PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM CDT
- Posted
- July 15, 2026
- Notice type
- Solicitation
- Set-aside
- Women-Owned Small Business
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
- Place of performance
- Yuma, Arizona
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912DY26RA107
- Notice ID
- d163bbe08eee4f0cac774eb131a9a25e
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (14)
- Requires SAM.gov sign-in
Solicitation Amendment - W912DY26RA1070001 Professional Appearance.pdf
2.8 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
Solicitation - W912DY26RA107 Professional Appearance.pdf
2.8 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
JET ENGINE TEST CELL B310 AB.pdf
148 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment 1 PWS FY26 USMC Yuma AZ Pre-Demo Survey.pdf
314 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
BEQ 913_As builts.pdf
38 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B662.pdf
34 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B1060 BOQ AS-BUILTS 1958.pdf
17 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0661.pdf
188 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0660.pdf
144 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0914-3.pdf
34 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0914-1.pdf
38 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0500.pdf
86 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0914-2.pdf
28 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment 2_FY26_Yuma Proving Ground (Survey)_Price Spreadsheet.xlsx
14 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1Solicitation
Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona
- 2Version 2Solicitation
Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona
- 3Version 3SolicitationCurrent
PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled. | - | Solicitation | 05/07/2026 |
*****Amendment 00010**** The purpose of this amendment is to notify offerors of the removal of Clause 252.215-7993, Proposal Adequacy Checklist and to notify Offerors that CMMC information is required at Task Order level. The MSDS selection referenced IAW FAR 52.223-3, was included in error and is not applicable at the base contract level. ****FINAL Solicitation Amendment 0003- The purpose of Amendment 0003 to the Final Solicitation is to notify that Section C has been removed from the solicitation document and is now provided as Attachment 21. Additionally, this amendment provides updated revisions for Attachment 17 (Estimated Quantities), Attachment 18 (Section L), and Attachment B, as well as provide FRP Contractor Questions and Answers dated 08 September 2026. The Amended Solicitation has also been provided. THESE ARE NOTED CHANGES, HOWEVER, IT IS THE OFFERORS RESPONSIBILITY TO REVIEW THE AMENDMENT IN ITS ENTIRETY AND IDENTIFY ALL CHANGES. THE SUBMISSION RESPONSE DATE IS 24 September 2026***** | - | Solicitation | 09/24/2026 |
/// AMENDMENT 3:The purpose of this amendment is to add Attachment 5 Pre-Demolition Survey and add the following verbiage to PWS Paragraph 5.1: Attachment 5 Pre-Demolition Survey is the ACM conducted in 2011 which indicated possible Asbestos in the building. Two additional asbestos surveys were later conducted finding no record of asbestos in the building. Per Fort Drum environmental engineers, this meets NYS Code Rule 56 and no additional pre-demolition surveys are required. All other terms and conditions remain the same. END AMENDMENT 3. /// ///AMENDMENT 2: The purpose of this amendment is to post the Questions and Answers and extend the quote due date from 31 July 2026 to 07 August 2026 at 10:00 AM Eastern time. Attachment 1 Performance Work Statement is updated adding paragraphs 5.2.1.14 and 5.2.4. Attachment 3 500 Area Drawings is updated to include a slide showing the area required to be fenced. Attachment 4 Test Results is added providing the results of the environmental testing of the site. All other terms and conditions remain the same. END AMENDMENT 2///AMENDMENT 1: The purpose of this amendment is to add Attachment 3 500 Area Drawings. All other terms and conditions remain the same. END AMENDMENT 1/// Fort Drum, New York has a requirement for WWII Building Demolition. This requirement is set-aside 100% small business set aside under NAICS 238910 Site Preparation Contractors, size standard is $19 million. A site visit will be conducted on 23 July, 2026 at 1:00 PM Eastern time. The meeting place will be held in Conference Room 103, located at 4205 Po Valley Rd, Fort Drum, NY 13602. To access Fort Drum, contractors shall be restricted to physically sign in at Paul Cerjan Gate for entry, unless they have a Department of Defense (DoD) issued ID card, a local temporary pass, or a local access badge (LAB). For contractors who do not have access will need to visit the welcome center Bldg. 11008 outside of Paul Cerjan (Main) gate with a picture identification (must be Real ID compliant), registration, and proof of insurance to gain a one-day pass. The visitor center is open 5:30 a.m. to 10:00 p.m. seven days a week. Offerors MUST notify the Contracting Officer and Contract Specialist by email of intent to attend the site visit no later than 23 July, 2026 at 10:00 AM Eastern Time. Questions are due no later than 27 July, 2026, at 10:00 AM Eastern time. Quotes are due on 31 July, 2026 at 11:00 AM Eastern Time. The Offeror shall provide all information and requirements listed in Addendum to FAR 52.212-1 on page 22 of this solicitation. All quotes shall be submitted electronically via the PIEE Solicitation Module. Quoters shall nominate a Proposal Manager in the PIEE Solicitation Module. The Proposal Manager shall respond and post quotes to this solicitation in the PIEE Solicitation Module. For information and training on how to add the role to the quoter?s profile, the functions of the Proposal Manager, and how to post an offer/bid/quote, go to https://piee.eb.mil/. Log on to PIEE; select Help; select New User Information and Help; select Web Base Training. | - | Solicitation | 08/07/2026 |
Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.) | - | Combined Synopsis | 06/15/2026 |
Sources Sought Notice for the Demolition and Decommissioning of the General Leonard Wood Army Community Hospital (GLWACH) Contract. This requirement was previously published on SAM.gov as the seed project for the Dismantling, Demolition, and Removal of Improvements Multiple Award Task Order Contract (MATOC). The U.S. Army Corps of Engineers, Kansas City District intends to solicit and award a Design-Build (DB) contract for the demolition and decommissioning of the General Leonard Wood Army Community Hospital on Fort Leonard Wood, Missouri. The demolition of the former General Leonard Wood Army Community Hospital (GLWACH) consists of the complete removal of the following buildings: hospital and clinic (B310), Central Utility Plant (B311), and temporary Helipad. The building demolition will ensure that the connected Optical Fabrication Lab (B311) remains with limited to no degradation to operations. The Government proposes to issue a single firm fixed price type contract for this project. This Sources Sought notice is for market research and planning purposes only. This does not constitute a solicitation and shall not be construed as a commitment by the Government to award a contract from responses to this announcement, nor does it obligate the Government to produce a solicitation in the future. Any information submitted by interested parties is strictly voluntary and no monetary compensation will be provided for response preparation or follow-up requests. The purpose of this Sources Sought Notice is to gain knowledge of potential and interested qualified contractors capable of performing hazardous material abatement, building demolition, decommissioning services, and removal of improvements. This effort is classified through the North American Industry Classification System (NAICS) under 238910 Site Preparation Contractors. The small business size standard for NAICS 238910 is $19M. The magnitude of this project is more than $10,000,000.00. It is anticipated that a solicitation announcement will be published on SAM.gov in mid-2026. The following information is requested in this Sources Sought (SS) announcement: 1. Firm’s name, address, email address, website address, telephone number, and point of contact. 2. Firm’s CAGE Code and UEI number. 3. Company size (Small or Large), in accordance with the NAICS 238910. 4. If a Small Business, specify if your company is any of the following: Small Disadvantaged Business, Service-Disabled Veteran Owned Small Business (SDVOSB); Veteran Owned Small Business, HUBZone Small Business; 8(a) Small Business concern; or Women-Owned Small Business. 5. Firm’s interest in providing a proposal as the prime contractor on the pending solicitation once issued. 6. Experience: Evidence of capabilities to perform work comparable to that required for the project. 7. Provide a maximum of 3 recent (within the last 6 years) relevant/comparable projects and describe how they are similar to this project. Include the project name; when the project was completed; dollar value of the project; description of the key/salient features of the project, identify the contracting office & the customer/user (include POC information). Construction Bonding level per contract and aggregate construction bonding level, both expressed in dollars. A summary of the scope is below: Abatement of hazardous materials and environmental liabilities within GLWACH and other facilities to be demolished Demolition of GLWACH (472,600sf) and Primary Care Clinic structures, including foundations. Demolition of Central Utility Plant Demolition of Fuel Tanks Demolition of utilities, paving and other site appurtenances, within the boundaries identified. Demolition of communications infrastructure to various buildings that are currently served from GLWACH. Demolition of temporary Helipad. Construction of new exterior wall between Regional Optical Fabrication Lab and GLWACH. Construction of storm drainage and detention Backfill and establishment of turf following removal of building foundations. Decommissioning Statement The contractor shall remove all debris, and any other material not otherwise tagged for salvage or reuse on the project (examples are existing attic stock, old architectural drawings, spare parts & materials, files, etc.) 1. Decommission medical air, vacuum, and gas systems: a. Disconnect master medical gas alarm b. Disconnect zone medical gas alarms. c. Remove medical gas manifolds d. Remove medical air pumps e. Remove medical vacuum pump and tank f. Remove dental air pump g. Remove dental vacuum pumps and tank h. Purge and cap medical gas system throughout MTF. Cut and cap MED gas at main entry point, then purge lines at each valve and tag “NOT IN USE” i. Remove spit tank, filter, and dispose of contaminant off post. 2. Decommission medical low-voltage systems: a. Disable temperature monitoring system. b. Deactivate and remove pharmacy duress visible components. c. Deactivate and remove Infant Abduction System/HUGS systems and visible components. d. Remove all information technology (IT) switches. e. Deactivate and remove ceiling mounted Wi-Fi antennas and repeaters f. Deactivate and remove ceiling and external mounted cameras. 3. Decommission HVAC systems: a. Clean and cap laboratory & radiology vent hoods, dispose of filters, and remove hazardous signs. b. Disconnect all HVAC lines for refrigerant systems. c. Cut and cap chilled water (CHW) from central utility plant (CUP) d. Drain and purge HVAC CHW and reheat hot water (RHW) in CUP e. Drain and purge glycol from all HVAC systems. 4. Decommission wastewater systems and laboratory systems: a. Survey drains and P-traps in Dental and Laboratory for mercury contamination; remove all sink P-traps and remediate. b. Dental vacuum lines in dental clinic are contaminated for mercury, remove vacuum lines from dental clinic to storage tank. 5. Decommission Nutrition Care Division (NCD) and Sterile Processing Department (SPD): a. Cut and cap steam lines. 6. Decommission/Deactivate Fire Suppression Systems: a. Deactivate and secure range hood fire suppression systems in NCD kitchen. b. Deactivate the Data Center FM200 suppression systems; remove and dispose of storage tanks. c. Deactivate carbon dioxide extinguishing system in emergency generator room; remove and dispose of storage tanks. d. Dispose of the left-over fire extinguishers. 7. Decommission Hydraulic Elevators (2): a. Drain and purge hydraulic oil from elevators (2) from GLWACH. b. Contractor shall dispose of oil off post. 8. Decommission Two Diesel Fuel Tank (approximately 10,000 Gallons) located next to CUP in an exterior closure. a. Drain and purge diesel from tanks and lines going to generator and fire pump. b. Contractor shall take possession of fuel. The responses must be specific to the qualifications listed above to show that the respondent is qualified and possesses the necessary skills, experience, and capabilities. If a response does not clearly demonstrate that the respondent meets the qualifications, possesses the necessary skills, experience, and capability the response will not be considered as confirmed capability for the purposes of market research. Please send your Sources Sought responses via email to stephanie.r.kretzer@usace.army.mil and jeri.l.halterman@usace.army.mil. Submissions should be received by 10:00 a.m. Central Daylight Time (CDT), March 20, 2026. | - | Market Research | 03/20/2026 |
Additional Details
Solicitation Number
W912DY26RA107
Archive Date
Jul 15, 2027
Office Address
REDSTONE ARSENAL, AL, 35898-0000