Notice ID: d9993a3bd1e04547befc92af5eda1024Combined Synopsis/Solicitation
HVAC Closed Loop Water Test-Treat
Archived on September 6, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC−05:00
- Posted
- August 16, 2022
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541380: Testing Laboratories and Services
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA4407 375 CONS LGC
- Place of performance
- Scott AFB, IL, 62225
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- FA440722Q0009
- Notice ID
- d9993a3bd1e04547befc92af5eda1024
Description
The 375th Contracting Squadron (PKB1) at Scott AFB, IL is contemplating an award to perform HVAC Closed Loop Water Test-Treat located at Scott AFB, IL for the period of 01 Oct 2022 - 30 Sep 2023, subject to availability of funds. Scope of Work is defined in attached Statement of Work (SOW). Also attached is the Wage Determination and National Defense Authorization Act Provisions FAR 52.204-24, FAR 52.204-26, DFARS 252.204-7016, and DFARS 252.204-7017, Attachment 1, Inventory Tab The Contractor shall provide all labor, tools and equipment necessary to perform closed loop water/chemical sampling and treatment for the Heating, Ventilation and Air Conditioning (HVAC) closed loop and coupon rack systems. There are 127 closed loop systems (58 chilled water and 69 hot water), and 23 coupon racks in various facilities on Scott AFB, IL. Please see Attachment 1, Inventory Tab for a list of facilities with the associated closed loops and coupon racks. A Site Visit is scheduled for Wednesday, 10 August 2022 at 9:00am CST at Bldg 50, Scott AFB, IL. Please confirm attendance by 3:00pm CST on Tuesday, 09 August 2022. Questions are due no later than (NLT) Monday, 15 August 2022 at 3:00pm CST. Quotes are due no later than (NLT) Monday, 22 August 2022 at 3:00pm CST. ADDITIONAL INFORMATION TO SOLICITATION FA440722Q0009-QUESTIONS AND RESPONSES FROM 10 AUGUST 2022 SITE VISIT. THIS INFORMATION IS ALSO INCLUDED AS AN ATTACHMENT TO THIS SOLICITATION LABELED "QUESTIONS AND RESPONSES SITE VISIT". The following are questions posed by vendors at the site visit, 10 August 2022, and the responses: 1. On Page 1 of the solicitation, Item #0003, it states Propylene Glycol Inhibited with Nitrite Does this mean this is Glycol and Nitrite Response - Yes 2. On Page 2 of the solicitation, Item #0004 it states Nitrite Is this Nitrite for Hot Loops Response Yes the Nitrite is for Hot Loops, but can be applied to cold loops if needed based on sampling results 3. How many hot loops contain Glycol Response 22 hot loops contain Glycol 4. On Page 1 of the Statement of Work (SOW), paragraph 1.4.2, in reference to Performed Services How will invoicing be evaluated and can additional information be included on the Performed Services document Response As long as the report matches the invoice it will be accepted. You can add columns to the Performed Services. ** QUESTIONS AND RESPONSES FOR NUMBERS 5 AND 6 HAVE BEEN ADDED AS OF 16 AUG 2022. THIS INFORMATION IS ALSO INCLUDED AS AN ATTACHMENT TO THIS SOLICITATION LABELED "QUESTIONS AND RESPONSES-16 Aug 22" 5. Would a business get any additional consideration for having any other designations besides being a small business; i.e. could being an SDVOSB help over just the SBA? Response - There is no additional consideration for having any other designations besides being a small business. 6. How many of the 6000 gallons of Propylene Glycol Inhibited with Nitrite chemical that is quoted was actually used this past year? Response - This is the first year using this product. This current contract year and past contracts we used uninhibited glycol. So far this year we used almost 5000 gallons of uninhibited glycol. In addition to the above questions/responses, when you access the Inventory Tab Attachment 1 available through sam.gov as an attachment to the solicitation (FA440722Q0009), please notice the two tabs at the bottom of the excel spreadsheet one labeled Inventory and another labeled Performed Services as these documents are referenced throughout the SOW.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
FA440722Q0009- Combined Synopsis
- 3×Combined SynopsisCurrentAug 3, 2022
HVAC Closed Loop Water Test-Treat
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Final QUESTIN/ANSWERS Spreadsheet uploaded. _____________________________________________________________________________ QUESTIONS/ANSWERS POSTED. Solicitation extended to 10 Nov 2026, 10am(CT). ______________________________________________________________________________ Amendment 0001 - 1st paragraph page 1, changed quantity of 400 to 100 and 25 to 10. _______________________________________________________________________________ Requirement - Helium Inspection Services. Read all attachments. Please make certain Cage Code is current. | - | Solicitation | 11/10/2026 |
The contractor shall provide all parts, labor, materials, supplies, equipment, transportation, and services necessary to collect drinking water samples on Hurlburt Field, transport them to the contract laboratory, and analyze such samples, including resampling. Services must conform to all, most current, applicable federal regulations and Florida Administrative Codes (F.A.C.). This work is required in accordance with (IAW) Safe Drinking Water Act; Rule 62-550, F.A.C.; Drinking Water Standards; Rule 62-560, F.A.C.; Requirements for Public Water System that are out of Compliance and Department of Defense Instruction 4715.6, and Environmental Compliance. All sampling technicians will follow all applicable Department of Environmental Protection (DEP) Standard Operating Procedures. Amendment 0001: upload Q&A and extend the proposal submission due date. Amendment 0002: Upload additional Q&A and the solicition provisions, clauses, and CLIN structure due to error in system deleting them. Upload an updated SOW. | - | Combined Synopsis | 10/02/2026 |
See attached solicitation package. | - | Combined Synopsis | 11/20/2026 |
Q&A's: 1. CLINs 0001 through 0005 (pages 3-5) are each one firm-fixed-price lot for "Inspection and calibration." SOW paragraphs 1 and 4.2 (pages 1-2) call for lapping only of plates that are out of specification, the QASP (Attachment 0002, page 1) says lapping repairs must be authorized by the CO or COR, and Section G, paragraph 6.a (page 12) asks for labor rates. Should each year's lot price cover inspection and calibration of all 18 plates, with lapping priced separately (for example, a per-plate price or an hourly labor rate) and billed only when authorized? Or should the lot price include all lapping that may be needed that year? If lapping is priced separately, where in the quote should those prices or rates be shown? Answer: Firm fixed for calibration of all plates listed in the SOW. Lapping to be priced separately. We don’t know which plates will require lapping or how much lapping per plate will be needed. We are asking for an hourly rate for lapping. Whether the plate is big or small, the hourly rate would be the same. Plates may require a lot of lapping or very little. Pricing lapping by the plate doesn’t seem to make much sense. 2. Each CLIN (pages 3-5) states "All travel shall be in accordance with the Joint Travel Regulation (JTR)," and SOW paragraph 2 (page 1) says invoices will be checked against the contract prices and JTR approved prices. Should travel be included in each year's firm-fixed lot price, or will it be reimbursed separately at JTR rates? If it is reimbursed separately, how should travel be shown in the quote? Answer: Include estimated travel costs in the firm-fixed pricing. The Vendor that gets the award will bill actual costs after the service. 3. Section G, paragraph 6.c (page 12) asks offerors to "concur at the bottom of the Scope of Work (SOW) and sign," but Attachment 0001 ends at paragraph 15.1 on page 4 with no concurrence or signature block. Is it acceptable to add a signed and dated concurrence statement at the bottom of SOW page 4, or to submit a separate signed concurrence page on company letterhead that references Attachment 0001 dated 15 Oct 26? Answer: Either is fine by me. _______________________ All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action. | - | Combined Synopsis | 11/09/2026 |
The purpose of this Update is to amended documents to answer questions and update the Performance work statment, solicitation, Total Evaluated Price (TEP) Workbook and Quality assurance plan. As such, The final proposal due date is being updated to Oct 23, 2026 at 1:00PM Central Standard Time. Please review all documents for possible changes. Questions shall be submitted electronically via email with subject line FOUO\\INFO: Solicitation 86614126R00002 Technical Question to CO Travis Sutton at Travis.L.Sutton@hud.gov, CS Christopher Rodriguez Christopher.J.Rodriguez@hud.gov on or before September 29, 2026, at 1:00PM Central Standard Time. Responses to technical questions will be posted as an amendment to this notice. 1. Description of Services: The U.S. Department of Housing and Urban Development (HUD) Office of Multifamily Housing requires contractor support to conduct onsite inspections of new construction and substantial rehabilitation of multifamily housing projects and performing various inspection tasks. These services will provide HUD with the field/site data necessary to make informed decisions regarding the construction/rehabilitation phase of HUD multifamily mortgage insurance underwriting and capital advance programs. 2. Acquisition Strategy: The Government is issuing this Request for Proposal (RFP) 86614126R00002 on SAM.gov with the intent to award a Firm-Fixed-Price (FFP)/Indefinite Delivery Indefinite Quantity (IDIQ) contract, in accordance with Revolutionary FAR Overhaul (RFO) 12/15/ as a small business set aside. This is a notice that this order is a total set-aside for small business concerns. Only proposals submitted by small business concerns will be accepted by the Government. Any quote that is submitted by a contractor that is not a small business concern will not be considered for award. 3. Services: The Contractor shall provide services in accordance with the attached Performance Work Statement (PWS), Contract Line-Item Numbers (CLINs), terms and conditions. 4. NAICS Code: 541310 5. Product Service Code (PSC): C219 6. Period of Performance: This contract will consist of one (1) Base Period: 02/01/2027 – 01/31/2032. 7. Contract type: Firm-Fixed-Price (FFP)/Multiple-Award Indefinite Delivery Indefinite Quantity (IDIQ). The government anticipates awarding up to three FFP Multiple-Award IDIQ contract(s) for each of the five (5) regions but reserves the right to combine regions into one contract award if one contractor receives an award for more than one region or expand or reduce the size of a geographic region under an awarded contract. Submitting a proposal for all regions is not required. The government will reject any regional proposal that proposes to only partially perform in the entire region. The resulting contracts will establish the terms, conditions, unit prices, ordering procedures, and maximum ordering limitations applicable to future orders for the required services. The contracts are not intended to constitute a FAR Part 17 multi-year contract or a commitment by the Government to acquire the estimated requirements for each fiscal year of the ordering period. The ordering period may extend across multiple fiscal years. The existence of an ordering period that spans multiple fiscal years does not constitute a Government commitment to acquire services in each fiscal year. Except for the Guaranteed Minimum stated in the contract, the Government does not guarantee that any particular quantity, dollar value, or level of services will be ordered during any fiscal year or during the ordering period. Individual orders will be issued only when the Government has a bona fide requirement and appropriate funding is available. Each order will be separately funded in accordance with applicable fiscal law and the terms of the resulting contract. ORDERING PERIOD The ordering period is established solely to provide the Government with a vehicle for placing orders when requirements arise. The Government does not obligate itself at IDIQ award to purchase the Best Estimated Quantities (BEQs), historical demand quantities, or any other estimated future requirements identified in this Solicitation. The Government may issue no orders or may issue orders in quantities or at times different from the estimates contained in this Solicitation, subject only to the Government's contractual obligations, including the Guaranteed Minimum. The expiration of the ordering period does not constitute a cancellation of a multiyear commitment because the Government is not making a multiyear procurement commitment under this contract. ORDERING Orders shall be issued only by authorized Government personnel in accordance with the Ordering Procedures clause. An order transmitted electronically by an authorized Contracting Officer, including by email when expressly authorized by the Ordering Procedures clause, shall constitute the Government's issuance of the task order. IDIQ Contract Minimum and Maximum Master IDIQ: · Guaranteed minimum: $133,000 · IDIQ maximum ceiling: $37,000,000 For each awarded IDIQ contract: · Guaranteed Minimum Per Region: Northeast Region: $23,000 Southeast Region: $25,000 Southwest Region: $45,000 West Region: $30,000 Midwest Region: $10,000 · Maximum IDIQ Ceiling Per Region: Northeast Region: $6,409,000 Southeast Region: $8,094,000 Southwest Region: $11,818,000 West Region: $8,286,000 Midwest Region: $2,354,000 The guaranteed minimum is the Government's minimum contractual obligation under the IDIQ contract. The maximum IDIQ ceiling is the maximum aggregate quantity/value that may be ordered under the contract, unless otherwise expressly authorized by the contract. Task-Order Limitations The minimum and maximum order limitations stated in FAR 52.216-19, as completed in this solicitation, apply to individual task orders and are separate from the guaranteed minimum and maximum ceiling of the IDIQ contract. 8. Place of performance: LOCATION OF REGIONS AND FEDERAL HOUSING ADMINISTRATION ZONES The contractor must perform the services (i.e., projects) in the following MF Housing (MFH) Region: *** To Be Determined (TBD) at Time of Award *** Northeast Region (by FHA zone): Washington D.C (000) and 13 States: Connecticut (017), Delaware (032), Maine (022), Massachusetts (023), Maryland (052), New Hampshire (024), New Jersey - North (031) and South (035), New York - Buffalo (014) and New York City (012), Pennsylvania - East (034) and West (033), Rhode Island (016), Vermont (026), Virginia (051), and West Virginia (045). Southeast Region (by FHA zone): Puerto Rico/US Virgin Islands (056) and 8 States: Alabama (062), Florida - North (063), Central (067), and South (066), Georgia (061), Kentucky (083), Mississippi (065), North Carolina (053), South Carolina (054), and Tennessee - Knoxville (087), Memphis (081), Nashville (086). Midwest Region (by FHA zone): 6 States: Illinois - Chicago (071) and Springfield (072), Indiana (073), Michigan - Detroit (044), Grand Rapids (047), and Flint (048), Minnesota (092), Ohio - Cleveland (042), Columbus (043) and Cincinnati (046), and Wisconsin (075). Southwest Region (by FHA zone): 9 States: Arkansas (082), Iowa (074), Kansas (102), Louisiana (064), Missouri - East (085) and West (084), Nebraska (103), New Mexico (116), Oklahoma - East (118) and West (117), and Texas - Fort Worth (113), Houston (114), and San Antonio (115). West Region (by FHA zone): 14 States: Alaska (176), Arizona (123), California - Los Angeles (122), Riverside (143), San Diego (129), San Francisco (121) and Northern California (136), Colorado (101), Hawaii (140), Idaho (124), Montana (093), Nevada (125), North Dakota (094), Oregon (126), South Dakota (091), Utah (105), Washington - Spokane (171) and Seattle (127), and Wyoming (109). 9. On-ramp/off-ramp provisions a. ON-RAMP PROCEDURES The Government may conduct an on-ramp during the ordering period when the Contracting Officer determines that additional contract holders are necessary or advantageous to meet Government requirements, increase competition, increase the availability of qualified small businesses, or otherwise support the Government's mission. Any on-ramp competition will be conducted pursuant to a new solicitation or other lawful competitive procedure and will use evaluation criteria and material contract terms consistent with the requirements established for the existing contract vehicle, to the maximum extent permitted by applicable law and regulation. An on-ramp award will not extend the ordering period of the existing contract. The Government does not guarantee that an on-ramp will be conducted or that any additional contract will be awarded. b. OFF-RAMP PROCEDURES The Government may remove a Contractor from the active ordering pool or decline to continue the Contractor's participation in a subsequent ordering period when authorized by the contract and applicable law. Potential grounds for off-ramping may include, but are not limited to: Failure to submit a proposal in response to multiple task-order solicitations when the Contractor was eligible and required to participate; Failure to receive an order during a specified evaluation period, when the solicitation or contract expressly establishes such criterion; Failure to satisfy material contract performance requirements; Repeated failure to satisfy required deliverables or quality standards; Failure to maintain required eligibility or representations; and Other objective criteria expressly identified in the contract. In evaluating whether off-ramping is appropriate, the Government will give priority consideration to relevant past performance on earlier orders under the contract, consistent with applicable law and the evaluation methodology stated in the contract. Off-ramping will not be based solely on a Contractor's failure to receive an order unless the solicitation expressly identifies such failure as an off-ramp criterion and the criterion is applied consistently. c. TEAMING ARRANGEMENTS After award, a Contractor may not add, remove, or substitute team members in a manner that materially changes the basis on which the Government evaluated the Contractor's proposal unless such change is permitted by the contract and applicable law and is approved by the Contracting Officer. Nothing in this provision authorizes a Contractor to modify its post-award teaming arrangement in a manner that circumvents the competition requirements applicable to the contract. 10. Questions: Questions shall be submitted electronically via email with subject line FOUO\\INFO: Solicitation 86614126R00002 Technical Question to CO Travis Sutton at Travis.L.Sutton@hud.gov, CS Christopher Rodriguez Christopher.J.Rodriguez@hud.gov on or before September 29, 2026, at 1:00PM Central Standard Time. Responses to technical questions will be posted as an amendment to this notice. 11. Proposal Submission: Proposals shall be submitted electronically via email with subject line FOUO\\INFO: Solicitation 86614126R00002 – (Insert Company Name and Region). to CO Travis Sutton at Travis.L.Sutton@hud.gov, Christopher Rodriguez at Christopher.J.Rodriguez@hud.gov on or before the closing date of October 23, 2026, at 1:00PM Central Standard Time. Email Submission Size Limitation: Email messages and attachments submitted to HUD shall comply with HUD's maximum email message/file size limitation of 28 megabytes (MBs). If a proposal submission exceeds this limitation, the Offeror shall use additional emails. Offerors are responsible for ensuring timely receipt of their complete proposal in accordance with the submission instructions. Alternate proposals: The solicitation does not authorize offerors to propose alternative terms and conditions or line items. Such alternate proposals will be considered non-compliant / non-conforming, technically unacceptable, and ineligible for award. Alternate proposals will not be evaluated. Alternate proposals will be eliminated and not further evaluated. 12. HUD Contacts: Contracting Officer: Travis Sutton Travis.L.Sutton@hud.gov Contract Specialist: Christopher Rodriguez at Christopher.J.Rodriguez@hud.gov | - | Solicitation | 10/23/2026 |
Additional Details
Solicitation Number
FA440722Q0009
Archive Date
Sep 6, 2022
Office Address
SCOTT AFB, IL, 62225-5015