-house versus those typically fulfilled through subcontractor or joint venture arrangements. Submission Instructions Responses must be submitted electronically via email to the primary procurement contacts listed below: Submission Deadline: Primary Contact: Point of Contact Email: Subject Line Format: Sources Sought Response - National A/E IDIQ - [Firm Name] Hard copies, telephonic inquiries, and late submissions will not be reviewed or acknowledged. All information provided in response to this notice will be used strictly for market research and acquisition planning purposes. This notice encourages participation from qualified small business concerns, including socio-economic program participants, to assist GSA in evaluating the feasibility of small business set-asides for this procurement. All prospective offerors are responsible for monitoring SAM.gov for updates, future notices, or potential solicitations related to this requirement.
-Market Research11/13/2026
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis11/16/2026
The purpose of this Update is to amended documents to answer questions and update the Performance work statment, solicitation, Total Evaluated Price (TEP) Workbook and Quality assurance plan. As such, The final proposal due date is being updated to Oct 23, 2026 at 1:00PM Central Standard Time. Please review all documents for possible changes. Questions shall be submitted electronically via email with subject line FOUO\\INFO: Solicitation 86614126R00002 Technical Question to CO Travis Sutton at Travis.L.Sutton@hud.gov, CS Christopher Rodriguez Christopher.J.Rodriguez@hud.gov on or before September 29, 2026, at 1:00PM Central Standard Time. Responses to technical questions will be posted as an amendment to this notice. ​​​​​1. Description of Services: The U.S. Department of Housing and Urban Development (HUD) Office of Multifamily Housing requires contractor support to conduct onsite inspections of new construction and substantial rehabilitation of multifamily housing projects and performing various inspection tasks. These services will provide HUD with the field/site data necessary to make informed decisions regarding the construction/rehabilitation phase of HUD multifamily mortgage insurance underwriting and capital advance programs. 2. Acquisition Strategy: The Government is issuing this Request for Proposal (RFP) 86614126R00002 on SAM.gov with the intent to award a Firm-Fixed-Price (FFP)/Indefinite Delivery Indefinite Quantity (IDIQ) contract, in accordance with Revolutionary FAR Overhaul (RFO) 12/15/ as a small business set aside. This is a notice that this order is a total set-aside for small business concerns. Only proposals submitted by small business concerns will be accepted by the Government. Any quote that is submitted by a contractor that is not a small business concern will not be considered for award. 3. Services: The Contractor shall provide services in accordance with the attached Performance Work Statement (PWS), Contract Line-Item Numbers (CLINs), terms and conditions. 4. NAICS Code: 541310 5. Product Service Code (PSC): C219 6. Period of Performance: This contract will consist of one (1) Base Period: 02/01/2027 – 01/31/2032. 7. Contract type: Firm-Fixed-Price (FFP)/Multiple-Award Indefinite Delivery Indefinite Quantity (IDIQ). The government anticipates awarding up to three FFP Multiple-Award IDIQ contract(s) for each of the five (5) regions but reserves the right to combine regions into one contract award if one contractor receives an award for more than one region or expand or reduce the size of a geographic region under an awarded contract. Submitting a proposal for all regions is not required. The government will reject any regional proposal that proposes to only partially perform in the entire region. The resulting contracts will establish the terms, conditions, unit prices, ordering procedures, and maximum ordering limitations applicable to future orders for the required services. The contracts are not intended to constitute a FAR Part 17 multi-year contract or a commitment by the Government to acquire the estimated requirements for each fiscal year of the ordering period. The ordering period may extend across multiple fiscal years. The existence of an ordering period that spans multiple fiscal years does not constitute a Government commitment to acquire services in each fiscal year. Except for the Guaranteed Minimum stated in the contract, the Government does not guarantee that any particular quantity, dollar value, or level of services will be ordered during any fiscal year or during the ordering period. Individual orders will be issued only when the Government has a bona fide requirement and appropriate funding is available. Each order will be separately funded in accordance with applicable fiscal law and the terms of the resulting contract. ORDERING PERIOD The ordering period is established solely to provide the Government with a vehicle for placing orders when requirements arise. The Government does not obligate itself at IDIQ award to purchase the Best Estimated Quantities (BEQs), historical demand quantities, or any other estimated future requirements identified in this Solicitation. The Government may issue no orders or may issue orders in quantities or at times different from the estimates contained in this Solicitation, subject only to the Government's contractual obligations, including the Guaranteed Minimum. The expiration of the ordering period does not constitute a cancellation of a multiyear commitment because the Government is not making a multiyear procurement commitment under this contract. ORDERING Orders shall be issued only by authorized Government personnel in accordance with the Ordering Procedures clause. An order transmitted electronically by an authorized Contracting Officer, including by email when expressly authorized by the Ordering Procedures clause, shall constitute the Government's issuance of the task order. IDIQ Contract Minimum and Maximum Master IDIQ: · Guaranteed minimum: $133,000 · IDIQ maximum ceiling: $37,000,000 For each awarded IDIQ contract: · Guaranteed Minimum Per Region: Northeast Region: $23,000 Southeast Region: $25,000 Southwest Region: $45,000 West Region: $30,000 Midwest Region: $10,000 · Maximum IDIQ Ceiling Per Region: Northeast Region: $6,409,000 Southeast Region: $8,094,000 Southwest Region: $11,818,000 West Region: $8,286,000 Midwest Region: $2,354,000 The guaranteed minimum is the Government's minimum contractual obligation under the IDIQ contract. The maximum IDIQ ceiling is the maximum aggregate quantity/value that may be ordered under the contract, unless otherwise expressly authorized by the contract. Task-Order Limitations The minimum and maximum order limitations stated in FAR 52.216-19, as completed in this solicitation, apply to individual task orders and are separate from the guaranteed minimum and maximum ceiling of the IDIQ contract. 8. Place of performance: LOCATION OF REGIONS AND FEDERAL HOUSING ADMINISTRATION ZONES The contractor must perform the services (i.e., projects) in the following MF Housing (MFH) Region: *** To Be Determined (TBD) at Time of Award *** Northeast Region (by FHA zone): Washington D.C (000) and 13 States: Connecticut (017), Delaware (032), Maine (022), Massachusetts (023), Maryland (052), New Hampshire (024), New Jersey - North (031) and South (035), New York - Buffalo (014) and New York City (012), Pennsylvania - East (034) and West (033), Rhode Island (016), Vermont (026), Virginia (051), and West Virginia (045). Southeast Region (by FHA zone): Puerto Rico/US Virgin Islands (056) and 8 States: Alabama (062), Florida - North (063), Central (067), and South (066), Georgia (061), Kentucky (083), Mississippi (065), North Carolina (053), South Carolina (054), and Tennessee - Knoxville (087), Memphis (081), Nashville (086). Midwest Region (by FHA zone): 6 States: Illinois - Chicago (071) and Springfield (072), Indiana (073), Michigan - Detroit (044), Grand Rapids (047), and Flint (048), Minnesota (092), Ohio - Cleveland (042), Columbus (043) and Cincinnati (046), and Wisconsin (075). Southwest Region (by FHA zone): 9 States: Arkansas (082), Iowa (074), Kansas (102), Louisiana (064), Missouri - East (085) and West (084), Nebraska (103), New Mexico (116), Oklahoma - East (118) and West (117), and Texas - Fort Worth (113), Houston (114), and San Antonio (115). West Region (by FHA zone): 14 States: Alaska (176), Arizona (123), California - Los Angeles (122), Riverside (143), San Diego (129), San Francisco (121) and Northern California (136), Colorado (101), Hawaii (140), Idaho (124), Montana (093), Nevada (125), North Dakota (094), Oregon (126), South Dakota (091), Utah (105), Washington - Spokane (171) and Seattle (127), and Wyoming (109). 9. On-ramp/off-ramp provisions a. ON-RAMP PROCEDURES The Government may conduct an on-ramp during the ordering period when the Contracting Officer determines that additional contract holders are necessary or advantageous to meet Government requirements, increase competition, increase the availability of qualified small businesses, or otherwise support the Government's mission. Any on-ramp competition will be conducted pursuant to a new solicitation or other lawful competitive procedure and will use evaluation criteria and material contract terms consistent with the requirements established for the existing contract vehicle, to the maximum extent permitted by applicable law and regulation. An on-ramp award will not extend the ordering period of the existing contract. The Government does not guarantee that an on-ramp will be conducted or that any additional contract will be awarded. b. OFF-RAMP PROCEDURES The Government may remove a Contractor from the active ordering pool or decline to continue the Contractor's participation in a subsequent ordering period when authorized by the contract and applicable law. Potential grounds for off-ramping may include, but are not limited to: Failure to submit a proposal in response to multiple task-order solicitations when the Contractor was eligible and required to participate; Failure to receive an order during a specified evaluation period, when the solicitation or contract expressly establishes such criterion; Failure to satisfy material contract performance requirements; Repeated failure to satisfy required deliverables or quality standards; Failure to maintain required eligibility or representations; and Other objective criteria expressly identified in the contract. In evaluating whether off-ramping is appropriate, the Government will give priority consideration to relevant past performance on earlier orders under the contract, consistent with applicable law and the evaluation methodology stated in the contract. Off-ramping will not be based solely on a Contractor's failure to receive an order unless the solicitation expressly identifies such failure as an off-ramp criterion and the criterion is applied consistently. c. TEAMING ARRANGEMENTS After award, a Contractor may not add, remove, or substitute team members in a manner that materially changes the basis on which the Government evaluated the Contractor's proposal unless such change is permitted by the contract and applicable law and is approved by the Contracting Officer. Nothing in this provision authorizes a Contractor to modify its post-award teaming arrangement in a manner that circumvents the competition requirements applicable to the contract. 10. Questions: Questions shall be submitted electronically via email with subject line FOUO\\INFO: Solicitation 86614126R00002 Technical Question to CO Travis Sutton at Travis.L.Sutton@hud.gov, CS Christopher Rodriguez Christopher.J.Rodriguez@hud.gov on or before September 29, 2026, at 1:00PM Central Standard Time. Responses to technical questions will be posted as an amendment to this notice. 11. Proposal Submission: Proposals shall be submitted electronically via email with subject line FOUO\\INFO: Solicitation 86614126R00002 – (Insert Company Name and Region). to CO Travis Sutton at Travis.L.Sutton@hud.gov, Christopher Rodriguez at Christopher.J.Rodriguez@hud.gov on or before the closing date of October 23, 2026, at 1:00PM Central Standard Time. Email Submission Size Limitation: Email messages and attachments submitted to HUD shall comply with HUD's maximum email message/file size limitation of 28 megabytes (MBs). If a proposal submission exceeds this limitation, the Offeror shall use additional emails. Offerors are responsible for ensuring timely receipt of their complete proposal in accordance with the submission instructions. Alternate proposals: The solicitation does not authorize offerors to propose alternative terms and conditions or line items. Such alternate proposals will be considered non-compliant / non-conforming, technically unacceptable, and ineligible for award. Alternate proposals will not be evaluated. Alternate proposals will be eliminated and not further evaluated. 12. HUD Contacts: Contracting Officer: Travis Sutton Travis.L.Sutton@hud.gov Contract Specialist: Christopher Rodriguez at Christopher.J.Rodriguez@hud.gov
-Solicitation10/23/2026
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis10/30/2026
Description The purpose of this announcement is to request new Architect / Engineer (A/E) qualification information for the General Services Administration / Public Buildings Service (GSA/PBS) A/E short selection for Continental United States (CONUS) and Outside Continental United States (OCONUS). WHAT IS THE SHORT SELECTION PROCESS? The short selection process utilizes the procedures set forth in Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) Subsection 36.202-4 for Architect/Engineer (A/E) projects with an estimated total fee less than the simplified acquisition threshold (currently $350,000; see RFO FAR Part 2.101). The A/E's professional qualifications, the firm's geographic proximity, knowledge of the local area as identified on the A/E's SF330, and supplemental information will be used for the first preliminary screening of firms. For each proposed project, GSA will conduct discussions with at least three (3) firms to consider anticipated concepts and compare alternative methods for furnishing services. Additional information may be requested during discussions if necessary to facilitate the final ranking of firms (i.e.: past performance references, specialized experience, capacity, schedule, etc.). Upon conclusion of discussions, the top three firms will be ranked, and a price proposal will be requested from the highest ranked firm. If a fair and reasonable price cannot be negotiated with the highest ranked firm, a request for a price proposal will be sent to the second ranked firm, and so on until an award can be made at a fair and reasonable price. All acquisitions utilizing the GSA A/E short selection list (database) shall be set-aside for small business concerns unless requirements cannot be met by a small business and the Contracting Officer (CO) obtains a proper waiver. WHAT IS THE SHORT SELECTION PROCESS USED FOR? GSA will use the short selection list to award A/E contracts, valued at less than the simplified acquisition threshold (currently $350,000) in CONUS/OCONUS (NOT Estimated Cost of Construction at Award (ECCA). The firm must have NAICS code 541310 - Architectural Services, with a small business size standard of $12.5 million and/or 541330 - Engineering Services, with a small business size standard of $25.5 million. The firm must clearly notate which states/territories they have active production offices and which states they are licensed by November 1, 2026. Most work will be executed for repair and alteration projects within existing Federal Buildings and U.S. Courthouses. The estimated cost of construction at award (ECCA) for a majority of the project requirements could range from, but are not limited to, above micro-purchase threshold for construction (currently $2,000) to annual prospectus threshold (currently $3.961M) or higher. Fees for design services cannot exceed 6% of the ECCA. For more information about the 6% fee limitation, see FAR 15.404-9(c)(4)(ii) (GSA Class Deviation RFO-2025-15) and 41 U.S.C. 3905(b)(3). GSA manages a nationwide real estate portfolio of approximately 360 million rentable square feet, including preserving more than 500 historic properties nationwide. A broad range of services potentially requested under this short list may include, but are not limited to the following: 1. Core Project Life Cycle Services - These services cover the entire project lifecycle, from initial concept to post-construction closeout. Planning and Pre-Design Feasibility, pre-design, and project development studies Master planning Cost estimating Real estate market analysis Assessment and Investigation Existing conditions surveys, and field investigation Building condition survey evaluation reports (exterior and interior) Environmental investigation, reviews, inventories, and audits Energy audits and studies Design and Documentation Concept design, design development, and construction document development (both architectural and engineering) Interior design, including furniture, fixtures, and equipment (FFE) Building standard documents Construction Support and Closeout Constructability review and evaluation Submittal and shop drawing review Management and inspection (M&I) services during construction and construction inspection Building and system commissioning Post construction contract Services (PCCS); Record and close-out documents 2. Specialized Technical & System Design - Work requested often involves the assessment, repair, and upgrade of existing complex building systems. Mechanical, Electrical, and Plumbing (MEP) Full MEP services, including design of HVAC systems, electrical systems, and lighting Assessment and design for mechanical components (e.g., pumps, fans, air handlers, water distribution systems) and air distribution Design of water and waste water systems, including performance of sanitary inspections Temperature control assessment and design and BAS system assessment and integration Building Structure and Envelope Structural evaluation and design Façade evaluation and remediation design Water infiltration investigation and mitigation design safety, security, and compliance Fire and life safety evaluation and design Rehabs to improve energy efficiency and safety concerns Seismic & blast protection and vertical transportation Code compliance 3. A/E Disciplines and Expertise - A/E firms will need staff with licensed and/or specialized expertise. The following are typical disciplines and categories utilized for GSA projects. Firms do not need to have all of them, but should include the most relevant disciplines for their firm: Core Architectural and Engineering Disciplines Architecture and anterior architecture Mechanical engineering, electrical engineering, structural & civil engineering, and plumbing Historic architecture/preservation Specialized Expertise A qualified/licensed fire protection engineer (NCEES)* Security Space planning & workplace Cost estimating and scheduling Environmental services Building automation Scifs Modernization and Quality Control Building information modeling (BIM) Quality control review and report writing SUBMISSION INSTRUCTIONS To be considered for future Architect-Engineer (A/E) projects, your firm must submit a package demonstrating the applicability and comparability of its portfolio to the types of services outlined above. Please submit your complete package as a single PDF document. This file, which should be no larger than 30MB and no more than thirty (30) pages, must contain all submittal documents. Submit your PDF file as an attachment via the online “GSA A/E Short Selection Submission Form” (Link provided below). Note: Hardcopy submissions received by mail will not be filed or considered. The following information shall be submitted as part of the thirty (30) page limit (LISTED IN REQUIRED ORDER): DO NOT SUBMIT ANY PROPRIETARY INFORMATION 1. A cover letter. The letter should outline the work your firm specializes in and include a brief description of your firm's capabilities specifically related to the project examples stated above. 2. SAM Entity Registration Print Out - 1st and 2nd page only to show active registration in System for Award Management (SAM). Registration is required for award of federal contracts and you must have an active registration in SAM to be considered for project work. Contractors may register in SAM free of charge at https://sam.gov/ under the header labeled Register Your Entity or Get a Unique Entity ID. 3. Standard Form (SF) 330 - Architect-Engineer Qualifications. DO NOT include subconsultants. Please include photos of accomplished work. 4. A separate list of the licensed (or will be licensed by November 1, 2026) professionals and the State/territories of their licensing. Note: This A/E short selection process is for Primes only; consultants are NOT part of this selection process. However, submitted project experience may reference work executed with consultants. Firms should highlight their specific role and explain the work they performed alongside any consultants. Consultants will be requested by project managers during project development. Submittals that don't contain the required documentation will be returned for revision and/or non selection. Organizing your submittal package in the same order enumerated above will facilitate a more efficient review process. Questions related to this announcement shall be referred to aeshortselection@gsa.gov The following information should be easily found in your SF330 Submission: 1. Relevant Project Experience, Demonstrated Comparability and Creative Problem Solving Offerors must provide a minimum of three (3) but no more than five (5) comparable project examples that demonstrate a wide range of repair and alterations work similar in budgets and complexities to those anticipated for contracts. An additional maximum of ten (10) relevant projects completed in the last ten (10) years can be submitted in list form. Please include relevant project photographs. A comparable project is defined as an “A/E engagement involving the repair, alteration, or renovation of existing, occupied facilities, with a focus on both architectural and engineering solutions. Specifically, the project should demonstrate specialized experience in: Building system upgrades (e.g., MEP services or mechanical pump replacement) Historic preservation (especially classical building architecture) Workplace design Furthermore, a comparable project's Estimated Cost of Construction at Award (ECCA) should generally range from $50,000 to an annual prospectus threshold (currently $3.961M). Breadth of Scope: Teams must demonstrate proficiency in seamlessly incorporating architecture and engineering to solve both complex and routine design issues within existing buildings. Specialized Expertise: Highlight specialized experience in the areas most critical to the GSA/PBS mission. This must include work in: Occupied buildings Historic preservation, restoration, and adaptive reuse (special consideration will be given to firms demonstrating experience with classical building architecture and design) Building system upgrades (e.g., MEP services, mechanical pump replacement, HVAC systems, electrical systems, and building controls). Workplace design strategies, interior office redesign, and building standard documents Creative Problem Solving: Firms must demonstrate their ability to be creative and "think outside the box" when developing design solutions, especially given the constraints and challenges of government buildings and existing customer agencies while successfully navigating constraints such as schedule and budget. 2. Team Capacity, Management, and Quality Control The team’s ability to manage projects efficiently, flexibly, and collaboratively is essential for handling the unpredictable nature of GSA task orders. Contract Management and Flexibility: Demonstrate the ability to staff and manage contracts on an as-needed basis, accounting for the unpredictable issuance of work in terms of number, size, importance, and urgency. Consultant and Customer Agency Management: The A/E short selection process is for the Architecture or Engineering Prime only, but the firm must demonstrate its ability to manage its entire team. Firms must demonstrate proven success in establishing good relationships with and effectively managing future sub-consultants, as well as managing scope and communication while working with difficult customer agencies. Quality Assurance: Team must demonstrate formalized processes for quality control (QC) and a commitment to QC standards while consistently designing within the project’s budget and schedule limitations. 3. Key Personnel Education and Qualifications Key Personnel should possess the education, professional qualifications, and specific project experience that provides the best opportunity for the successful completion under this contract. Licensing: Provide a separate list of states in which the firm is licensed or will be licensed by November 1, 2026. Specialized Roles: Key Personnel must demonstrate expertise in disciplines relevant to the services outlined above, such as a Qualified Fire Protection Engineer1, historic preservation, etc. 1A Qualified Fire Protection Engineer is an individual with deep knowledge of fire physics and chemistry, meeting one of the following criteria: (a) An engineer with an undergraduate or graduate degree in fire protection/safety engineering, plus a minimum of four (4) years of relevant work experience; (b) A registered Professional Engineer (P.E. or similar) in Fire Protection Engineering; or (c) A P.E. in a related engineering discipline who is a Professional Member of the Society of Fire Protection Engineers and has passed the NCEES fire protection exam. 4. Past Performance Offerors should include CPARS (Contractor Performance Assessment Reporting System) if they have past government experience as the prime. No more than three (3) most recent relevant records. The CPARS information does not count against the thirty (30) page limit. Impact: If a firm does not have past government experience, they will not be negatively impacted during the selection process. Please register to attend the industry outreach and Q&A meeting on October 16 at 9am PDT or October 22 at 3pm EDT by completing the “A/E Short Selection Process Registration Form CONUS/OCONUS” (Link provided below). Invites will be sent out to all registered attendees approximately one week in advance. Relavant Links GSA A/E Short Selection Process for CONUS/OCONUS - Registration Form https://forms.gle/8kd1qZfZeVMag3HG9 GSA A/E Short Selection Process for CONUS/OCONUS - Q&A https://docs.google.com/document/d/1sGIs_KEnEvP99mxeB2VKBS64IVoUixEZSOLsczc_2As/edit?usp=sharing GSA A/E Short Selection Process for CONUS/OCONUS - Submission Form https://forms.gle/7Rh3FkMkubweUHveA
-Market Research10/31/2026

Additional Details

Solicitation Number

47PF0018R0061

Archive Date

Jan 1, 2022

Office Address

CHICAGO, IL, 60604