Notice ID: 73c44807b2964d328cf7c4f746ae0ff9SolicitationArchived
(Amended) Septic Drain Pump and Drain Field Installation for USDA ARS in Pullman, WA
Archived on September 18, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM PDT
- Posted
- August 26, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of AgricultureAGRICULTURAL RESEARCH SERVICE
Notice details
- Office
- USDA ARS AFM APD
- Place of performance
- Pullman, 99163
- Last updated
- Nov 9, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1232SA25Q0645
- Notice ID
- 73c44807b2964d328cf7c4f746ae0ff9
Description
NOTE: This solciiation is amended to correct the statement of work (SOW) to include the electrical work. Please see the attached SF30 and revised statment of work. Acknowledgemen of the amendment is required with quoatation on the SF1442. This is a solicitation/request for qutoes to provide all labor, materials, equipment, supplies, supervision, and transportation needed for drain pump and drain field installation for USDA ARS in Pullman, WA. All work shall be done IAW the Statement of Work (SOW) and other attachments set forth in this solicitation. IAW FAR 36.204 the estimated magnitude for this project is between $25,000 and $100,000. Completion shall be 180 days after Notice to Proceed with bonds due 10 days after award if required. Dept. of Labor General Decision #WA20250042 dated 08/08/2025 is applicable to this requirement. Please see the attachments for important information on when and how to respond along with other necssary details in the attachments.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Michael Sherlock
Documents
Files (7)
- Download
SF30_1232SA25Q06450001.pdf
85 KBAdded in Solicitation version 3Posted - Download
Attachment 1 Statement of Work (Revised).pdf
1.4 MBAdded in Solicitation version 3Posted - Download
SF1442_RFQ_1232SA25Q0645.pdf
660 KBAdded in Solicitation version 1Posted - Download
Attachment 2 Site Evaluation.pdf
429 KBAdded in Solicitation version 1Posted - Download
Attachment 3 Wage Determination WA20250042 08082025.pdf
36 KBAdded in Solicitation version 1Posted - Download
Attachment 4 ARS Form 371 Construction Progress and Payment Schedule.pdf
52 KBAdded in Solicitation version 1Posted - Download
Attachment 5 ARS Form 372 Request for Payment.pdf
30 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Septic Drain Pump and Drain Field Installation for USDA ARS in Pullman, WA
- 3Version 3SolicitationArchivedCurrent
(Amended) Septic Drain Pump and Drain Field Installation for USDA ARS in Pullman, WA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service. The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS). See attachments for full requirements. QA 11_04_2026 Uploaded 11-04-2026 Amendment A001 Posted 11-04-2026 | - | Combined Synopsis | 11/17/2026 |
**********UPDATE 11-5-2026********** AMENDMENT 001 posted today with the following five (5) updated and/or new attachments: 1. 127EAX27Q0007_0001 2. RFI Questions and Responses_127EAX27Q0007_Amendment 001 3. Attachment F1_Wage Determination_Grant County_NM20260019 5.18.2026 4. Attachment F2_Wage Determination_Catron County_NM20260010_5.18.2026 5. Attachment F3_Wage Determination_Sierra County_NM20260012_5.18.2026 **********End of Amendment 001********** Commercial Construction Requirement Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate three other CXT® style vault toilets. There is one option item that includes the demolition of one single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison” single user vault toilet. A second option is to procure a toilet and have it delivered but with no installation. | - | Solicitation | 11/17/2026 |
Amendment 0001 - The purpose of this amendment is to 1) State the correct site visit dates. November 4, 2026 and/or November 5, 2026 at 10:00 AM PT both days. (Only one (1) day is necessary). 2) Distinguish the correct solicitation number is 127EAX27Q0010. 3) Establish starting time frame. The notice to proceed is expected to be issued around May 1, 2027 with a 90 day period of performance. 4) Post correct solicitation version because the initial one posted was the wrong version. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0010 is issued as a Request for Quotation (RFQ) for TAHOE NATIONAL FOREST, Camptonville Housing Decommissioning. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238910. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. SF-1442: All Contractors must be registered in the System for Award Management (www.SAM.gov) at time of submission of a quote. Contractors are responsible for following all submission instructions and to ensure delivery of all required documents by the date and time set for receipt of quotes or any Amendment that extends the receipt date. Proposal Evaluation and Basis for Contract Award: Starts on Page 13 Quotation/Proposal Submittal Requirement: Starts on Page 13 Bid Guarantee (FAR 52.228-1): 20% required if quote is in excess of $150,000. The SF-24 shall be used for Bid Bonds - https://www.gsa.gov/reference/forms/bid-bond Price Range – Between $100,000 and $250,000 NAICS: 238910 with a Small Business Size Standard of $19 Million. This acquisition is a total Small Business set-aside. | - | Combined Synopsis | 11/27/2026 |
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots. | - | Combined Synopsis | 11/30/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
1232SA25Q0645
Archive Date
Sep 18, 2025