GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM MDT
- Posted
- October 27, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA FOREST SERVICE
- Place of performance
- Beaver, Utah, 84713
- PSC
- Z2LB: REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240LT26Q0106
- Notice ID
- 69a0b83981ac4d3f88949afd81a5d54c
Description
SOLICITATION CANCELLED AS OF OCTOBER 27, 2026. SEE AMENDMENT 0005, ATTACHED
__________________________________________________________________________
On October 09, 2026, amendment 0004 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:
1. Replace Davis Bacon Wages labeled "C04e Attachment 5 General Decision UT20260102 05182026" with Davis Bacon Wages labeled "C05a General Decision UT20260102 05182026."
2. Change submission due date from 10/15/2026 to 10/28/2026.
*****************************************************************************************************************************************************
On September 24, 2026, amendment 0003 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:
1. Post RFI questions and answers labeled C05a Final RFI QA 1240LT26Q0106.
2. Post site visit sign in sheet labeled C05b Site Visit Sign In 1240LT26Q0106.
3. UTILITY TABLES SHALL BE GOVERNMENT FURNSIHED under Line 6 of the notes on page D12 of the drawings is removed in its entirety.
4. Part 2 - Products from specifications SECTION 323125 - COMPOSITE WOOD FENCE is removed in its entirety. See file labeled C05c Attachment 2 Spec 1240LT26Q0106 092426.
5. Extends the due date for quotes from 09/23/2026 to 10/15/2026.
This amendment must be acknowledged and submitted with your proposal.
**********************************************************************************************************************************************
On September 22, 2026 the due date for quotes was extended to October 8, 2026. An amendment will follow that will post the questions and answers thta were received.
***********************************************************************************************************************
On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG
Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:
1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.
2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026
3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026
This amendment must be acknowledged and submitted with your proposal.
***********************************************************************************************************************************************
On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:
- Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.
This SF30 must be acknowledged and submitted with your proposal.
*************************************************************************************************************************************************
The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (19)
- Download
C05_1240LT26Q0106_0005.pdf
100 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
C05a General Decision UT20260102 05182026.pdf
36 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
C05 SF30 1240LT26Q0106-0004.pdf
137 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
C05c SOI KentsLake 05.18.2026.xlsx
19 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
C05b Site Visit Sign In 1240LT26Q0106.pdf
620 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
C05c Attachment 2 Spec 1240LT26Q0106 092426.docx
282 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
C05 SF30 1240LT26Q0106-0003.pdf
106 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
C05a Final RFI QA 1240LT26Q0106.docx
55 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
C05a RFI QA 1240LT26Q0106.docx
33 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05 SF30 1240LT26Q0106-0002.pdf
85 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05b SPECS KentsLakeCG_FINAL_5.2.2026.docx
273 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C05 SF30 1240LT26Q0106-0001.pdf
85 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
C04c Attachment 3 Drawings Kents Lake 1240LT26Q0106.pdf
23 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04f Attachment 6 Kents Lake Site Visit Exhibit 1240LT26Q0106.docx
3.4 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04e Attachment 5 General Decision UT20260102 05182026.pdf
1.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 SF1442 1240LT26Q0106.pdf
340 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04b Attachment 2 Specifications Kents Lake 1240LT26Q0106.docx
288 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04g Attachment 7 FIRE PLAN 1240LT26Q0106.docx
14 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04d Attachment 4 RFI Form 1240LT26Q0106.docx
29 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 2Version 2Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 3Version 3Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 4Version 4Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 5Version 5Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 6Version 6Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 7Version 7Combined Synopsis/Solicitation
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
- 8Version 8Combined Synopsis/SolicitationCurrent
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
Similar Opportunities
- GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Department of Agriculture · Posted 10/21/2026
- Stove Prairie Campground Gate Replacement
Department of Agriculture · Posted 10/20/2026
- GAOA Pine Creek Vault Toilet HTNF
Department of Agriculture · Posted 10/21/2026
- GAOA Grizzly Bear Campground
Department of Agriculture · Posted 10/08/2026
- Sand Trail Phase II
Department of Agriculture · Posted 09/15/2026
Additional Details
Solicitation Number
1240LT26Q0106
Archive Date
Nov 12, 2026
Office Address
WASHINGTON, DC, 20250