Notice ID: 73f119dfa77240d3b2e6f2b37e057cb1Award NoticeAwardedArchived
56--CAG Perimeter Fence Relocation
Awarded on June 8, 2026. Full description on SAM.gov.
Awarded tounder 89503126CWA000144 (source: SAM.gov award notice)• $35.6K
Overview
- Posted
- June 8, 2026
- Notice type
- Award Notice
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of Energy
Notice details
- Office
- WESTERN-DESERT SOUTHWEST REGION
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 8, 2026
- Award amount (SAM.gov award notice)
- $35.6K
Identifiers
- Solicitation number
- 89503126QWA000397
- Notice ID
- 73f119dfa77240d3b2e6f2b37e057cb1
- Award number (PIID)
- 89503126CWA000144
Description
Casa Grande 230-kV Substation Perimeter Fence Relocation, Casa Grande, AZ
Award Overview
Award Number
89503126CWA000144
Award Amount (SAM.gov award notice)
$35.6K
Award Date
Jun 8, 2026
Awardee
Awardee UEI
JCKCJKMFYTP5
Awardee CAGE Code
859K8
Awardee Address
622 S TREKELL RD, Casa Grande, AZ 85122, UNITED STATES
Original Solicitation
Notice ID: 73f119dfa77240d3b2e6f2b37e057cb1
Posted Date: Jun 8, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
Links (1)
- Click here to see more information about this opportunity on FedConnectwww.fedconnect.netPosted
Lifecycle
- 2Version 2SolicitationArchived
56--CAG Perimeter Fence Relocation
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
56--CAG Perimeter Fence Relocation
Other notices for this solicitation
- SolicitationRelated noticeMay 1, 2026
CAG Perimeter Fence Relocation
- SolicitationRelated noticeMay 12, 2026
56--CAG Perimeter Fence Relocation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The purpose of this Sources Sought is to conduct market research to identify companies capable of providing installation services of a cable rail fence system for the Department of Veterans Affairs, Network Contracting Office (NCO) 21, on behalf of VA Southern Nevada Health Care System. (1) The Government does not intend to award a contract based on this Sources Sought Notice or to otherwise pay for the information solicited. (2) Although “proposal,” “offeror,” “contractor,” and “offeror” may be used in this source sought notice, any response will be treated as information only. It shall not be used as a proposal. (3) The purpose of this sources sought is to conduct market research to support the procurement of providing installation services of a Cable Rail Fence System for the VA Southern Nevada Health Care System at 6900 N Pecos Rd, North Las Vegas, NV 89086. This notice serves to survey the market to ascertain whether or not sources are capable of providing the requested installation services of cable rail fence system. This notice allows potential contractors/vendors to submit a non-binding statement of interest and documentation demonstrating their capability. The sources sought effort is intended to assess industry capabilities and develop/support the intended direction of acquisition planning. The Network Contracting Office (NCO 21) is requesting responses from qualified business concerns: the qualifying NAICS code for this effort is 238990 All Other Specialty Trade Contractors and Size Standard of $19M. 4) This source sought notice to gain knowledge of potential qualified sources and their size classifications (Service Disabled/Veteran Owned Small Business (SDVOSB/VOSB), Hub zone, 8(a), small, small disadvantaged, woman-owned small business, or large business) relative to NAICS 238990. Responses to this notice will be used by the Government to make appropriate acquisition decisions. After a review of the responses to this notice, a solicitation announcement may be published. Responses to this notice are not considered adequate responses to any corresponding solicitation announcement. All interested offerors will have to respond to the solicitation announcement in addition to responding to this notice. (5) Any information received from a contractor in response to this Sources Sought Notice may be used in creating a solicitation. Any information received that is marked with a statement, such as “proprietary” or “confidential,” intended to restrict distribution will not be distributed outside of the Government, except as required by law. Scope of Statement of Work (SOW) 1. GENERAL 1.1 Title: Installation of Government-Furnished Cable Rail Fence, Approximately 250 Linear Feet 1.2 Background: The Department of Veterans Affairs (VA) requires installation of a cable rail fence system at North Las Vegas Medical Center. All fence materials (posts, cable, hardware, fittings) have been procured and are on-site/in VA storage. This SOW covers labor, equipment, and incidental materials required to install the Government-furnished fence system only. 1.3 Location: The area is in front of building 5 along the parking lot sidewalk. A site walk is recommended prior to quote/proposal submission. 1.4 Period of Performance: Estimated duration: 15 work days. 1.5 Work Hours: Normal VA business hours are [0700–1630], Monday–Friday, excluding federal holidays, unless otherwise coordinated with the VA COR/Facility Engineer. Work in active patient care, parking, or pedestrian areas may require after-hours scheduling — to be confirmed at the site visit. 2. SCOPE OF WORK The Contractor shall furnish all labor, tools, equipment, consumables, and supervision necessary to install approximately 250 linear feet of cable rail fencing, Government-furnished, including: Site layout and staking of fence line per VA-approved drawing/marked layout. Excavation and setting of fence posts (line posts, corner posts, end posts, gate posts if applicable) to manufacturer specification and depth. Setting posts in concrete footings per manufacturer's installation instructions (concrete to be furnished by Contractor unless otherwise noted — confirm in RFQ). Installation of horizontal cable rail infill, including tensioning hardware, turnbuckles, and fittings per manufacturer specifications. Final tensioning, alignment, and plumb/level check of all posts and rails. Site cleanup, removal of excavation spoils, and disposal of packaging/debris (GFM packaging return to VA if required). Restoration of disturbed turf/landscaping/pavement to pre-existing condition or better. Out of Scope: Procurement of fence material, design/engineering of fence layout. electrical/grounding work. 3. GOVERNMENT-FURNISHED MATERIAL (GFM) Item Furnished By Notes Cable rail posts (line, corner, end) VA On-site / in storage on site Cable rail, fittings, turnbuckles, hardware VA Quantity to match 250 LF run Concrete for footings Contractor Unless otherwise specified Fasteners/consumables beyond kit contents Contractor Contractor is responsible for proper handling, staging, and security of GFM once received, and shall report any shortage, damage, or non-conforming material to the COR immediately upon receipt/inspection. Contractor shall return unused GFM to the VA POC upon completion. 4. APPLICABLE CODES, STANDARDS & VA REQUIREMENTS Note: Verify current edition/revision of all codes and standards against the official source prior to execution, as these are subject to periodic update. Manufacturer's published installation instructions for the specific cable rail system (governs post spacing, embedment depth, cable tension specs). OSHA 29 CFR 1926 – Excavation (Subpart P) if post holes exceed 5 ft depth or trenching is involved; general construction safety. ADA/ABA Accessibility Guidelines – if fence is adjacent to an accessible route, confirm no encroachment on required clear width. Local building code / VA Master Specification Section for site fencing, if a controlling spec exists at this facility (check with VA Facility Engineer/COR). VA Directive/Handbook requirements for construction/renovation activities on VA property, including ICRA and ILSM screening (below). 5. SAFETY & RISK CONSIDERATIONS (Flagged Items) Underground Utility Locate (Dig Permit): Mandatory call to 811/One-Call and completion of a VA Excavation/Dig Permit prior to any post hole excavation, regardless of depth. Contractor shall not break ground until utility clearance and VA permit are obtained. Excavation Safety: If any post holes exceed 5 feet in depth or trenching is required for cable runs, OSHA Subpart P (protective systems, competent person designation) applies. ICRA (Infection Control Risk Assessment): Required if work occurs near or has potential dust/vibration impact on patient care areas. Coordinate with VA Infection Control prior to mobilization. ILSM (Interim Life Safety Measures): Required if the work affects a means of egress, fire lane, or life safety system access — confirm fence location does not obstruct emergency egress routes or fire department access. PPE: Standard PPE (hard hat, safety glasses, gloves, high-visibility vest) required; steel-toe footwear if heavy posts/equipment are being handled. Cable Tensioning Hazard: Cable rail tensioning under load presents a whip/recoil hazard — Contractor shall follow manufacturer tensioning procedure and keep personnel clear of load path during final tensioning. Traffic/Pedestrian Control: If work is near parking areas, roadways, or pedestrian paths, Contractor shall provide barricades, cones, and signage per MUTCD as applicable. Concrete Work: Standard PPE for concrete handling (eye/skin protection); confirm disposal method for excess concrete/spoils. 6. SUBMITTALS Prior to start of work, Contractor shall submit for VA COR approval: Certificate of Insurance Site-specific safety plan / Job Hazard Analysis (JHA) Schedule of work / proposed sequencing Manufacturer's installation instructions for the cable rail product (for VA record) 7. QUALITY ASSURANCE / ACCEPTANCE CRITERIA All posts plumb within manufacturer tolerance (typically ±1/4" over post height — verify against spec). Cable rails tensioned to manufacturer specification, no visible sag. Post spacing consistent with layout drawing and manufacturer maximum span. Concrete footings cured per manufacturer minimum time before load/tensioning. Site restored to pre-work condition (turf, pavement patch, debris removal). Final walkthrough and sign-off with VA COR/Facility Engineer required for acceptance. 8. DELIVERABLES Fully installed, tensioned, and inspected cable rail fence, 250 LF (approx.), per manufacturer spec and VA-approved layout. Site restoration complete. Closeout documentation: as-built notes (if layout deviated from plan), warranty information (labor), and return of unused GFM/packaging. PLEASE INDICATE WHETHER YOU HOLD A GSA FEDERAL SUPPLY SCHEDULE CONTRACT THAT COVERS THESE SERVICES AND, IF SO, THE CONTRACT NUMBER. PROVIDE BUSINESS SIZE AND SOCIO-ECONOMIC STATUS. ALSO, PLEASE BE SURE TO INDICATE PLACE OF MANUFACTURE IN YOUR RESPONSE. (a) Company name, Address, Point of Contact (POC) name, email address, and phone number (b) Indicate whether your business is large or small. (c) Indicate if your firm is a certified Service-Disabled Veteran Owned Small Business (SDVOSB) or Veteran Owned Small Business (VOSB). (d) Include the Unique Entity Identifier (UEI) number of your firm. (e) State whether your firm is registered with the System for Award Management (SAM) at http://www.sam.gov and/or the VetCert Registry at Veteran Small Business Certification (sba.gov). If not, please NOTE that any future solicitation could only be awarded to a contractor who is registered in SAM, and to receive the award based on VOSB or SDVOSB status you must be registered in the VetCert Registry. (f) Provide current commercial pricing for all items listed in the attached salient characteristics and any applicable discounts. (g) Link to the respondent’s General Services Administration (GSA) schedule, or attached file of same, if applicable. (h) Capabilities Statement (i) Place of manufacturing (this includes leased equipment of where they are manufactured) (j) Authorized Distributorship letter issued from the manufacturer (if applicable) (k) Citation of any current or past customers (i.e., within the past two (2) years) to include contract number, point of contact telephone number, or e-mail address; and The response is due no later than 3:00 PM Pacific Standard Time on November 04, 2026 2026. Please submit e-mail responses to Victoria Torres, Contract Specialist, at victoria.torres@va.gov. Please place “Sources Sought Installation Services of a Cable Rail Fence System” in the subject line of the email. Your response should include a Company POC, CAPABILITIES STATEMENT, GSA SCHEDULE INFORMATION, UEI#, BUSINESS SIZE, AND SOCIO-ECONOMIC STATUS information as explained above. This notice is to assist the VA in determining sources only. NOTES: Issuance of this notice does not constitute any obligation whatsoever on the part of the Government to procure these services, or to issue a solicitation, nor to notify respondents of the results of this notice. No solicitation documents exist at this time; however, in the event, that the acquisition strategy demonstrates that GSA is a viable option for procuring a solution, the RFQ shall be posted to GSA eBuy where only those firms who currently hold a GSA Schedule with the applicable SIN will be able to respond. The Department of Veterans Affairs is neither seeking quotes nor accepting unsolicited quotes, and responses to this notice cannot be accepted as offers. Any information the vendor considers proprietary should be marked as such. The U.S. Government will not pay for any information or administrative costs incurred in response to this Sources Sought Notice. | 68% | Market Research | 11/04/2026 |
PROJECT: Lowline Area Burned Fence Construction Project -GMUG NF in Gunnison County, Colorado *******READ EACH OF THE DOCUMENTS THAT ARE LOCATED IN THE ATTACHMENTS/LINKS SECTION****************** POC'S: JANICE KING, CONTRACT SPECIALIST, at janice.king@usda.gov and LUCAS DAHLMAN, CONGTRACTING OFFICER, at lucas.dahlman@usda.gov Questions shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than November 16, 2026, at 9:00 a.m. Mountain Time. Quotes shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than December 3, 2026, at 9:00 a.m. Mountain Time. DESCRIPTION: The project will consist of constructing approximately 16,414 feet of four wire fence in the vicinity of the 2023 Low Line Fire, Gunnison County, Colorado. The purpose and need are to replace existing fences damaged by the 2023 Low Line Fire with a friendly wildlife fence and provide removal of old and damaged fence materials. See the SOW, SOI, SPECS and Diagram for more details. There is a Site Visit scheduled for this project for November 9, 2026, at 10:00 a.m.Mountain Time. Additional details regarding the Site Visit are located in this solicitation. | 68% | Combined Synopsis | 12/03/2027 |
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process. | 68% | Solicitation | 11/11/2026 |
The work to be completed consists of buying any and all material as well as the transportation of all material to the job site. It will also consist of the removal and haul out of old fence material. Contractor will be constructing 5 miles of 4 strand barb wire fence, along the same general line of the old fence. Use of chainsaw will be allowed to brush out fenceline as needed. This project will be solicited in accordance with FAR 12.201-1(c)(2). The Government will issue a request for quotes directly from local fencing contractors and will not issue a solicitation on SAM.gov. If your company is interested in future fencing projects in Gila NF, then ensure that you have an active SAM.gov account and provide your company name and Unique Entity Identifier (UEI Number) to Traci.jackson@usda.gov. | 66% | Pre-Solicitation | 11/19/2026 |
This announcement is to all Small Business, 8(a) Small Business, HUBZone Small Business, Indian Small Business Economic Enterprises, Service-Disabled Veteran-Owned Small Business and Women-Owned Small Business concerns that may be interested in performing a contract for the California Great Basin Region of the Bureau of Reclamation. The work to be performed is described below. Based upon response to this announcement, the Government may determine to set this acquisition aside or proceed with an unrestricted solicitation. The applicable North American Industry Classification System (NAICS) Code is 238990 and the related small business size standard is $19M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $25,000.00 and $100,000.00. This procurement will require 100% performance and payment bonds. This sources sought notice is for market research and acquisition planning purposes only. No formal solicitation for this work exists at this time. The work is located at U.S. Bureau of Reclamation, Lake Berryessa Field Office, Napa, California. Interested parties should include the following information in their response: (a) Business name, address, cage code, size classification based on NAICS size standard, socioeconomic classification (i.e. HUBZone; 8(a), etc.), and a point of contact; (b) A positive statement of your intention to submit an offer for this solicitation as a prime contractor; (c) Evidence of your experience performing work similar in type and scope to the work in this announcement within the last five years. The evidence should include: contract numbers, project titles, dollar amounts and points of contacts with telephone numbers. Please do not include more than three past projects; and (d) Include attachments cataloging the company's equipment assets, personnel resources and financial resources that demonstrate company responsibility and capability to perform required work. (e) If bonding is required, also provide evidence of your bonding capacity; All interested parties are encouraged to respond to this notice, by e-mail to rosana_yousefgoarji@ios.doi.gov not later than close of business on 5/21/2026. The information provided in this announcement is all information the Government has available at this time. There are no specifications, drawings, bid packages, or source lists available. System for Award Management (SAM) applies to this procurement. Prospective contractors must be registered in the System for Award Management (SAM) prior to award. Lack of registration in the SAM database will make an offeror ineligible for award. Information on SAM registration can be obtained via the Internet at http://www.sam.gov PRINCIPAL COMPONENTS OF WORK: Principal components of work include: Maintain 13 vehicular access points by re-hanging gates and re-stringing wire where needed. The contractor will repair one pedestrian chicane. They will also replace failing or burned posts, corners (40) and braces (20) with fire-resistant materials. Contractor will correct gaps in approximately 20 existing stream-crossings. | 66% | Market Research | 05/21/2026 |
Additional Details
Solicitation Number
89503126QWA000397
Archive Date
Jun 23, 2026
Office Address
PHOENIX, AZ, 85009